This paper presents a fast calculation method for evaluating of voltage stability margin (MW) using the line flow equation in polar form. Here, Line flow equations $(P_{ij},\;Q_{ij}$ are comprised of state variable, $V_i,\;{\Delta}_i,\;V_j$ and ${Delta}_j$, and line parameter, r and x. using the feature of polar coordinate, these becomes one equation with two variables, $V_j,;V_j$. Moreover, if bus j is slack or generator bus, which is specified voltage magnitude in load flow calculation, it becomes one equation with one variable $V_ i $ that is, may be formulated with the second-order equation for $V^2_i$. Therefore, multiple load flow solutions may be obtained with simple computation. The obtained load flow multiple solutions are used for evaluating of voltage stability through sensitivity analysis or its closeness. Also, the method is proposed to calculate for voltage stability margin considering shunt capacitor, which is important element for evaluating of voltage stability. The proposed method was validated to sample systems.
This paper presents a method to determine parameters of BTB (back-to-back) converters in terms of the enhancement of interface flow margins. Interface flow margin is by definition a measure of how much active power can be transferred from the external areas to the study area with the fixed load demand, and it is mainly constrained by system voltage stability. BTB converters are controllable equipments with the active power flow through them, and its DC link in fact can divide the AC systems at the location and hence can reduce the fault current level. This paper first cals margin sensitivities at the nose point of F-V curves and formulates an optimization problem to update the BTB parameters to improve the margins. This procedure is repeated performed until the required margin enhancement is achieved.
The Transactions of The Korean Institute of Electrical Engineers
/
v.59
no.6
/
pp.1011-1016
/
2010
It is an important issue to electric power system operations that it can reliably supply large-capacity power to consumption area as due to increasing power demand growth. For this purpose, The FACTS equipment based on Power IT technology with the existing mechanical compensators has been applied to power system. Therefore we suggest on this paper that a plan for coordination control of multiple power compensation equipment in order to increase the utilization of each facility and secure operation margin capacity. As the result of simulation, it is possible to cope actively with a suddenly changed power system. This helps greatly for the voltage stability and supply reliability in a suddenly changed power system.
0.4mm Resign Rule의 Super Low Power Dissipation, Low Voltage. Operation-5- Full CMOS SRAM Cell을 개발하였다. Retrograde Well과 PSL(Poly Spacer LOCOS) Isolation 공정을 사용하여 1.76mm의 n+/p+ Isolation을 구현하였으며 Ti/TiN Local Interconnection을 사용하여 Polycide수준의 Rs와 작은 Contact저항을 확보하였다. p-well내의 Boron이 Field oxide에 침적되어 n+/n-well Isolation이 취약해짐을 Simulation을 통해 확인할 수 있었으며, 기생 Lateral NPN Bipolar Transistor의 Latch Up 특성이 취약해 지는 n+/n-wellslze는 0.57mm이고, 기생 Vertical PNP Bipolar Transistor는 p+/p-well size 0.52mm까지 안정적인 Current Gain을 유지함을 알 수 있었다. Ti/TiN Local Interconnection의 Rs를 Polycide 수준으로 낮추는 것은 TiN deco시 Power를 증가시키고 Pressure를 감소시킴으로써 실현할 수 있었다. Static Noise Margin분석을 통해 Vcc 0.6V에서도 Cell의 동작 Margin이 있음을 확인할 수 있었으며, Load Device의 큰 전류로 Soft Error를 개선할수 있었다. 본 공정으로 제조한 1M Full CMOS SRAM에서 Low Vcc margin 1.0V, Stand-by current 1mA이하(Vcc=3.7V, 85℃기준) 를 얻을 수 있었다.
The Transactions of the Korean Institute of Electrical Engineers A
/
v.53
no.3
/
pp.129-134
/
2004
The Available Transfer Capability (ATC) is defined as the measure of the transfer capability remaining in the physical transmission network for further commercial activity above already committed uses. The ATC determination s related with Total Transfer Capability (TTC) and two reliability margins-Transmission Reliability Capability (TRM) and Capacity Benefit Margin(CBM) The TRM is the component of ATC that accounts for uncertainties and safety margins. Also the TRM is the amount of transmission capability necessary to ensure that the interconnected network is secure under a reasonable range of uncertainties in system conditions. The CBM is the translation of generator capacity reserve margin determined by the Load Serving Entities. This paper describes a method for determining the TTC and TRM to calculate the ATC in the Bulk power system (HL II). TTC and TRM are calculated using Power Transfer Distribution Factor (PTDF). PTDF is implemented to find generation quantifies without violating system security and to identify the most limiting facilities in determining the network’s TTC. Reactive power is also considered to more accurate TTC calculation. TRM is calculated by alternative cases. CBM is calculated by LOLE. This paper compares ATC and TRM using suggested PTDF with using CPF. The method is illustrated using the IEEE 24 bus RTS (MRTS) in case study.
The Transactions of the Korean Institute of Electrical Engineers P
/
v.65
no.4
/
pp.255-261
/
2016
Korean Power System are operating a load shedding system to prevent voltage instability phenomenon caused by severe line contingencies. In order to apply the load shedding scheme should be selected a location, amount, delay time. Current load shedding system is load shedding amount that has been calculated in the steady-state analysis to load shed the total amount in first level, load shedding amount calculated in advance, it is possible to perform an unnecessary load shedding. In this paper, set a multi-level load shedding control strategy step-by-step selection of load shedding amount for the prevention of excessive load shedding. In addition, through a voltage resilience analysis of the power system by applying motor load ratio and sensitivity parameter to selection the multi level load shedding ratio and delay time. For this reason, to take advantage of the limit data of interchange power, by utilizing interface power flow data to set a multi-level load shedding control strategy for the stabilization of the Korean Power System.
Kang, Chang Soon;Nguyen, Tien Dung;Kim, Junsu;Cigno, Renato Lo
KSII Transactions on Internet and Information Systems (TIIS)
/
v.7
no.11
/
pp.2597-2615
/
2013
This paper proposes a dynamic downlink load control scheme that jointly employs dynamic load threshold management and virtual coverage management schemes to reduce the degree of performance degradation due to traffic overload in two-tier femtocell networks. With the proposed scheme, the downlink load in a serving macrocell is controlled with a load threshold which is adjusted dynamically depending on the varying downlink load conditions of neighboring macrocells. In addition, traffic overloading is alleviated by virtually adjusting the coverage of the overloaded serving macrocell, based on the adjusted load threshold of the serving macrocell. Simulation results show that the proposed scheme improves the performance of two-tier femtocell networks in terms of the outage probability and sum throughput. This improvement is significantly increased with appropriate values of load thresholds and with an intermediate-level adjustment of the virtual coverage area (i.e., handover hysteresis margin: HOM). Furthermore, the proposed scheme outperforms both a previously proposed load control scheme with a static load threshold and the LTE system without a HOM adjustment.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.24
no.12
/
pp.177-183
/
2010
Overhead transmission lines in domestic area have been built by several different design standards of dip and ground clearance. This paper describes an experimental study for evaluating load capacity and dip margin in overhead transmission lines. Such design standards for selection of overhead transmission conductors, dip and ground clearance, as well as electrical equipment technical standard are discussed. Based on daily load and weather data, several characteristics such as line utilization factor, load factor, conductor temperature and dip, etc. are analyzed, and compared with the specified levels of design standards. As a result, it is verified that DLR method can be a clue of the solving of the problem, for occurring in old transmission conductors which may be rarely operating below standards.
Proceedings of the Korea Concrete Institute Conference
/
2003.11a
/
pp.161-164
/
2003
This experimental investigation was conducted to examine the seismic performance of reinforced concrete bridge columns. The columns were subjected to a constant axial load and a cyclic horizontal load-inducing reversed bending moment. The variables studied in this research are the volumetric ratio of transverse reinforcement ($P_s$ =0.96, 1.44 per cent) and axial load ratio (0.05, 0.1, 0.2 P/$P_o$). Test results show that bridge columns with 50 per cent higher amounts of transverse reinforcement than that required by seismic provisions of ACI 318-02 showed ductile behaviour. For bridge columns with axial load ratio(P/$P_o$) less than 0.2, the ratio of $M_{max}$ over $M_{aci}$, nominal moment capacity predicted by ACI 318-02 provisions, is consistently greater than 1 with approximately a 20 percent margin of safty.
Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
/
2008.05a
/
pp.66-69
/
2008
In this paper, The author present a load current feed-forward compensator by method that improve voltage controller of Step-down Chopper to get stable output voltage to sudden change of load current. To confirm the characteristicsof a presented load current feed -forward compensator compared each transfer function of whole system that load current feed-forward compensator is added with transfer function of whole system that existent voltage controller is included using Mason gains formula in Root locus and Bode diagram. As a result the pole of system is improved, extreme point of the wave and system improves, and size of peak value and phase margin of break frequency in resonance frequency confirmed that is good. Therefore, presented control technique could confirm that reduce influence by perturbation and improves stationary state and dynamic characteristics in output of Step-down Chopper.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.