Design guide for full-face blasting in highway tunnel (고속도로 터널에 대한 전단면 발파 설계방안 연구)

  • Lee, Sang-Don;Choi, Hae-Moon;Lee, Hyun-Koo;Ryu, Chang-Ha
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.930-937
    • /
    • 2004
  • In tunnel blasting, rock damage and overbreak at excavation limits are strongly related to stability of the tunnel and cost for rock support, and also affect to maintenance after tunnel construction. In this study, many field tests and measurements have been carried out in highway tunnels so that discordance between blast design and practical production blasting could be settled and actual methods of over break control could be proposed through the understanding of the problems in existing blasting patterns. Test blasting in tunnel was carried out many times in two tunnel sites. Also, long hole blasting longer than existing blasting pattern was executed for good grade of rock mass whose RMR value is more than 60. Using the results of test blasting, new standard blasting patterns for two lane tunnel were proposed. As a result of profile measurement after blasting, drilling is a major factor of overbreak. And then the methods for minimizing overbreak were adapted in new blasting patterns.

  • PDF

A study on the characteristics for temporary ventilation of long subsea tunnels - focused on the current situation and improvement requirements (초장대 해저터널의 공사중 환기 특성에 관한 기초연구 - 현황 및 개선필요사항 중심)

  • Jo, Hyeong-Je;Chun, Kyu-Myung;Kim, Jong-Won;Lee, Ju-Kyung
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.2
    • /
    • pp.153-166
    • /
    • 2015
  • Long subsea tunnel to be built below the seabed, as compared to the general railway tunnel, is subject to many restrictions in terms of spatial limitation when vertical or inclined shafts are built for the purpose of ventilation and fire safety. So, the construction of some artificial island is required to provide ventilation. But, because of construction difficulty and cost increase, it is necessary to minimize the artificial island construction. The longer ventilation distance is, the more fresh air requirement is needed. When supply airflow becomes excessive, duct size is restricted by the limitations of structure clearance and fan pressure and power increase exponentially. Therefore, in order to build a long subsea tunnel, it is necessary to overcome these practical problems and to develop technical solution that can keep the comfortable condition of tunnel environment during construction. In this study, as on ventilation method development suitable for long subsea tunnel, through comparison of temporary ventilation capacity calculation methods during construction phase, domestic and abroad, the application of Swiss SIA 196 code is found suitable for long subsea tunnel. And, through experiment on leakage of the duct connector, we confirmed that the leakage ratio per 100 m of domestic duct connection type is between 1.5~3.0%. Based on S-class duct of SIA 196 code, ventilation distance is 10.2 km, So, ventilation distance can be longer if duct connection method is improved. So, we confirmed that the improvement of leakage ratio is key issue in the construction-phase ventilation of long subsea tunnel.

The review about ultra long subsea tunnel design under high water pressure (고수압 초장대 해저터널에 관한 연구)

  • Jun, Duk-Chan;Kim, Ki-Lim;Hong, Eui-Joon;Kim, Chan-Dong;Lee, Young-Joon;Hong, Cheor-Hwa
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.6
    • /
    • pp.829-843
    • /
    • 2017
  • Subsea tunnel needs to be built over 50 km long to connect between nations and continents. However there are only 19 tunnels longer than 5 km until recently. And there is no history of constructing and operating tunnel longer than 50 km. In Korea, subsea tunnels with a length of more than 50 km are being planned, such as Korea~Japan, Korea~China, Honam~Jeju subsea tunnels. Because of the geographical conditions of Korea, most of these tunnels are inter-contry tunnels. So technology preemption for the subsea tunnel construction is getting more and more important. Most of these subsea tunnels are ultra-long tunnels under high water pressure conditions. So new technologies are required such as ventilation and disaster prevention of high-speed tunnels, securing of structural stability under high pressure conditions, and pressure reduction in high-speed conditions. These technologies are different from those of ground tunnels. Therefore, this paper describes the ultra-long subsea tunnel design under high water pressure of maximum 16 bars through the Honam (land) - Jeju (island) virtual subsea project. We proposed a reasonable solution to various problems such as securing structural stability in high pressure condition and ventilation disaster prevention system of ultra long-tunnel.

A case study on squeezing behavior of Pinglin tunnel in Taiwan (Taiwan의 Pinglin 터널에서의 Squeezing 거동 분석 사례 연구)

  • Yun, Il-Joong;Yoo, Ki-Cheong
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.1358-1365
    • /
    • 2010
  • A case study deals with Squeezing behavior under tunneling. Squeezing stands for large time-dependent convergence during tunnel excavation. Squeezing can occur in both rock and soil as long as the particular combination of induced stresses and material properties pushes some zone around the tunnel beyond the limiting shear stress at which creep starts. Under squeezing rock conditions, If the support installation is delayed the rock mass moves into the tunnel and a stress redistribution takes place around it. On the contrary, if deformation is restrained, squeezing will lead to long-term load build-up of rock support. This paper shows analysis case mutually with monitoring and numerical analysis result of squeezing behavior of Pinglin tunnel in Taiwan.

  • PDF

Numerical modeling of coupled structural and hydraulic interactions in tunnel linings

  • Shin, J.H.
    • Structural Engineering and Mechanics
    • /
    • v.29 no.1
    • /
    • pp.1-16
    • /
    • 2008
  • Tunnels are generally constructed below the ground water table, which produces a long-term interaction between the tunnel lining and the surrounding geo-materials. Thus, in conjunction with tunnel design, the presence of water may require a number of considerations such as: leakage and water load. It has been reported that deterioration of a drainage system of tunnels is one of the main factors governing the long-term hydraulic and structural lining-ground interaction. Therefore, the design procedure of an underwater tunnel should address any detrimental effects associated with this interaction. In this paper an attempt to identify the coupled structural and hydraulic interaction between the lining and the ground was made using a numerical method. A main concern was given to local hindrance of flow into tunnels. Six cases of local deterioration of a drainage system were considered to investigate the effects of deterioration on tunnels. It is revealed that hindrance of flow increased pore-water pressure on the deteriorated areas, and caused detrimental effects on the lining structures. The analysis results were compared with those from fully permeable and impermeable linings.

Analysis of Smoke Control According to Jet Fan Location in Straight Long Tunnel (제트 팬 설치 위치에 따른 직선터널 내의 제연해석)

  • Byun, Ju-Suk;Lim, Hyo-Jae;Kang, Shin-Hyung;Lee, Jin-Ho
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.19 no.9
    • /
    • pp.662-668
    • /
    • 2007
  • In this study, jet fans are installed with 4 cases in the straight long tunnel; inlet-side setup, middle-side setup, outlet-side setup, and dispersion setup. A bus is selected as fired car, of which fire size is 20MW. And fired car locates at 100m, 700m, 1500m position from tunnel inlet, respectively. FLUENT, commercial finite-volume code, is used to analyze the performance. The velocity profile, $CO_2$ concentration, temperature distribution are examined for analysis. Performance of smoke control is compared by the backlayering length. Consequently, inlet-side setup of jet fans is a little more efficient than other cases considering the fire occurrence frequency in tunnel.

Experimental Study on the Interval of Emergency Exits in Long Traffic Tunnels (장대 교통터널의 피난연락갱 설치 간격에 관한 실험적 연구)

  • Yoo Yongho;Yoon Sungwook;Kim Jin;Yoon Chanhoon
    • Tunnel and Underground Space
    • /
    • v.15 no.1 s.54
    • /
    • pp.61-70
    • /
    • 2005
  • The objective of this study was to analyze the smoke movement for the case of fire and to determine the interval between emergency exits in long tunnels. Based on Froude modeling, the 1/50 scaled model tunnel (20 m long) was constructed by acrylic tubes and tests were carried out systematically. From the strong relationship between CO propagation time and distance through the tunnel, it was found that the optimal escaping time was 6 minutes in case of 20MW fire. But, regarding passengers' psychological state under fire, another one minute of delay time should be considered. Therefore, the total escaping time should be estimated by 5 minutes. The interval between the emergency exits for vehicle passengers was calculated by 250 m with respect to the 5 minute of escaping time.

Tunnel-Lining Back Analysis for Characterizing Seepage and Rock Motion (투수 및 암반거동 파악을 위한 터널 라이닝의 역해석)

  • Choi Joon-Woo;Lee In-Mo;Kong Jung-Sik
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2006.04a
    • /
    • pp.248-255
    • /
    • 2006
  • Among a variety of influencing components, time-variant seepage and long-term underground motion are important to understand the abnormal behavior of tunnels. Excessiveness of these two components could be the direct cause of severe damage on tunnels. however, it is not easy to quantify the effect of these on the behavior of tunnels. These parameters can be estimated by using inverse methods once the appropriate relationship between inputs and results are clarified. Various inverse methods or parameter estimation techniques such as artificial neural network and least square method can be used depending on the characteristics of given problems. Numerical analyses, experiments, or monitoring results are frequently used to prepare a set of inputs and results to establish the back analysis models. In this study, a back analysis method has been developed to estimate geotechnically hard-to-known parameters such as permeability of tunnel filter, underground water table, long-term rock mass load, size of damaged zone associated with seepage and long-term underground motion. The artificial neural network technique is adopted and the numerical models developed in the firstpart are used to prepare a set of data for learning process. Tunnel behavior especially the displacements of the lining has been exclusively investigated for the back analysis.

  • PDF

A Case Study on the Construction of Concrete Lining in Parallel with Blasting in a Long Tunnel (장대터널 굴착시 발파-라이닝 병행시공 사례연구)

  • Ryu Joung-Hoon;An Hyung-Jun;You Jin-O;Choi Byung-Hee
    • Explosives and Blasting
    • /
    • v.24 no.1
    • /
    • pp.39-48
    • /
    • 2006
  • The various alternatives to reduce the construction period and cost in the wide and long tunnel have been attempted recently. However, the concrete lining forming process after finishing tunnel excavation may delay construction period considering the specific conditions of the wide and long tunnel. The concrete lining is indispensible for the road tunnel. For this reason, the blasting-lining synchronizing study had been carried out to reduce construction period in the Gyea-Ryong Tunnel. Lining models were installed at four different distance conditions the floor of the tunnel. After model installation, hundreds of blasting vibration measurements and concrete material tests were performed to calculate the safe distance between blasting point and concrete lining form. The study also introduces a method which can obtain the better ability of construction by improving working environment with the ventilation and the relocation of tunnel equipments in the working places.

A Case study on the construction of a long tunnel in the youngdong railroad (Mt. Dongbaek-Dokye) (영동선 동백산-도계간 장대터널 시공사례 연구)

  • Kim, Yong-Il;Yoon, Young-Hoon;Cho, Sang-Kook;Yang, Jong-Hwa;Lee, Nai-Yong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.4 no.2
    • /
    • pp.155-165
    • /
    • 2002
  • This paper presents a case study on the construction of a long tunnel named as "Solan tunnel", which connects between Mt. Dongbaek station and Dokye station in the Youngdong Railroad. The tunnel will be the longest tunnel with length of 16.4 km in Korea when completed. The tunnel site is located in a complex geological region with faults, cavities and coal measures. In construction of adit No. 2, geophysical investigation methods such as electrical resistivity method and GPR(Ground Penetration Radar) were used to detect faults, cavities and coal measures in advance with some success. The geophysical investigation results and in-situ boring data were used as feedback to improve tunnel reinforcement design. Also, the tube umbrellas of grouted steel pipes were found to have a good reinforcement and grouting effects in zones of faults, cavities. In zones of coal measures, swellex rockbolts with mortar grouting were verified as successful.

  • PDF