• 제목/요약/키워드: Local Operation Panel

검색결과 20건 처리시간 0.028초

Wire Rope Isolator 마운팅 수동 조작 패널의 진동 저감 (Vibration Reduction for a Local Operation Panel Mounted by Wire Rope Isolator)

  • 김재실;김동일;허종대;황재덕
    • 한국기계가공학회지
    • /
    • 제13권6호
    • /
    • pp.127-133
    • /
    • 2014
  • This paper reviews a finite element model of a wire rope isolator (WRI) via an experimental comparison test. A local operation panel (LOP) mounted on a WRI is modeled using a finite element method. Mode analyses and harmonic analyses are conducted while varying of the thickness of the rope for the WRI. A feasible WRI can be selected considering the reduction of the vibration and the total weight of the LOP system.

Maximum Power Point Tracking under Partial Shading condition

  • Kashif, Muhammad Fayyaz;Park, Yongsoon;Sul, Seung-Ki
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2011년도 추계학술대회
    • /
    • pp.40-41
    • /
    • 2011
  • Partial shading on a Photo Voltaic panel can generate the local maximum power points on the powervoltage curve of the panel. Presence of the local peaks can disturb the efficient operation of maximum power point tracking (MPPT).In this study, the MPPT under partial shading condition is investigated. To circumvent the trappings into the local peaks, the results of the study are enumerated and discussed.

  • PDF

단열재 개선을 통한 PKG-A Water Jet Room 온도저감 연구 (A Study on the Internal Temperature Reduction of PKG-A Water-jet-room by Substituting Heat Insulation Materials)

  • 정영인;최상민
    • 품질경영학회지
    • /
    • 제47권3호
    • /
    • pp.425-435
    • /
    • 2019
  • Purpose: The purpose of this study was to resolve the Naval ship's Local Operation Panel(LOP) malfunction problems which caused by overheating in summer season and dispatching to equatorial regions. Methods: Instead of using dual type heat insulation materials(consist with ceramic wool and glass wool), aerogel heat insulation materials were used for decreasing heat emissions from gas-turbine heat waste steam pipes passing water-jet- room. Experiment and Computational analysis of heat flow were conducted to analyze the internal room temperature changes. Results: The results of this study are as follows; The aerogel heat insulation materials suppress heat emission more efficiently than dual type insulation materials. The cold surface temperature of insulation was far more decreased and internal room, LOP surface temperature also showed significant results too. Conclusion: The substituted heat insulation materials appeared remarkable performance in decreasing room temperature that it could be used for suppressing the LOP overheatings and malfunctions.

154kV급 실증시험용 인텔리전트 변전소 구축 (Construction of 154kV Intelligent Substation for Verification Test)

  • 정영환;김민수;김정배;이학성;최인혁;이동일
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 제37회 하계학술대회 논문집 A
    • /
    • pp.456-457
    • /
    • 2006
  • We have carried out the construction of the 154kV intelligent substation with KEPRI. The Intelligent substation is built in Gochang testing facility of KEPCO and consists of electronic instruments for GIS(gas insulated switchgear), digital control panel, remote monitoring and diagnosis system, and digital relay system. Rogowski coil type CT(RCT) and capacitive voltage divider(CVD) are introduced compared with the instrument transformer of conventional type. Digital control Panel(DCP) replaces the LCP(local control panel) which is drived for mechanical operation. For the monitoring of the condition of GIS and TR, various sensors are used. In this Paper, we mention the synopsis and report the progress state of project.

  • PDF

154kV급 인텔리전트 변전소 구축 (Construction of Intelligent Substation for 154kV Class)

  • 정영환;양대일;김정배;송원표;최인혁;김정호;이동일
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 A
    • /
    • pp.33-35
    • /
    • 2005
  • We perform intelligent substation construction of 154kV class with KEPRI. The intelligent substation is build in Gochang 765kV testing facility and consists of electronic instruments, digital control panel, remote monitoring and diagnosis system and digital relay system. Rogowski coil type CT(RCT) and capacitive voltage divider(CVD) are applicable for instrument transformer of conventional type. Digital control panel(DCP) replaces local panel which is drived by mechanical operation. For monitoring condition of GIS and TR, various sensors are used. In this paper, we report the synopsis and the progress state of project.

  • PDF

154kV급 인텔리전트 변전소 구축 (Construction of Intelligent Substation for 154kV Class)

  • 정영환;양대일;김정배;최인혁;김정호;이동일
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.129-130
    • /
    • 2005
  • We perform intelligent substation construction of 154kV class with KEPRI. The intelligent substation is build in Gochang 765kV testing facility and consists of electronic instruments, digital control panel, remote monitoring and diagnosis system, and digital relay system. Rogowski coil type CT(RCT) and capacitive voltage divider(CVD) are applicable for instrument transformer of conventional type. Digital control panel(DCP) replaces local panel which is drived by mechanical operation. For monitoring rendition of GIS and TR, various sensors are used. In this paper, we report the synopsis and the progress state of project.

  • PDF

154kV 인텔리전트 변전소 구축 (Intelligent Substation Construction of 154kV Class)

  • 김정배;정영환;송원표;최인혁;김정호;이동일;고희석
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 하계학술대회 논문집 A
    • /
    • pp.524-526
    • /
    • 2004
  • We perform intelligent substation construction of 154kV class with KEPRI. The intelligent substation is build in Gochang 765kV testing facility and consists of electronic instruments, digital control panel, remote monitoring and diagnosis system, and digital relay system. Rogowski coil type CT(RCT) and capacitive voltage divider(CVD) are applicable for instrument transformer of conventional type. Digital control panel(UP) replaces local panel which is drived by mechanical operation. For monitoring condition of GIS and TR, various sensors are used. In this paper, we report the synopsis and the progress state of project.

  • PDF

154kV급 실증시험용 인텔리전트 변전소 구축 (Construction of 154kV Intelligent Substation for Verification Test)

  • 정영환;김정배;이학성;최인혁;이동일
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 제38회 하계학술대회
    • /
    • pp.661-662
    • /
    • 2007
  • We have carried out the construction of the 154kV intelligent substation with KEPRI. The intelligent substation is built in Gochang testing facility of KEPCO and consists of electronic instruments for GIS(gas insulated switchgear), digital control panel, remote monitoring and diagnosis system, and digital relay system. Rogowski coil type CT(RCT) and capacitive voltage divider(CVD) are introduced compared with the instrument transformer of conventional type. Digital control panel(DCP) replaces the LCP(local control panel) which is drived for mechanical operation. For the monitoring of the condition of GIS and TR, various sensors are used. In this paper, we mention the synopsis and report the progress state of project.

  • PDF

모터제어센터의 효율적인 운영을 위한 실시간 관리 시스템의 설계 및 구현 (Design and Implementation of Real-Time Management System for Efficient Operation of Motor Control Center)

  • 이태오
    • 한국정보통신학회논문지
    • /
    • 제12권2호
    • /
    • pp.247-253
    • /
    • 2008
  • 본 논문은 모터제어센터의 감시와 제어를 통한 효율적인 운영을 위한 실시간 관리 시스템의 설계 및 구현에 대해서 논한다. 실시간 관리 시스템은 하드웨어(MCC 판넬)와 소프트웨어(관리 프로그램)로 나눌 수 있다. 첫 번째, 하드웨어는 모터가 부착된 부하부분과 제어와 데이터 네트워크를 운용할 수 있는 MCC 구성요소 이다. 두 번째, 관리 프로그램은 통신인터페이스, 환경설정, 데이터의 처리 부분으로 구성되어 있다. 제작 구현된 MCC 판넬의 축소형 모델은 m-PRO, iM-PRO 디바이스, 하이퍼터미널을 이용하여 사전 테스트하였다. 그리고 필드 테스트를 위하여 MCC 판넬은 RS-232C/485를 이용하여 테스트하였고, 관리 시스템의 통신 절차는 제어 명령을 이용하여 메시지를 송 수신하여 확인 하였다. 실험 결과, 구현한 실시간 관리 시스템은 MCC 시스템을 효과적으로 운영하는데 이용할 수 있다.

보건소 구강보건센터운영 활성화 프로그램 개발을 위한 델파이 분석 (Delphi analyses for the activation of program for the public oral health center)

  • 이선미;황윤숙;최부근;류정숙
    • 한국치위생학회지
    • /
    • 제14권2호
    • /
    • pp.269-279
    • /
    • 2014
  • Objectives : The purpose of this study was to investigate the oral health center operation and to activate the program development of public oral health center. Methods : Delphi analyses were utilized by the recruited expert panel from August to September in 2012. Results : The difficulty in operation of the oral health centers is the human resources management. In order to solve the human resources operation, utilization of the local human resources is the best choice of the solution. The next choice was the designation of the oral health expert in Ministry of Health and Welfare. So the expert can activate the public oral health care system for the disabled and the underprivileged classes in the long term. Conclusions : In order to activate the oral health centers, Ministry of Health and Welfare should promote the public health center function connected with the cooperation of the Association of dental hygienists.