• Title/Summary/Keyword: Load Test System

Search Result 2,110, Processing Time 0.036 seconds

A Comparision on Structure Analysis and Load Test of Driving Bogie for Electrical Multiple Unit (전동차 구동대차의 구조해석 및 하중시험 비교 고찰)

  • Kim W.K.;Yoon S.C;Kwon S.T.;Park O.J.
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2005.06a
    • /
    • pp.404-409
    • /
    • 2005
  • This paper describes the result of structure analysis and load test for bogie frame. The purpose of the analysis and test is to evaluate an safety which body structure shall be considered fully sufficient rigidity so as to satisfy proper system function under maximum load. Bogie system consists of bogie frame, suspensions, wheel-sets, braking system and transmission system. Among these component, the bogie frame is most significant component subjected to the vehicle and passenger loads. The evaluation method is used the JIS E 4207 specification throughout the FEM analysis and static load test. The analysis and test results have been very safety and stable for design load conditions.

  • PDF

A Study on Load Test of Bogie for High Speed Electrical Multiple Unit (고속용 전동차 대차의 하중시험에 관한 연구)

  • Kim W.K.;Yoon S.C.;Jun C.S.;Kwon S.T.
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2005.10a
    • /
    • pp.34-38
    • /
    • 2005
  • This paper describes the result of load test of a bogie frame. The purpose of test is to evaluate the safety which bogie frame shall be considered fully sufficient rigidity so as to satisfy proper system function under maximum load. Bogie system consist of the bogie frame, suspensions, wheel-sets, a brake system and a transmission system. Among these component, the bogie frame is most significant component subjected to the vehicle and passenger loads. The evaluation method is used the JIS E 4207 specifications throughout the static load test. The test results have shown the bogie frame to be safe and stable under design load conditions.

  • PDF

A study on structural integrity and dynamic characteristic of inertial load test equipment for performance test of railway vehicle propulsion control system (철도차량 추진제어장치 성능시험을 위한 관성부하 시험설비의 구조안전성 및 동특성 평가 연구)

  • Jang, Hyung-Jin;Shin, Kwang-Bok;Lee, Sang-Hoon;Lee, Dae-Bong
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1389-1394
    • /
    • 2010
  • This paper describes the evaluation of structural integrity and dynamic characteristic of inertial load test equipments for performance test of railway vehicle propulsion control system. The propulsion control system of railway vehicle has to be confirmed of safety and reliability prior to it's application. Therefore, inertial load test equipments were designed through theoretical equation for performance test of propulsion control system. The structural analysis of inertial load test equipments was conducted using Ansys v11.0 and it's dynamic characteristic was evaluated the designed using Adams. The results showed that the structural integrity of inertial load test equipment was satisfied with a safety factor of 10.2. Also, the structural stability was proved by maximum dynamic displacement of 0.82mm.

  • PDF

Load Test and Remote Monitoring of P.C. Box Girder Bridge (P.C. BOX 교량의 재하시험 및 원격계측 유지관리 시스템)

  • Lee, Sung-Woo;Doobyong Bae;Lee, Sun-Goo
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1995.10a
    • /
    • pp.122-131
    • /
    • 1995
  • Load test for newly introduced precast segmental bridge is carried out to experimentally evaluate load carrying capacity, Analysis accompanied with the test is also performed and the results are used in the evaluation. In addition to initial evaluation of the bridge by load test, remote dynamic monitoring system to perform realtime assessment of the bridge condition is also under development. In this paper the procedure and results of load test and evaluation are presented along with introduction of dynamic monitoring system.

  • PDF

Numerical Analyses of O-Cell Load Test on Pile (양방향말뚝재하시험의 수치해석)

  • Joo, Yong-Sun;Kim, Nak-Kyoung;Kim, Woong-Jin;Park, Jong-Sik
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.748-753
    • /
    • 2008
  • Bi-directional load test is one of O-cell tests. The O-cell test is a system which may be used for performing static load tests on cast in situ reinforced concrete bored piles. The technique was devised and developed by Osterberg of Northwestern University(USA) and has been in use around the world. The principle of the method is that an O-cell is installed in a cast in situ bored pile base. Once the pile concrete reaches its design strength the cell is connected to an hydraulic pump and pressured. Pressurisation causes the cell to expand, developing an upward force on the section of pile above the cell loads, pile movements and strains within the pile then enable the capacity of the pile and its load settlement curves to be ascertained. Bi-directional load tests using O-cell are now becoming common practice around the world, particularly where the loads to be applied are high or where it is not convenient to perform top-down loading tests. In the study, calculate ultimate capacity of bi-directional load test using FEM and beam on elasto-plastic foundation theory.

  • PDF

Test and Analysis of Voltage Drop according to Load Capacity in Traction Power Supply System (전기철도 일형식 부하 크기에 따른 전압강하 측정 및 분석)

  • Kim, Joo-Rak;Jang, Dong-Uk;Chang, Sang-Hoon;Lee, Young-Heum
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.940-947
    • /
    • 2011
  • Load capacity varies according to a day of the week in traction power supply system, because time schedule in railway is changed as demand for passengers and freights. Therefore, Voltage drop also varies as load capacity. In Korea railway, Voltage collected from catenary in train is decreased, as load supplied traction power supply system is increased. Therefore, investigation about voltage drop should be performed, before development of countermeasure against voltage drop. The investigation can be performed by simulation or field test. Naturally, field test is more precise than simulation. In addition, field test should be carried out at peak load. This paper presents test and analysis about voltage drop in railway. The test is performed in both a day of the week and weekend. The analysis is figured out comparison load capacity between two days and voltage drop across terminal.

  • PDF

Development of an integrated Web-based system with a pile load test database and pre-analyzed data

  • Chen, Yit-Jin;Liao, Ming-Ru;Lin, Shiu-Shin;Huang, Jen-Kai;Marcos, Maria Cecilia M.
    • Geomechanics and Engineering
    • /
    • v.7 no.1
    • /
    • pp.37-53
    • /
    • 2014
  • A Web-based pile load test (WBPLT) system was developed and implemented in this study. Object-oriented and concept-based software design techniques were adopted to integrate the pile load test database into the system. A total of 673 case histories of pile load test were included in the database. The data consisted of drilled shaft and driven precast concrete pile axial load tests in drained, undrained, and gravel loading conditions as well as pre-analyzed data and back-calculated design parameters. Unified modeling language, a standard software design tool, was utilized to design the WBPLT system architecture with five major concept-based components. These components provide the static structure and dynamic behavior of system message flows in a visualized manner. The open-source Apache Web server is the building block of the WBPLT system, and PHP Web programming language implements the operation of the WBPLT components, particularly the automatic translation of user query into structured query language. A simple search and inexpensive query can be implemented through the Internet browser. The pile load test database is helpful, and data can be easily retrieved and utilized worldwide for research and advanced applications.

Development of Accurate Load Model for Detailed Power System Stability Analysis (전력계통 안정도 정밀해석을 위한 적정 부하모델 개발)

  • Park, S.W.;Kim, K.D.
    • Proceedings of the KIEE Conference
    • /
    • 2001.05a
    • /
    • pp.201-205
    • /
    • 2001
  • This paper presents the load modeling process and bus load models for KEPCO power system. At first, load devices commonly used in KEPCO power systems were selected, and tested for measuring the voltage and frequency sensitivity of active and reactive power. From this test, about 40 voltage and frequency dependent load models have been obtained. The bus load composition rate for KEPCO power system has been determined using the various recent surveys and papers in order to develop the load model for a power system bus. To verify the accuracy of developed bus load models, the field test for measuring active and reactive power according to artificial variation of the bus voltage was performed at 8 substations for spring summer, autumn, winter cases. With data of this seasonal field test, more reliable bus load models for KEPCO power systems were developed.

  • PDF

A Study on the Construction of Test circuit and Unification of Experiment Method for High Voltage Gas-insulated Load Switch using High Power Testing System (특고압 가스 절연 부하 개폐기의 통합형 대전력 시험 방법 및 회로 구성에 관한 연구)

  • Jung, Heung-Soo;Kim, Min-Young;Kim, Juen-Suk
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.22 no.12
    • /
    • pp.36-46
    • /
    • 2008
  • This paper is to study on the Construction of Test circuit and Unification of Experiment Method for high voltage gas-insulated load switch using high power testing system The high power testing system is a equipment to verify electrical and mechanical performance on electrical product. The system consist of short-circuit generator, back-up breaker, making switch, impedance, high voltage transformer, low voltage transformer, measuring and protection system, etc. Using this system, we can test related to high power, for example, short-time current test, active load Current test, magnetizing Current test, capacitive current test, closed loop current test, etc. Standards of high voltage gas-insulated load switch that is in use domestic distribution line are ES 5925-0002, IEC 60265-1, IEC 62271-1 and IEEE C 37.74, etc. In this paper, we standardized on the test procedure, organization of test circuit and analysis of measured data prescribed many difference standards, and applied this test method to 600[MVA] high power testing system. So that we can test the load switch satisfied standards.

Development of Full-Scale Static Test System for Aircraft Sensor Pod (항공용 센서 포드의 정적 구조시험장비 개발)

  • Jae Myung Cho;Hoon Hyuk Park;Won Woong Lee;Jong In Bae;Han Sol Lee;Eui Hwan Oh
    • Journal of Aerospace System Engineering
    • /
    • v.17 no.1
    • /
    • pp.97-105
    • /
    • 2023
  • For aviation sensor pod, structural integrity should be verified through static structural tests for flight loads induced in various maneuvering conditions of the aircraft. For this, it is necessary to develop a test system for full-scale static load test of sensor pod. Based on test requirements, this paper introduced a test system configuration of the static test and the development of test structure frame, restraints equipment, loading equipment, control, and measurement equipment. In addition, methods and procedures for verifying the developed test system were explained. In conclusion, the static load test and data acquisition were successfully performed. Reliability of the test equipment was also verified in the process.