• 제목/요약/키워드: Load duration distribution

검색결과 57건 처리시간 0.019초

Load Duration Curve를 이용한 분산전원과 배전계통의 신뢰도 산출 (Reliability Evaluation of Distributed Generation and Distribution System Using Load Duration Curve)

  • 배인수;김진오
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제54권11호
    • /
    • pp.518-524
    • /
    • 2005
  • This paper presents an analytical method for the reliability evaluation of distribution system, including the distributed generations. Unlike the large sized generations of transmission system, the distributed generations have complexities in analyzing and determining the operation. In the process of evaluate reliability, it can be shown that the analytical method is simpler than the Monte-Carlo simulation and the method using Load Duration Curve model is more accurate than that using peak load model. The modeling of distributed generation to analysis distribution system reliability using LDC is proposed in this Paper, and is compared with the MCS method as a result of case studies.

각 부하지점별 유효부하지속곡선 작성법에 관한 연구 (A Study on Construction of the CMELDC at Load Points)

  • 김홍식;문승필;최재석
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제49권4호
    • /
    • pp.195-198
    • /
    • 2000
  • This paper illustrates a new method for constructing composite power system effective load duration curve(CMELDC) at load points. The main concept of proposed method is that the CMELDC can be obtain from convolution integral processing of the outage probabilistic distribution function of not supplied power and the load duration curve given at each load point. The effective load duration curve (ELDC) at HLI plays an important part in probabilistic production simulation, reliability evaluation, outage cost assessment and power supply margins assesment for power system planning and operation. And also, the CMELDC at HLII will extend the application areas of outage cost assessment and reliability evaluation at each load point. The CMELDC at load points using the Monte Carlo method and a DC load flow constrained LP have already been developed by authors. The effective load concept at HLII, however, has not been introduced sufficiently in last paper although the concept is important. In this paper, the main concept of the effective load at HLII which is proposed in this study is defined in details as the summation of the original load and the probabilistic loads caused by the forced outage of generators and transmission lines at this load point. The outage capacity probabilistic distribution function at HLII can be obtained by combining the not supplied powers and the probabilities of the not supplied powers at this load point. It si also expected that the proposed CMELDC can be applied usefully to research areas such as reliability evaluation, probabilistic production cost simulation and analytical outage cost assessment, etc. at HLII in future. The characteristics and effectiveness of this methodology are illustrated by case study of IEEE-RTS.

  • PDF

100kVA 이하급 배전용 변압기 일부하 패턴의 2-Step 모델링 (2-Step Modeling for Daily Load Curve of Up to and Including 100kVA Distribution Transformer)

  • 이영석;김재철;윤상윤
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.371-373
    • /
    • 2001
  • In this paper, we present 2-step load cycle for daily load curve of up to and including 100kVA distribution transformer in domestic. Daily load patterns are classified by two methods dependent upon possession information. In case we possess daily load profiles make use of K-mean algorithm and in case we have not daily load profiles, make use of customer information of KEPCO. As the parameters of the load pattern classification, we use are daily load profiles and customer information of each distribution transformers. Data management system is used for NT oracle. We can present peak load magnitude, initial load magnitude and peak load duration for daily load patterns by 2-step load cycle for daily load curve of up to and including 100kVA distribution transformer in domestic. We think that this paper contributes to enhancing the distribution transformer overload criterion.

  • PDF

수용가의 신뢰도 평가를 위한 분산전원 모델링 (Modeling of Distributed Generation to Calculate Reliability of Customers)

  • 조종만;배인수;심헌;김진오
    • 조명전기설비학회논문지
    • /
    • 제19권8호
    • /
    • pp.70-76
    • /
    • 2005
  • 본 논문은 분산전원이 연계된 배전계통의 신뢰도를 평가할 수 있는 해석적 기법과 그에 맞는 분산전원의 모델을 제시한다. 분산전원은 송전계통에 연계된 대규모 발전기와는 다른 운영방식을 가지기 때문에 기존의 기법과는 다른 해석기법과 모델을 필요로 한다. 제시되는 신뢰도 해석기법은 Monte-Carlo 시뮬레이션에 비해 간단하면서도 피크부하를 사용하는 해석기법에 비해 정확하기 위해 Load Duration Curve를 사용하였고, 최종적으로는 사례연구를 통해 제시된 기법의 정확성을 입증하였다.

유역모형을 이용한 비점배출계수 적용성 평가 (Evaluation of Applicability for Nonpoint Discharge Coefficient using Watershed Model)

  • 이은정;김태근
    • 환경영향평가
    • /
    • 제21권3호
    • /
    • pp.339-352
    • /
    • 2012
  • Total maximum daily load have been implemented and indicated that nonpoint discharge coeffients in flow duration curve were 0.50 of Normal flow duration ($Q_{185}$) and 0.15 of low flow duration($Q_{275}$). By using SWAT, nonpoint discharge coefficients are studied with the conditions of the instream flow and the rainfall in two study areas. The nonpoint discharge coefficient average of BOD and TP for normal flows duration in 3 years are 0.32~0.36 and 0.28~0.31. For the low flow duration, the nonpoint discharge coefficient avergae of BOD and TP were 0.10~0.12 and 0.10~0.11. These are lower than the coefficients of total maximum load regulation. There are big differences between one of regulation and one of SWAT for the normal flow duration. With the consideration of rainfall condition, the nonpoint discharge coefficient of flood flow duration are influenced on the amount of rainfalls. However, the nonpoint discharge coefficients of normal flow duration and low flow duration are not effected by the rainfall condition. Since the spatial distribution and geomorphological characteristics could be considered with SWAT, the estimation of nonpoint discharge coefficient in watershed model is better method than the use of the recommended number in the regulation.

Study on the Vibration Characteristics of Yaw Gear System for Large-Capacity Offshore Wind Turbine

  • HyoungWoo Lee;SeoWon Jang;Seok-Hwan Ahn
    • 한국해양공학회지
    • /
    • 제37권4호
    • /
    • pp.164-171
    • /
    • 2023
  • Vibration and noise must be considered to maximize the efficiency of a yaw system and reduce the fatigue load acting on a wind turbine. This study investigated a method for analyzing yaw-system vibration based on the change in the load-duration distribution (LDD). A substructure synthesis method was combined with a planetary gear train rotational vibration model and finite element models of the housing and carriers. For the vibration excitation sources, the mass imbalance, gear mesh frequency, and bearing defect frequency were considered, and a critical speed analysis was performed. The analysis results showed that the critical speed did not occur within the operating speed range, but a defect occurred in the bearing of the first-stage planetary gear system. It was found that the bearing stiffness and first natural frequency increased with the LDD load. In addition, no vibration occurred in the operating speed range under any of the LDD loads. Because the rolling bearing stiffness changed with the LDD, it was necessary to consider the LDD when analyzing the wind turbine vibration.

수질오염총량관리 목표수질 초과지역에 대한 유황별 초과기여도 분석 (Contributions to the Impaired Water Bodies by Hydrologic Conditions for the Management of Total Maximum Daily Loads)

  • 박준대;오승영
    • 한국물환경학회지
    • /
    • 제28권4호
    • /
    • pp.574-581
    • /
    • 2012
  • It is important to analyze the status of water quality with relation to the stream flow to attain water quality goal more effectively in the unit watersheds for the management of Total Maximum Daily Loads (TMDLs). This study developed a flow duration-water quality distribution graph to figure out water quality appearances on the flow variation and analyzed contributions of water quality observations to the impaired water bodies quantitatively by hydrologic conditions. Factors relating to water quality variation can be analyzed more precisely and assessed on the base of quantified contributions. It is considered that this approach could be utilized to establish a more effective plan for the water quality improvement including the prioritization of pollution reduction options.

Monte Carlo Simulation을 이용한 각 부하지점별 확률론적 발전비산정 (A Nodal Probabilistic Production Cost Evaluation at each Load Point using Monte Carlo Simulation Methods)

  • 문승필;김홍식;최형림;최재석;노대석
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 하계학술대회 논문집 A
    • /
    • pp.530-532
    • /
    • 2001
  • This paper illustrates a method for evaluating nodal probabilistic production cost using the CMELDC. A new method for constructing CMELDC(the equivalent load duration curves of composite power system) was developed by authors. The CMELDC can be obtained by convolution integral processing between the probability distribution functions of the fictitious generators outage capacity and the load duration curves at each load point. Monte Carlo Methods are applied for the construction of CMELDC on this study. And IEEE-RTS 24 buses model is used as our case study with satisfactory results.

  • PDF

오염부하지속곡선을 이용한 팔당호 수질항목별 중점관리 시점 선정 (Determination of Important Parameter Control Term for Paldang Lake Water Quality Management using Load Duration Curves)

  • 김동우;장미정;박지형;한인섭
    • 한국물환경학회지
    • /
    • 제29권6호
    • /
    • pp.762-776
    • /
    • 2013
  • Load duration curve was applied to determine important water quality parameter control term for improvement of Paldang lake water quality. Load duration curve was analyzed with long term data from 1985 to 2012 including water quality, flow rate and climate state of Paldang water environment. From the result of flow rate patterns of paldang lake, differences between high and low flow rate of each year showed tendency of increase because rainfall characteristics of paldang lake watershed were changed by climate exchange. Both of land use state of upper Paldang lake watershed and number of limit excess from load duration curve indicated that seasonal action related with land use such as agricultural fertilizer distribution in upper watershed affected Paldang lake water quality. So focused BOD (biological oxygen demand) management during spring season from march to June is required to control organic materials in Paldand lake. The main affecting factor of TOC (total organic carbon) increase in Paldang lake was initial rainfall after march. T-N (total nitrogen) kept increasing during research period, so enhancement of T-N standard is needed to T-N control. Initial rainfall and increase of temperature during spring season from March to June showed a positive correlation with TP (total phosphorus) and Chl-a, respectively.

각 부하지점별 확률론적 발전비용 산정을 위한 수치해석적 방법의 개발 (Development of a New Numerical Analysis Method for Nodal Probabilistic Production Cost Simulation)

  • 김홍식;문승필;최재석;노대석;차준민
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제50권9호
    • /
    • pp.431-439
    • /
    • 2001
  • This Paper illustrates a new numerical analysis method using a nodal effective load model for nodal probabilistic production cost simulation of the load point in a composite power system. The new effective load model includes capacities and uncertainties of generators as well as transmission lines. The CMELDC(composite power system effective load duration curve) based on the new effective load model at HLll(Hierarchical Level H) has been developed also. The CMELDC can be obtained from convolution integral processing of the outage capacity probabilistic distribution function of the fictitious generator and the original load duration curve given at the load point. It is expected that the new model for the CMELDC proposed in this study will provide some solutions to many problems based on nodal and decentralized operation and control of an electric power systems under competition environment in future. The CMELDC based on the new model at HLll will extend the application areas of nodal probabilistic production cost simulation, outage cost assessment and reliability evaluation etc. at load points. The characteristics and effectiveness of this new model are illustrated by a case study of MRBTS(Modified Roy Billinton Test System).

  • PDF