• Title/Summary/Keyword: Local Operation Panel

Search Result 20, Processing Time 0.038 seconds

Vibration Reduction for a Local Operation Panel Mounted by Wire Rope Isolator (Wire Rope Isolator 마운팅 수동 조작 패널의 진동 저감)

  • Kim, Chae-Sil;Kim, Dong-Il;Heo, Jong-Dae;Hwang, Jae-Deok
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.13 no.6
    • /
    • pp.127-133
    • /
    • 2014
  • This paper reviews a finite element model of a wire rope isolator (WRI) via an experimental comparison test. A local operation panel (LOP) mounted on a WRI is modeled using a finite element method. Mode analyses and harmonic analyses are conducted while varying of the thickness of the rope for the WRI. A feasible WRI can be selected considering the reduction of the vibration and the total weight of the LOP system.

Maximum Power Point Tracking under Partial Shading condition

  • Kashif, Muhammad Fayyaz;Park, Yongsoon;Sul, Seung-Ki
    • Proceedings of the KIPE Conference
    • /
    • 2011.11a
    • /
    • pp.40-41
    • /
    • 2011
  • Partial shading on a Photo Voltaic panel can generate the local maximum power points on the powervoltage curve of the panel. Presence of the local peaks can disturb the efficient operation of maximum power point tracking (MPPT).In this study, the MPPT under partial shading condition is investigated. To circumvent the trappings into the local peaks, the results of the study are enumerated and discussed.

  • PDF

A Study on the Internal Temperature Reduction of PKG-A Water-jet-room by Substituting Heat Insulation Materials (단열재 개선을 통한 PKG-A Water Jet Room 온도저감 연구)

  • Jung, Young In;Choi, Sang Min
    • Journal of Korean Society for Quality Management
    • /
    • v.47 no.3
    • /
    • pp.425-435
    • /
    • 2019
  • Purpose: The purpose of this study was to resolve the Naval ship's Local Operation Panel(LOP) malfunction problems which caused by overheating in summer season and dispatching to equatorial regions. Methods: Instead of using dual type heat insulation materials(consist with ceramic wool and glass wool), aerogel heat insulation materials were used for decreasing heat emissions from gas-turbine heat waste steam pipes passing water-jet- room. Experiment and Computational analysis of heat flow were conducted to analyze the internal room temperature changes. Results: The results of this study are as follows; The aerogel heat insulation materials suppress heat emission more efficiently than dual type insulation materials. The cold surface temperature of insulation was far more decreased and internal room, LOP surface temperature also showed significant results too. Conclusion: The substituted heat insulation materials appeared remarkable performance in decreasing room temperature that it could be used for suppressing the LOP overheatings and malfunctions.

Construction of 154kV Intelligent Substation for Verification Test (154kV급 실증시험용 인텔리전트 변전소 구축)

  • Chung, Y.H.;Kim, M.S.;Kim, J.B.;Lee, H.S.;Choi, I.H.;Lee, D.I.
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.456-457
    • /
    • 2006
  • We have carried out the construction of the 154kV intelligent substation with KEPRI. The Intelligent substation is built in Gochang testing facility of KEPCO and consists of electronic instruments for GIS(gas insulated switchgear), digital control panel, remote monitoring and diagnosis system, and digital relay system. Rogowski coil type CT(RCT) and capacitive voltage divider(CVD) are introduced compared with the instrument transformer of conventional type. Digital control Panel(DCP) replaces the LCP(local control panel) which is drived for mechanical operation. For the monitoring of the condition of GIS and TR, various sensors are used. In this Paper, we mention the synopsis and report the progress state of project.

  • PDF

Construction of Intelligent Substation for 154kV Class (154kV급 인텔리전트 변전소 구축)

  • Chung, Y.H.;Yang, D.I.;Kim, J.B.;Song, W.P.;Choi, I.H.;Kim, J.H.;Lee, D.I.
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.33-35
    • /
    • 2005
  • We perform intelligent substation construction of 154kV class with KEPRI. The intelligent substation is build in Gochang 765kV testing facility and consists of electronic instruments, digital control panel, remote monitoring and diagnosis system and digital relay system. Rogowski coil type CT(RCT) and capacitive voltage divider(CVD) are applicable for instrument transformer of conventional type. Digital control panel(DCP) replaces local panel which is drived by mechanical operation. For monitoring condition of GIS and TR, various sensors are used. In this paper, we report the synopsis and the progress state of project.

  • PDF

Construction of Intelligent Substation for 154kV Class (154kV급 인텔리전트 변전소 구축)

  • Chung, Y.H.;Yang, D.I.;Kim, J.B.;Choi, I.H.;Kim, J.H.;Lee, D.I.
    • Proceedings of the KIEE Conference
    • /
    • 2005.11b
    • /
    • pp.129-130
    • /
    • 2005
  • We perform intelligent substation construction of 154kV class with KEPRI. The intelligent substation is build in Gochang 765kV testing facility and consists of electronic instruments, digital control panel, remote monitoring and diagnosis system, and digital relay system. Rogowski coil type CT(RCT) and capacitive voltage divider(CVD) are applicable for instrument transformer of conventional type. Digital control panel(DCP) replaces local panel which is drived by mechanical operation. For monitoring rendition of GIS and TR, various sensors are used. In this paper, we report the synopsis and the progress state of project.

  • PDF

Intelligent Substation Construction of 154kV Class (154kV 인텔리전트 변전소 구축)

  • Kim J B.;Chung Y. H.;Song W. P.;Choi I. H.;Kim J. H.;Lee D. I.;Koh H. S.
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.524-526
    • /
    • 2004
  • We perform intelligent substation construction of 154kV class with KEPRI. The intelligent substation is build in Gochang 765kV testing facility and consists of electronic instruments, digital control panel, remote monitoring and diagnosis system, and digital relay system. Rogowski coil type CT(RCT) and capacitive voltage divider(CVD) are applicable for instrument transformer of conventional type. Digital control panel(UP) replaces local panel which is drived by mechanical operation. For monitoring condition of GIS and TR, various sensors are used. In this paper, we report the synopsis and the progress state of project.

  • PDF

Construction of 154kV Intelligent Substation for Verification Test (154kV급 실증시험용 인텔리전트 변전소 구축)

  • Chung, Y.H.;Kim, J.B.;Lee, H.S.;Choi, I.H.;Lee, D.I
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.661-662
    • /
    • 2007
  • We have carried out the construction of the 154kV intelligent substation with KEPRI. The intelligent substation is built in Gochang testing facility of KEPCO and consists of electronic instruments for GIS(gas insulated switchgear), digital control panel, remote monitoring and diagnosis system, and digital relay system. Rogowski coil type CT(RCT) and capacitive voltage divider(CVD) are introduced compared with the instrument transformer of conventional type. Digital control panel(DCP) replaces the LCP(local control panel) which is drived for mechanical operation. For the monitoring of the condition of GIS and TR, various sensors are used. In this paper, we mention the synopsis and report the progress state of project.

  • PDF

Design and Implementation of Real-Time Management System for Efficient Operation of Motor Control Center (모터제어센터의 효율적인 운영을 위한 실시간 관리 시스템의 설계 및 구현)

  • Lee, Tae-Oh
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.12 no.2
    • /
    • pp.247-253
    • /
    • 2008
  • In this paper, we describes the design and implementation of real-time management system for efficient operation via monitoring and control of MCC(Motor Control Center). The real-tine management system can be divided hardware(MCC panel) and software(management program). First, hardware is divided into load attaching motor and MCC components for working together control and data network. Second, software(management system) are consisted of communication interface, environment setting, data processing modules. The produced and implemented reduction model of MCC panel is pretested using m-PRO, iM-PRO devices, and HyperTerminal. For field test, MCC panel is tested by RS-232C/485, communication procedure in management system is certified by transmitting and receiving message using control command. By the experimental results, the implemented real-time management system can be used to operate MCC system.

Delphi analyses for the activation of program for the public oral health center (보건소 구강보건센터운영 활성화 프로그램 개발을 위한 델파이 분석)

  • Lee, Sun-Mi;Hwang, Yoon-Sook;Choi, Boo-Keun;Yoo, Jung-Sook
    • Journal of Korean society of Dental Hygiene
    • /
    • v.14 no.2
    • /
    • pp.269-279
    • /
    • 2014
  • Objectives : The purpose of this study was to investigate the oral health center operation and to activate the program development of public oral health center. Methods : Delphi analyses were utilized by the recruited expert panel from August to September in 2012. Results : The difficulty in operation of the oral health centers is the human resources management. In order to solve the human resources operation, utilization of the local human resources is the best choice of the solution. The next choice was the designation of the oral health expert in Ministry of Health and Welfare. So the expert can activate the public oral health care system for the disabled and the underprivileged classes in the long term. Conclusions : In order to activate the oral health centers, Ministry of Health and Welfare should promote the public health center function connected with the cooperation of the Association of dental hygienists.