• Title/Summary/Keyword: Load Follow Operation

Search Result 38, Processing Time 0.026 seconds

Development of Asynchronous Blocking Algorithm through Asynchronous Case Study of Steam Turbine Generator (스팀터빈 발전기 비동기 투입 사례연구를 통한 비동기 방지 알고리즘 개발)

  • Lee, Jong-Hweon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.10
    • /
    • pp.1542-1547
    • /
    • 2012
  • Asynchronous phenomenon occurs on the synchronous generators under power system when a generator's amplitude of electromagnetic force, phase angle, frequency and waveform etc become different from those of other synchronous generators which can follow instantly varying speed of turbine. Because the amplitude of electromagnetic force, phase frequency and waveform differ from those of other generators with which are to be put into parallel operation due to the change of excitation condition for load sharing and the sharing load change, if reactive current in the internal circuit circulates among generators, the efficiency varies and the stator winding of generators are overheated by resistance loss. When calculation method of protection settings and logic for protection of generator asynchronization will be recommended, a distance relay scheme is commonly used for backup protection. This scheme, called a step distance protection, is comprised of 3 steps for graded zones having different operating time. As for the conventional step distance protection scheme, zone 2 can exceed the ordinary coverage excessively in case of a transformer protection relay especially. In this case, there can be overlapped protection area from a backup protection relay and, therefore, malfunctions can occur when any fault occurs in the overlapped protection area. Distance relays and overcurrent relays are used for backup protection generally, and both relays have normally this problem, the maloperation, caused by a fault in the overlapped protection area. Corresponding to an IEEE standard, this problem can be solved with the modification of the operating time. On the other hand, in Korea, zones are modified to cope with this problem in some specific conditions. These two methods may not be obvious to handle this problem correctly because these methods, modifying the common rules, can cause another coordination problem. To overcome asynchronizing protection, this paper describes an improved backup protection coordination scheme using a new logic that will be suggested.

Influence of the Francis Turbine location under vortex rope excitation on the Hydraulic System Stability

  • Alligne, S.;Nicolet, C.;Allenbach, P.;Kawkabani, B.;Simond, J.J.;Avellan, F.
    • International Journal of Fluid Machinery and Systems
    • /
    • v.2 no.4
    • /
    • pp.286-294
    • /
    • 2009
  • Hydroelectric power plants are known for their ability to cover variations of the consumption in electrical power networks. In order to follow this changing demand, hydraulic machines are subject to off-design operation. In that case, the swirling flow leaving the runner of a Francis turbine may act under given conditions as an excitation source for the whole hydraulic system. In high load operating conditions, vortex rope behaves as an internal energy source which leads to the self excitation of the system. The aim of this paper is to identify the influence of the full load excitation source location with respect to the eigenmodes shapes on the system stability. For this, a new eigenanalysis tool, based on eigenvalues and eigenvectors computation of the nonlinear set of differential equations in SIMSEN, has been developed. First the modal analysis method and linearization of the set of the nonlinear differential equations are fully described. Then, nonlinear hydro-acoustic models of hydraulic components based on electrical equivalent schemes are presented and linearized. Finally, a hydro-acoustic SIMSEN model of a simple hydraulic power plant, is used to apply the modal analysis and to show the influence of the turbine location on system stability. Through this case study, it brings out that modeling of the pipe viscoelastic damping is decisive to find out stability limits and unstable eigenfrequencies.

A Study on Protection of Generator Asynchronization by Impedance Relaying (임피던스 계전기를 이용한 발전기 비동기 투입 보호 연구)

  • Lee, Jong-Hweon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.11
    • /
    • pp.2000-2006
    • /
    • 2011
  • Asynchronous phenomenon occurs on the synchronous generators under power system when a generator's amplitude of electromagnetic force, phase angle, frequency and waveform etc become different from those of other synchronous generators which can follow instantly varying speed of turbine. Because the amplitude of electromagnetic force, phase frequency and waveform differ from those of other generators with which are to be put into parallel operation due to the change of excitation condition for load sharing and the sharing load change, if reactive current in the internal circuit circulates among generators, the efficiency varies and the stator winding of generators are overheated by resistance loss. Where calculation method of protection settings and Logic for Protection of Generator Asynchronization will be recommended, A distance relay scheme is commonly used for backup protection. This scheme, called a step distance protection, is comprised of 3 steps for graded zones having different operating time. As for the conventional step distance protection scheme, Zone 2 can exceed the ordinary coverage excessively in case of a transformer protection relay especially. In this case, there can be overlapped protection area from a backup protection relay and, therefore, malfunctions can occur when any fault occurs in the overlapped protection area. Distance relays and overcurrent relays are used for backup protection generally, and both relays have normally this problem, the maloperation, caused by a fault in the overlapped protection area. Corresponding to an IEEE standard, this problem can be solved with the modification of the operating time. On the other hand, in Korea, zones are modified to cope with this problem in some specific conditions. These two methods may not be obvious to handle this problem correctly because these methods, modifying the common rules, can cause another coordination problem. To overcome asynchronizing protection this paper describes an improved backup protection coordination scheme using a new Logic that will be suggested.

Development of a decision support system for high quality NC data selection in mold manufacturing (고품질의 사출금형 NC 가공 데이터 선정을 위한 의사결정지원시스템 개발)

  • Heo, Eun-Young;Kim, Bo-Hyun;Kim, Dong-Won;Cho, Min-Ho
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2005.05a
    • /
    • pp.1101-1107
    • /
    • 2005
  • Mold industry has the difficulty to employ young people as the successors of the skilled workers, because it has been regarded as a 3D-jobs(dirty, difficult, and dangerous). To overcome this situation, thus, manufacturing technologies maintained in the factory should be systemized, and engineering systems should support unskilled workers to do their jobs without any difficulty. As a research of developing the supporting system, this study proposes a decision support system that facilitates unskilled workers to easily select high quality NC-data, as well as to increase productivity. The proposed system is assumed to follow a CAM operation scenario that consists of next three steps: 1) identifying several process plans and enumerating feasible unit machining operations (UMOs) from material and part surface information, 2) creating all feasible NC-data based on UMOs using a commercial CAM system, 3) selecting the best NC data among the feasible NC data using four screening criteria, such as machining accuracy, machining allowance, cutting load, and processing time. A case study on the machining of a camera core mold is provided to demonstrate the proposed system.

  • PDF

Studies on Working Intensity in Felling Operation of the Thinning Forest -In Thinning of Some Conifer Species- (벌채작업(伐採作業)에서의 작업강도(作業强度) 측정연구(測定硏究) -침엽수(針葉樹) 간벌림에(間伐林)서-)

  • Park, Soo-Kyoo;Kang, Gun-Uh
    • Journal of Korean Society of Forest Science
    • /
    • v.85 no.3
    • /
    • pp.396-408
    • /
    • 1996
  • The purposes of this study were to standardise the forest working system to design the intensity of working system in felling operation of the thinning forest in our country as well as to contrive the improvement of working method and the increase of productivity. For the purpose of investigating these, element working was classified by felling operation in softwood thinning forest, and a pulse rate were measured and analyzed. The results were as follow : 1. From the analysis of the pulse frequence measurment, the average pulse showed 108 pulse per minute for worker A in the total of pure working time, 130 pulse per minutes for worker B, 119 pulse per minute for worker C and 125 pulse per minute for worker D, respectively. 2. From the results of the pulse frequence analysis according to element working classification, the highest pulse frequence represented 115 pulse per minute for worker A in the circumference, 131 pulse per minute for worker B in the movement, 122 pulse per minute for worker C in the limbing operation and 128 pulse per minute for work D in hang-up. 3. If the original pulse frequence was 100% for workers, the working intensity showed as follow : worker A was 160%(original pulse frequence was 61=100%) for the total of the working intensity and 188% for the circumference among element working. Worker B was 220%(original pulse frequence was 57=100%) for the total of the working intensity and 229 for movement among element working. Worker C was 159%(original pulse frequence was 73=100%) for the total of the working intensity and 168% for limbing operation among the element working. Worker D was 156%(original pulse frequence was 70=100%) for the total of working intensity and 182% for hang-up among element working. 4. At the limit point of Labor performance rating, showing the total of working intensity, overtime pulse rate per minute was 30 for worker A, 207 for worker B, 14 for worker C and 67 for worker D. Worker B was highest in working intensity, and got physically a big load.

  • PDF

Development of Low-Cost, Double-Speed, High-Precision Operation Control System for Range Extender Engine (레인지 익스텐더 전기자동차 엔진용 저가형 2단속도 고정밀 운전제어시스템 개발)

  • Ham, Yun-Young;Lee, Jeong-Jun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.11
    • /
    • pp.529-535
    • /
    • 2018
  • The range extender vehicle runs on a mechanism that allows the small power generation engine to start in the most efficient specific operating range to charge the battery and extend the mileage. In this study, we developed a step motor type intake air supply system that replaces existing throttle body system to develop a simple low cost control logic system. The system was applied to the existing base engine, and in order to improve the performance by increasing the amount of intake air, the effect of changing the length of the intake and exhaust manifold was experimentally examined. As a result, the Type B intake air control actuator operated by one step motor showed higher performance than the Type A in all the operation region, but the performance was lower than that of the base engine due to the increase of flow resistance. To improve this, it was confirmed that the engine performance was improved at both speeds of 2200rpm and 4300rpm when the 140mm adapter was installed in the intake manifold and when the newly designed 70mm exhaust manifold was applied. Through this process, high - precision operation control was realized by connecting the generator load to the optimized engine for the range extender electric vehicle. Experimental results showed that the speed change rate was within ${\pm}2.5%$ at 2200rpm in 1st stage and 4300rpm in 2nd stage and the speed follow-up result of 610 rpm/s was obtained when the speed was increased from 2200rpm to 4300rpm.

Various Modalities of Flap Surgery in Heel Pad Reconstruction (발뒤꿈치의 재건 시에 사용할 수 있는 다양한 피판술)

  • Jung, Yun-Ik;Lee, Dong-Won;Yoon, In-Sik;Rah, Dong-Kyun;Lee, Won-Jai
    • Archives of Plastic Surgery
    • /
    • v.38 no.4
    • /
    • pp.415-420
    • /
    • 2011
  • Purpose: The reconstruction of a soft tissue defect of the heel pad can be challenging. One vital issue is the restoration of the ability of the heel to bear the load of the body weight. Many surgeons prefer to use local flaps or free tissue transfer rather than a skin graft. In this study, we evaluated the criteria for choosing a proper flap for heel pad reconstruction. Methods: In this study, 23 cases of heel pad reconstruction were performed by using the flap technique. The etiologies of the heel defects included pressure sores, trauma, or wide excision of a malignant tumor. During the operation, the location, size and depth of the heel pad defect determined which flap was chosen. When the defect size was relatively small and the defect depth was limited to the subcutaneous layer, a local flap was used. A free flap was selected when the defect was so large and deep that almost entire heel pad had to be replaced. Results: There was only one complication of poor graft acceptance, involving partial flap necrosis. This patient experienced complete recovery after debridement of the necrotic tissue and a split thickness skin graft. None of the other transferred tissues had complications. During the follow-up period, the patients were reported satisfactory with both aesthetic and functional results. Conclusion: The heel pad reconstructive method is determined by the size and soft-tissue requirements of the defect. The proper choice of the donor flap allows to achieve satisfactory surgical outcomes in aesthetic and functional viewpoints with fewer complications.

An Expanded Use of Reactor Power Cutback System to Avoid Reactor Trips in the Event of an Inward Control Element Assembly Deviation (제어봉 인입편차시의 원자로 비상정지 방지를 위한 출력 급감발 계통의 확대 적용)

  • Hwang, Hae-Ryong;Ahn, Dawk-Hwan
    • Nuclear Engineering and Technology
    • /
    • v.25 no.2
    • /
    • pp.276-284
    • /
    • 1993
  • The ABB-CE System-80 reactor power cutback system(RPCS) is designed to enable continuous operation of the reactor without trip in the events of the loss of one of the two main feedwater pumps and loss of load, and thus improves plant availability in a cost effective manner. In this study expansion of RPCS has been investigated for continuous reactor operation without trip in the event of an inward control element assembly(CEA) deviation including a single rod drop. Under the expanded function of RPCS the control system will provide a rapid core power reduction on demand by releasing CEAs to drop into the core and reduce the turbine power, if necessary, to follow the reactor power variation. This design feature which is included as the new design features to be incorporated in the ABB-CE System-80+ meets the EPRI advanced light water reactor(ALWR) requirements. For this study core analysis models of System-80+ have been developed to simulate the nuclear steam supply system(NSSS) response as well as the RPCS initiation of rapid CEA insertion. The results of this study demonstrate that the reactor trip can be avoided in the event of inward CEA deviation including a single rod drop by the RPCS initiation and thus the plant availability and capacity factor would be increased.

  • PDF