• Title/Summary/Keyword: Load parallel

Search Result 935, Processing Time 0.027 seconds

Parallel Running System of the Loaded Diesel Generator to Infinite Bus (부하를 분담하고 있는 디젤발전기의 무한대 모선과의 병렬운전 시스템)

  • 천행춘
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.28 no.6
    • /
    • pp.1017-1025
    • /
    • 2004
  • Generally generator is connected to the bus with no load. After the connection to the bus. the frequency of generator system with no load has to be increased for preventing the reverse power. But in a few case of parallel running with infinite bus system, we have to synchronize the loaded generator to the infinite bus. The frequency of generator system with load has to be lowered for prevention of load shift to the bus system. The blackout of infinite bus decreases the parallel running generator's frequency because of load increasing. In this paper we propose a method that the generator with load maintains the frequency constantly after the blackout of infinite bus. With the constant speed control and load control method of parallel running system to the infinite bus we apply the method to the industrial generating system.

The Parallel Operation Control of Static UPSs (정지형 UPS의 병렬운전 제어)

  • Min, Byeong-Gwon;Won, Chung-Yun
    • The Transactions of the Korean Institute of Electrical Engineers B
    • /
    • v.48 no.7
    • /
    • pp.363-368
    • /
    • 1999
  • The parallel operation system of multiple uninterruptible power supplies(UPSs) is used to increase power capacity of the system or to secure higher reliability at critical loads. In the parallel operation of the two UPSs, the load-sharing control to maintain the current balance between them is a key technique. Because a UPS has low output impedance and quick response characteristics, in case of an unbalanced load inverter output current changes very rapidly and thereby can instantaneously reach an overload condition. In this study, high precise load-sharing controller is proposed and implemented for the parallel operation system of two UPSs with low impedance characteristics and this controller controls the frequency and the voltage to minimize the active power component and the reactive power component which are gotten from the current difference between two UPSs. And then a good performance of the proposed method is verified by experiments in the parallel operation system with two 40KVA UPSs.

  • PDF

Parallelization of A Load balancing Algorithm for Parallel Computations (병렬계산을 위한 부하분산 알고리즘의 병렬화)

  • In-Jae Hwang
    • Journal of the Institute of Convergence Signal Processing
    • /
    • v.5 no.3
    • /
    • pp.236-242
    • /
    • 2004
  • In this paper, we propose an approach to parallelize a load balancing algorithm that was shown to be very effective in distributing workload for parallel computations. Load balancing algorithms are required in executing parallel program efficiently As a parallel computation model, we used dynamically growing tree structure that can be found in many application problems. The load balancing algorithm tries to balance the workload among processors while keeping the communication cost under certain limit. We show how the load balancing algorithm is effectively parallelized on mesh and hypercube interconnection networks, and analyzed the time complexity for each case to show that parallel algorithm actually reduced the various overhead.

  • PDF

A Study on the Parallel Line Pivoted Pad Thrust Bearing (평행선 지지식 추력베어링에 관한 연구)

  • 이경우;김종수;제양규
    • Tribology and Lubricants
    • /
    • v.15 no.1
    • /
    • pp.24-28
    • /
    • 1999
  • This paper describes a new pivoting technique to improve bearing performance in pivoted pad thrust bearings. This new technique adjusts the pivot line in a line pivoted pad thrust bearing to be parallel to the trailing edge of a sector shaped pad. Bearing performance factors such as load carrying capacity, frictional torque and flow rate are numerically investigated for conventional point-pivoted and line-pivoted pads and for the new parallel-line pivoting technique. It is shown that the load carving capacity can be maximized with the new technique.

Optimal Economic Load Dispatch using Parallel Genetic Algorithms in Large Scale Power Systems (병렬유전알고리즘을 응용한 대규모 전력계통의 최적 부하배분)

  • Kim, Tae-Kyun;Kim, Kyu-Ho;Yu, Seok-Ku
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.48 no.4
    • /
    • pp.388-394
    • /
    • 1999
  • This paper is concerned with an application of Parallel Genetic Algorithms(PGA) to optimal econmic load dispatch(ELD) in power systems. The ELD problem is to minimize the total generation fuel cost of power outputs for all generating units while satisfying load balancing constraints. Genetic Algorithms(GA) is a good candidate for effective parallelization because of their inherent principle of evolving in parallel a population of individuals. Each individual of a population evaluates the fitness function without data exchanges between individuals. In application of the parallel processing to GA, it is possible to use Single Instruction stream, Multiple Data stream(SIMD), a kind of parallel system. The architecture of SIMD system need not data communications between processors assigned. The proposed ELD problem with C code is implemented by SIMSCRIPT language for parallel processing which is a powerfrul, free-from and versatile computer simulation programming language. The proposed algorithms has been tested for 38 units system and has been compared with Sequential Quadratic programming(SQP).

  • PDF

Master-Slave type DC-DC Converters Parallel Operation by ZCT method (ZCT방식의 master-slave형 DC-DC컨버터 병렬운전)

  • 박상은;송승찬;진정태;이기홍;성세진
    • Proceedings of the KIPE Conference
    • /
    • 1999.07a
    • /
    • pp.655-658
    • /
    • 1999
  • In this paper, Parallel operation of two DC-DC converters which we have ever done before need two CTs to do load current sharing. However, we have proposed a new method called ZCT method that can share load current with only a CT as doing parallel operation two converters with same converter capacity. To confirm parallel performance by a proposed DC-DC converter parallel operation method, we have done computer simulation and experiment. It is certain that we have showed to achieve two converters current sharing performance efficiently through simulation and experiment at result.

  • PDF

A Study of Voltage Control for Lower Side Parallel Transformer (병렬운전 변압기 전압제어 및 저압축 모선보호방식연구)

  • Yun, Gi-Seob;Baek, Seung-Do;Choi, Hyuck-Jong
    • Proceedings of the KIEE Conference
    • /
    • 2001.07a
    • /
    • pp.233-236
    • /
    • 2001
  • Parallel operation scheme to several transformers is adopted because of the load increase, economic problem, or load shedding. For the transformer's parallel operation, loads proportional to each transformer's capacity must be allotted, and circulation currents must be limited as much as without causing any problem in a real operation. But, both transformers in parallel operation can be tripped when either faults at lower voltage side of a transformer or faults in a bus occurs. Therefore, parallel operation scheme to distribution transformers in Korea is not adopted in a normal state but only when loaded or load-shedded. These are due to the insufficiency of the construction in communication network and AVR scheme. Besides that, those are because bus bar protection scheme to lower voltage side of a transformer is not applied. In spite of enormous initial investment costs, advanced countries take so much account of power system reliability and stable supply that they adopt the parallel operation scheme in a normal state. One of the problems in parallel operation is the overheat of transformers due to the excessive circulation currents. This paper presents the scheme that controls voltages between both transformers using circulation currents that occurs in parallel operation.

  • PDF

A Parallel Loop Scheduling Algorithm on Multiprocessor System Environments (다중프로세서 시스템 환경에서 병렬 루프 스케쥴링 알고리즘)

  • 이영규;박두순
    • Journal of Korea Multimedia Society
    • /
    • v.3 no.3
    • /
    • pp.309-319
    • /
    • 2000
  • The purpose of a parallel scheduling under a multiprocessor environment is to carry out the scheduling with the minimum synchronization overhead, and to perform load balance for a parallel application program. The processors calculate the chunk of iteration and are allocated to carry out the parallel iteration. At this time, it frequently accesses mutually exclusive global memory so that there are a lot of scheduling overhead and bottleneck imposed. And also, when the distribution of the parallel iteration in the allocated chunk to the processor is different, the different execution time of each chunk causes the load imbalance and badly affects the capability of the all scheduling. In the paper. we investigate the problems on the conventional algorithms in order to achieve the minimum scheduling overhead and load balance. we then present a new parallel loop scheduling algorithm, considering the locality of the data and processor affinity.

  • PDF

A Master and Slave Control Strategy for Parallel Operation of Three-Phase UPS Systems with Different Ratings (다른 정격용량을 가진 3상 UPS 시스템의 병렬운전을 위한 주종제어 기법)

  • 이우철;현동석
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.9 no.4
    • /
    • pp.341-349
    • /
    • 2004
  • A parallel operation of Uninterruptible Power Supply(UPS) systems is used to increase power capacity of the system or to secure higher reliability at critical loads. In the conventional parallel operation, the load-sharing control to maintain the current balance is the most important, since the load-sharing is very sensitive to discord between components of each module, amplitude/phase difference, line impedance, output LC filter, and so on. To solve these problems various control algorithms are researching. However, these methods cannot apply to the different ratings of UPS. In the case, master and slave control algorithm for parallel operation is adequate. However, if the UPS ratings are different, the value of passive filters L, C is different, and it affects the sharing of current. This paper presents general problems of conventional parallel operation systems, and control strategy for parallel operation with different ratings. The validity of the proposed control strategy is investigated through simulation and experiment in the parallel operation system with two 3-phase UPS systems.

Optimal Redundent Units and Inspection Interval in Load-Sharing Parallel System (부하분담형 병렬 시스템에서의 최적 중복부품수와 최적 검사주기)

  • Yun, Won-Young;Kim, Gui-Rae
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.23 no.4
    • /
    • pp.817-824
    • /
    • 1997
  • This paper is concerned with a parallel system that sustains a time-independent load and consists of n components with exponential lifetimes. It is assumed that the total load is shared by the functioning components and the failures of components induce higher failure rates in the surviving components according to the relationship between the load and the failure rates. The power rule model among several load-failure rate relationships is considered. Firstly, the reliability function is obtained. Secondly, the optimization problem in this load-sharing parallel system is considered. The optimal redundant units and inspection interval are obtained. Some numerical examples are studied.

  • PDF