Variation of Load Management Incentive Considering Prenotification Period  

Won, Jong-Ryul (안양대 이공대학 전기전자공학과)
Publication Information
The Transactions of The Korean Institute of Electrical Engineers / v.61, no.11, 2012 , pp. 1578-1583 More about this Journal
Abstract
There are 3 systems in incentive-based normal load management in Korea; day or hour-ahead, week-ahead, months-ahead. These are originally similar in their operational implementation, but differ in their pre-notification period. Therefore the incentive of these systems should be different according to prenotification period. This is the key problem in implementing these load managements. Customers participating in these load managements feel their economic differences, depending on the risk by prenotification dates. The shorter prenotification period, the more risk take the customers. This paper proposes the method of incentive variation in prenotification difference, by using the theory of financial yield curve, which is used in analysing short and long duration bond interesting rates and is reflecting risk premium in their period.
Keywords
Load management; Incentive; Yield curve; Risk premium;
Citations & Related Records
연도 인용수 순위
  • Reference
1 한국전력공사 수요관리, http://www.kepco.co.kr/dsm/
2 지식경제부, 기초전력연구원, "부하관리기기 지원실태조사 및 합리적 개선방안 수립", 2008. 3
3 Ruben D. Cohen, A VaR-based Model for the Yield Curve, WILMOTT magazine.
4 이준행, "Nilson-Siegel모형을 이용한 이자율기간구조의 추정 및 예측", 선물연구, 제12권 제2호, p.101-126, 2004. 11.
5 한국금융연구원 임형석, "우리나라 수익률곡선 추정과 특징", 경제분석, 제11권 2호, 2005. 6.