In tunnel blasting, rock damage and overbreak at excavation limits are strongly related to stability of the tunnel and cost for rock support, and also affect to maintenance after tunnel construction. In this study, many field tests and measurements have been carried out in highway tunnels so that discordance between blast design and practical production blasting could be settled and actual methods of over break control could be proposed through the understanding of the problems in existing blasting patterns. Test blasting in tunnel was carried out many times in two tunnel sites. Also, long hole blasting longer than existing blasting pattern was executed for good grade of rock mass whose RMR value is more than 60. Using the results of test blasting, new standard blasting patterns for two lane tunnel were proposed. As a result of profile measurement after blasting, drilling is a major factor of overbreak. And then the methods for minimizing overbreak were adapted in new blasting patterns.
일반적인 장대 철도터널에 비해 해저터널은 환기 및 방재를 위한 별도의 연직갱 또는 경사갱 설치에 공간상 많은 제약을 받게 되므로, 인공섬을 건설하여 환기를 수행할 필요가 있다. 그러나, 인공섬 설치에는 시공상의 문제 뿐만 아니라 건설비용이 증가하게 되므로, 인공섬 설치를 최소화하여 환기구간 거리를 늘려야 한다. 이에 따른 환기거리의 증가시, 누풍에 의한 신선공기 공급량이 커지게 된다. 공급풍량이 과대해지면, 구조물 한계에 의해 설치가능한 덕트직경이 제한적이므로, 팬 정압 및 동력도 상당히 증가하게 된다. 따라서, 초장대 해저터널을 건설하기 위해서는 이러한 현실적인 문제를 극복하고, 시공중 터널내 환경을 쾌적한 상태로 유지할 수 있는 기술력이 필요하다. 본 논문에서는 이러한 초장대 해저터널에 적합한 공사중 환기 방식을 개발하기 위한 기본연구로써, 국내외의 공사중 환기용량 산정방법 비교를 통해, 스위스의 SIA 196 코드가 초장대 해저터널계획에 적합함을 확인하였다. 또한, 덕트 접속부의 누출에 관한 실험을 통해, 국내의 덕트 접속방식은 100 m당 누풍율이 1.5~3.0% 사이임을 확인하였다. S등급 덕트의 경우 환기가능거리가 10.2 km 이므로, 덕트의 접속방법을 개선한다면, 환기가능거리는 더 길어질 수 있다. 따라서, 공사중 덕트의 누풍개선이 초장대 해저터널의 공사중 환기의 주요 이슈임을 확인하였다.
최근 국가간 대륙간의 정치 경제 문화의 통합에 따른 여객 및 물류수송의 증가로 인해 이를 수용할 수 있는 교통 시스템 건설을 위한 필수적 요소 중 하나인 해저터널의 필요성이 대두됨에 따라 해저터널의 연장이 점차 증가되는 추세에 있다. 하지만, 현재 연장 5 km 이상의 해저터널은 19개가 건설되어 있으나, 연장 50 km 이상의 해저터널 시공 및 운영사례는 전무한 실정이다. 우리나라의 경우에는 한 중 해저터널, 한 일 해저터널, 호남~제주 해저터널 등 연장 50 km 이상의 해저터널이 계획 중에 있으며, 지역특성상 국가간 연결터널이 대다수로서, 해저터널 건설에 대한 기술선점의 중요성이 더욱더 크게 대두되고 있다. 이러한 해저터널은 대부분 초장대의 고수압 조건에 건설됨에 따라, 초장대 터널에서의 환기 및 방재기술, 고수압 조건에서의 구조적 안정성 확보기술, 열차고속화에 의한 공력저감기술 등 육상터널과는 다른 새로운 개념의 건설기술들이 종합적으로 요구되나, 유로터널 등 기존사례의 기술수준 반영 시에는 과도한 건설비와 건설기간이 소요된다. 이에, 본 논문에서는 호남~제주 구간에 대한 가상설계를 통하여 현재 설계 및 시공사례가 없는 고수압(최대수심 160 m), 초장대(총 연장 108 km), 고속철도(설계속도 350 km) 터널의 구조적 안정성 확보, 시공 중 및 운행 시 효율적 환기 방재 시스템 확립 등 다양한 문제점들에 대한 합리적인 해결방안을 제시하였다.
A case study deals with Squeezing behavior under tunneling. Squeezing stands for large time-dependent convergence during tunnel excavation. Squeezing can occur in both rock and soil as long as the particular combination of induced stresses and material properties pushes some zone around the tunnel beyond the limiting shear stress at which creep starts. Under squeezing rock conditions, If the support installation is delayed the rock mass moves into the tunnel and a stress redistribution takes place around it. On the contrary, if deformation is restrained, squeezing will lead to long-term load build-up of rock support. This paper shows analysis case mutually with monitoring and numerical analysis result of squeezing behavior of Pinglin tunnel in Taiwan.
Tunnels are generally constructed below the ground water table, which produces a long-term interaction between the tunnel lining and the surrounding geo-materials. Thus, in conjunction with tunnel design, the presence of water may require a number of considerations such as: leakage and water load. It has been reported that deterioration of a drainage system of tunnels is one of the main factors governing the long-term hydraulic and structural lining-ground interaction. Therefore, the design procedure of an underwater tunnel should address any detrimental effects associated with this interaction. In this paper an attempt to identify the coupled structural and hydraulic interaction between the lining and the ground was made using a numerical method. A main concern was given to local hindrance of flow into tunnels. Six cases of local deterioration of a drainage system were considered to investigate the effects of deterioration on tunnels. It is revealed that hindrance of flow increased pore-water pressure on the deteriorated areas, and caused detrimental effects on the lining structures. The analysis results were compared with those from fully permeable and impermeable linings.
In this study, jet fans are installed with 4 cases in the straight long tunnel; inlet-side setup, middle-side setup, outlet-side setup, and dispersion setup. A bus is selected as fired car, of which fire size is 20MW. And fired car locates at 100m, 700m, 1500m position from tunnel inlet, respectively. FLUENT, commercial finite-volume code, is used to analyze the performance. The velocity profile, $CO_2$ concentration, temperature distribution are examined for analysis. Performance of smoke control is compared by the backlayering length. Consequently, inlet-side setup of jet fans is a little more efficient than other cases considering the fire occurrence frequency in tunnel.
본 연구에서는 장대 터널 화재시 연기의 거동 특성 파악과 피난연락갱의 설치간격을 결정하기 위하여 축소 모형실험을 실시하여 그 결과를 분석하였다. Froude 상사를 기본으로 1/50로 축소하여 20 m의 모형 터널을 제작하여 실험하였다. 터널 내 20 MW의 화재가 발생 하였을 경우 CO의 전파 속도와 거리와의 관계를 이용하여 피난연락갱의 위치를 검토한 결과, 승객들의 피난시간은 6분이 적절하나 화재시 승객들의 심리적 상태를 고려하여 1분여의 지체시간을 생각하면 실제의 피난시간은 5분 정도가 될 것이므로 최대 간격 250m로 대인용 피난연락갱을 설치하는 것이 바람직할 것으로 판단되었다.
Among a variety of influencing components, time-variant seepage and long-term underground motion are important to understand the abnormal behavior of tunnels. Excessiveness of these two components could be the direct cause of severe damage on tunnels. however, it is not easy to quantify the effect of these on the behavior of tunnels. These parameters can be estimated by using inverse methods once the appropriate relationship between inputs and results are clarified. Various inverse methods or parameter estimation techniques such as artificial neural network and least square method can be used depending on the characteristics of given problems. Numerical analyses, experiments, or monitoring results are frequently used to prepare a set of inputs and results to establish the back analysis models. In this study, a back analysis method has been developed to estimate geotechnically hard-to-known parameters such as permeability of tunnel filter, underground water table, long-term rock mass load, size of damaged zone associated with seepage and long-term underground motion. The artificial neural network technique is adopted and the numerical models developed in the firstpart are used to prepare a set of data for learning process. Tunnel behavior especially the displacements of the lining has been exclusively investigated for the back analysis.
최근 들어 터널이 장대화 되면서 시공시 공기와 공사비를 감축할 수 있는 방안이 다양하게 강구되고 있다. 그러나 장대터널의 특성상 터널굴착작업이 종료된 후 콘크리트 라이닝 타설작업이 시작될 경우 공사기간 이 상당히 지연될 수밖에 없다 이에 따라 계룡터널에서는 도로터널에서 반드시 설치되는 콘크리트 라이닝 공 정과 관련하여 소요되는 공기를 단축시키기 위해 터널굴착 발파와 병행하여 라이닝을 시공하는 연구를 수행하였다. 실험은 터널막장 후방에 일정한 거리별로 모두 4 곳의 모형라이닝을 설치하고 발파계측 및 콘크리트 물성 실험을 실시하여 반복적인 발파진동하에서 콘크리트 라이닝에 영향을 미치지 않는 안전이격거리를 도출하였다. 또한 병행시공 현장적용시 환기 및 설비 재배치를 통해 작업환경을 개선하여 시공성을 확보할 수 있는 방안을 간략히 소개하고자 한다.
본 논문은 영동선 동백산역에서 도계역사이를 연결하는 장대터널 (솔안터널)의 시공사례에 대한 연구결과를 제시하였다. 본 터널은 완공시 길이 16.2Km로 국내최장터널이 된다. 본 터널 현장은 단층, 공동 및 함탄층으로 구성된 지질학적으로 복잡한 지역에 위치한다. 2번사갱 굴착을 위하여 사전에 전기비저항탐사 및 지하레이다탐사 등의 지구물리학적인 탐사방법이 단층, 공동 및 함탄층을 사전에 찾아내는데 활용되었으며, 이 방법은 상당한성과가 있었다. 이 물리탐사결과 및 현지 시추자료는 터널 보강설계를 개선하기 위한 자료로 활용되었다. 강관다단 그라우팅 방법은 단층 및 공동이 발달한 지역에서 좋은 보강 및 그라우팅효과를 발휘함이 입증되었다. 함탄층에서는 스웰렉스 록볼트와 공내 몰탈 그라우팅을 병행한 방법이 효과적임이 확인되었다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.