• Title/Summary/Keyword: Load Duration Curve

Search Result 128, Processing Time 0.027 seconds

Final Settlement Prediction Methods of Embankments on Soft Clay by Back Analysis (역해석에 의한 연약지반 최종침하량 추정)

  • Lim, Seong Hun;Kang, Yea Mook;Lee, Dal Won
    • Korean Journal of Agricultural Science
    • /
    • v.25 no.2
    • /
    • pp.247-259
    • /
    • 1998
  • Analyses which loads were regarded as instant load and gradual step load were performed with data measured on gradually loaded field, and the results were inspected to find effect of load condition, and final settlements predicted by Hyperbolic, Tan's, Asaoka's, and Monden's method were compared with each other. According to above analyses, the following conclusions were obtained. Settlement curves which loads were regarded as instant load and gradual step load were beginning to coincide at time of twice duration of embankment. On the ground installed vertical drain, the result of Hyperbolic, Tan's, Asaoka's, Monden's, curve fitting I, and curve fitting II (simple, Carrillo) methods make conclude that Asaoka, curve fitting I, and curve fitting II methods agree with measured settlement.

  • PDF

Improvement of Water Quality and Streamflow Monitoring to Quantify Point and Nonpoint Source Pollutant Loads (점오염원과 비점오염원 부하량 정량화를 위한 수질 유량 모니터링 개선)

  • Jang, Ju-Hyoung;Lee, Hyung-Jin;Kim, Hyun-Koo;Park, Ji-Hyoung;Kim, Ji-Ho;Rhew, Doug-Hee
    • Journal of Korean Society on Water Environment
    • /
    • v.26 no.5
    • /
    • pp.860-870
    • /
    • 2010
  • Long term monthly monitoring data showed that the water quality of streams flowing into Lake Paldang has been improved by various strategy for water. However, the effect of quality on Lake Paldang is still insufficient because of nonpoint source from watershed. In order to evaluate quantifying methods for pollution source and make a suggestion on improvements, Storm Water Management Model (SWMM) was constructed by using data set from the water quality and streamflow monitoring network in the Kyoungan watershed for Total Maximum Daily Loads (TMDLs). Load duration curve (LDC) based on the result of the Kyoungan watershed SWMM indicated that the water quality criterion on $BOD_5$ was often exceeded in up-stream than down-stream. From flowrate-load correlation curve, SS load significantly increased as streamflow increases. 75.3% of streamflow and 62.1% of $BOD_5$ loads is discharged especially in the zone of high flows, but monitoring data set didn't provide proper information about the conditions and the patterns associated with storm events. Therefore, it is necessary to acquire representative data set for comparing hydrograph and pollutograph through monitoring experimental watershed and to establish methods for quantifying point and nonpoint source pollutant loads.

Generation Mix Analysis based on the Screening Curve and WASP-IV Techniques (탐색곡선법과 WASP-IV 모형을 이용한 국내 적정 전원구성 분석)

  • Jang, Se-Hwan;Park, Jong-Bae;Roh, Jae-Hyung
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.4
    • /
    • pp.534-541
    • /
    • 2012
  • This paper tries to elicit an optimal generation mix of Korea. Two approaches, using the screening curve method and taking advantage of a generation expansion planning tool, WASP-IV, are applied in getting the mix. The data used in this study is based on the 5th basic plan for long-term electricity supply and demand. The Load Duration Curve, that is needed for applying Screening Curve Method(SCM), is made based on the load profile in 2010. In our using SCM, the nuclear plant's operation characteristic, carbon emission cost and spinning reserve are considered. In using WASP-IV to get the adequate generation mix, the base and target demand forecasts in the 5th basic plan are used and the carbon emission cost is also considered. In this paper, It introduces the domestic adequacy generation mix in 2024 though SCM and WASP-IV.

Establishment of Target Water Quality for TOC of Total Water Load Management System (오염총량관리제도의 TOC 목표수질 설정 방안)

  • Kim, Yong Sam;Lee, Eun Jeong
    • Journal of Korean Society on Water Environment
    • /
    • v.35 no.6
    • /
    • pp.520-538
    • /
    • 2019
  • In this study, it was proposed that a method of setting the target water quality for TOC using the watershed model and the load duration curves to manage non-biodegradable organics in the total water load management system. To simulate runoff and water quality of the watershed, the HSPF model is used which is appropriate for urban and rural areas. Additionally, the load duration curve is used to reflect the variable water quality correlated with various river flow rates in preparing the TMDL plans in the U.S. First, the model was constructed by inputting the loads calculated from the pollutant sources in 2015. After the calibration and verification process, the water quality by flow conditions was analyzed from the BOD and TOC simulation results. When the BOD achieved the target water quality by inputting the target year loads for 2020, the median and average values of TOC were proposed for the target water quality. The provisional method of TOC target water quality for the management of non-biodegradable organics, which is one of the challenges of the total water load management system, was considered. In the future, it is expected to be used as basic data for the conversion of BOD into TOC in the total water load management system.

An Efficient Revenue/Profit Evaluation Method Based on Probabilistic Production Costing Technique (확률적 운전비계산 모형에 기초한 발전기 수입/순익 평가 방법론 개발)

  • 박종배;신중린;김민수;전영환
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.51 no.12
    • /
    • pp.638-646
    • /
    • 2002
  • This paper presents an efficient algorithm for evaluating the Profit and revenue of generating units in a competitive electricity market based on the probabilistic production costing technique. The accurate evaluation of the profit and revenue of generating units for long-term perspectives is one of the most important issues in a competitive electricity market environment. For efficient calculation of the profit and revenue of generating units under the equivalent load duration curve(ELDC), a new approach to figure out the marginal plants and the corresponding market clearing prices during a time period in a probabilistic manner is developed. The mathematical formulation and illustrative application of the suggested method is presented.

Development of Ridge Regression Model of Pollutant Load Using Runoff Weighted Value Based on Distributed Curve-Number (분포형 CN 기반 토지피복별 유출가중치를 이용한 오염부하량 능형회귀모형 개발)

  • Song, Chul Min;Kim, Jin Soo
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.60 no.1
    • /
    • pp.111-120
    • /
    • 2018
  • The purpose of this study was to develop a ridge regression (RR) model to estimate BOD and TP load using runoff weighted value. The concept of runoff weighted value, based on distributed curve-number (CN), was introduced to reflect the impact of land covers on runoff. The estimated runoff depths by distributed CN were closer to the observed values than those by area weighted mean CN. The RR is a technique used when the data suffers from multicollinearity. The RR model was developed for five flow duration intervals with the independent variables of daily runoff discharge of seven land covers and dependent variables of daily pollutant load. The RR model was applied to Heuk river watershed, a subwatershed of the Han river watershed. The variance inflation factors of the RR model decreased to the value less than 10. The RR model showed a good performance with Nash-Sutcliffe efficiency (NSE) of 0.73 and 0.87, and Pearson correlation coefficient of 0.88 and 0.93 for BOD and TP, respectively. The results suggest that the methods used in the study can be applied to estimate pollutant load of different land cover watersheds using limited data.

Evaluation of Applicability for Nonpoint Discharge Coefficient using Watershed Model (유역모형을 이용한 비점배출계수 적용성 평가)

  • Lee, Eun Jeong;Kim, Tae Geun
    • Journal of Environmental Impact Assessment
    • /
    • v.21 no.3
    • /
    • pp.339-352
    • /
    • 2012
  • Total maximum daily load have been implemented and indicated that nonpoint discharge coeffients in flow duration curve were 0.50 of Normal flow duration ($Q_{185}$) and 0.15 of low flow duration($Q_{275}$). By using SWAT, nonpoint discharge coefficients are studied with the conditions of the instream flow and the rainfall in two study areas. The nonpoint discharge coefficient average of BOD and TP for normal flows duration in 3 years are 0.32~0.36 and 0.28~0.31. For the low flow duration, the nonpoint discharge coefficient avergae of BOD and TP were 0.10~0.12 and 0.10~0.11. These are lower than the coefficients of total maximum load regulation. There are big differences between one of regulation and one of SWAT for the normal flow duration. With the consideration of rainfall condition, the nonpoint discharge coefficient of flood flow duration are influenced on the amount of rainfalls. However, the nonpoint discharge coefficients of normal flow duration and low flow duration are not effected by the rainfall condition. Since the spatial distribution and geomorphological characteristics could be considered with SWAT, the estimation of nonpoint discharge coefficient in watershed model is better method than the use of the recommended number in the regulation.

Variation of Load Management Incentive Considering Prenotification Period (예고기간별 차이를 반영한 부하조정제도 지원금 차등방안)

  • Won, Jong-Ryul
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.11
    • /
    • pp.1578-1583
    • /
    • 2012
  • There are 3 systems in incentive-based normal load management in Korea; day or hour-ahead, week-ahead, months-ahead. These are originally similar in their operational implementation, but differ in their pre-notification period. Therefore the incentive of these systems should be different according to prenotification period. This is the key problem in implementing these load managements. Customers participating in these load managements feel their economic differences, depending on the risk by prenotification dates. The shorter prenotification period, the more risk take the customers. This paper proposes the method of incentive variation in prenotification difference, by using the theory of financial yield curve, which is used in analysing short and long duration bond interesting rates and is reflecting risk premium in their period.

Study on the Application of Spatial-analysis of Pollutants and Load Duration Curve for Efficient Implementation of TMDLs system (오염원 공간분석 및 오염부하지속곡선을 통한 맞춤형 수질오염총량제 추진방안 연구)

  • Park, Baekyung;Ryu, Jichul;Na, EunHye;Seo, Jiyeon;Kim, Yongseok
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.39 no.12
    • /
    • pp.655-663
    • /
    • 2017
  • It is difficult to manage hotspot area and to establish the reduction plan considering with spatial-distribution on Korea TMDLs (Total Maximun Daily Loads) system. To solve this problems, methods of Load Duration Curve (LDC) using long-term flow and water quality data, and spatial-analysis were applied on present TMDLs. Jinwi A watershed which is enforced TMDLs plan were selected to study area. Results of application of suggested methods in this study to Jinwi watershed, Hwangguji tributary was selected to hotspot area and Jinwi tributary was exclued. Also, middle area of Hwangguji tributary was needed a reduction plan for the protection of non-point source pollution. In downstream area, livestock manure should be managed additionally. The new methods suggested in this study were useful to increase healthiness for total watershed.

Analysis of Water bady Damage at Osu Stream Using the Flow-Loading Equation and 8-Day Intervals Cumulative Flow Duration Curve (유량-부하량 관계식과 8일 간격 누적유량지속곡선을 이용한 오수천의 수체 손상도 분석)

  • Lee, Young Sung;Kim, Young Suk;Han, Sung Wook;Seo, kwon ok;Lim, chang bok;Lee, Yeong Jae;Kim, Kyunghyun;Jung, Kang-Young
    • Journal of Environmental Science International
    • /
    • v.27 no.12
    • /
    • pp.1179-1193
    • /
    • 2018
  • The purpose of this study at water quality pollutants to propose proper management method for the Osu-A unit watershed which is the influent tributary located upstream of the Sumjin -river among the 13 unit watersheds in the Sumjin-river water system. Analyzed the correlation between flow-pollution loading and the correlation between land use type, BOD and TP items, and analyzed 8-day intervals Cumulative Flow Duration Curve (CFDC) and Load Duration Curve (LDC) to evaluate water quality damage. As a result, both BOD and TP were larger than 1 and the concentration of water pollutants increased with increasing flow. BOD was positively correlated with Urban and Field, and TP was positively correlated with Field with 0.710. As a result of the LDC, BOD was analyzed that the target water quality was achieved with the excess rate of less than 50%, and TP exceeded the target water quality by 50.1%. BOD usually exceeded the standard value (exceedance probability 50%) at low flow zone and On the other hand, TP usually exceeded the standard value at high flow zone. Monthly BOD (April to June) and TP (May to August) exceeded the standard. Sewage Wastewater treatment and non-point pollution control is Osu-A unit watersheds are effective in improving BOD and TP.