• Title/Summary/Keyword: Lining method

Search Result 390, Processing Time 0.027 seconds

Detection of the Cavity Behind the Tunnel Lining by Single Channel Seismic and GPR Method (GPR 및 단일채널 탄성파탐사에 의한 터널라이닝 배면공동 조사)

  • Shin, Sung-Ryul;Jo, Chul-Hyun;Shin, Chang-Soo;Yang, Seung-Jin;Jang, Won-Yil
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.2 no.4
    • /
    • pp.148-158
    • /
    • 1998
  • Determining the thickness if concrete lining and detecting of the cavity where is located behind tunnel lining plays an important role in the safety diagnosis of tunnel structure and the quality control. In this study, we made use of GPR and seismic method in order to find the cavity or flaw. Although GPR is very useful method in the concrete lining without rebar, it is difficult to detect the cavity in the reinforced concrete lining. We applied mini-seismic method to the reinforced concrete lining. The obtained seismic data was processed by means of seismic section in time domain and image section of power spectrum in frequency domain using Impact-Echo method as well. The proposed method can accurately show the location and depth of the cavity in the reinforced concrete lining.

  • PDF

AN EXPERIMENTAL STUDY FOR THE EFFECT OF SANDWICH TECHNIQUE ON MICROLEAKAGE IN CLASS V CAVITY (Sandwich 술식에 제V급 와동의 미세 변연누출에 미치는 영향에 대한 연구)

  • Shin, Chang-Seung;Lee, Chung-Suck
    • Restorative Dentistry and Endodontics
    • /
    • v.18 no.2
    • /
    • pp.447-462
    • /
    • 1993
  • To evaluate the marginal leakage in Class V cavity this study has been undertaken to compare the sandwich technique with the conventional method, and find out the effect of lining material, lining method, and polishing time on sandwich technique. Ninty extracted teeth were divided into eight test groups and a control group, and were prepared with a buccal Class V cavity. Four test groups were lined with Dentin Cement whereas the other four test groups were lined with Vitrabond. Half of the either group were lined 0.5mm short of the carvosurface margin and the rest were lined completely to the carvosurface margin. The four subgroups were further divided into specimens which were polished immediately and 24 hours after resin filling. The polished specimens were immersed in $37^{\circ}C$, 0.5% methylene blue solution for 24 hous after thermocycling at $5^{\circ}C$ and $55^{\circ}C$, 200 times and buccolingually sectioned. The sectioned specimens were examined dye penetration under the light microscope. The following results were obtained, 1. At the enamel margin, the conventional method showed a lower microleakage than the sandwich technique. The difference between the control and Vitrabond group was statistically significant(P<0.05), but no difference between the control and Dentin Cement group, and between the lining materials was observed. 2. At the dentinal margin, the sandwich technique showed a significant lower amount of microleakage (P<0.05), but there was no significant difference between the lining materials. 3. Regardless of the lining material, lining method, and polishing time used, values of microleakage were significantly higher at the dentinal margin compared to the enamel margin(P<0.05). 4. In specimens till the cavosurface margin, microleakage at the dentinal margin was less with the light-cured base than with the chemically-cured base, but there was no siginificantly difference between the lining materials regarding the lining method and polishing time. 5. The lining material, lining method, and polishing time did not affect the amount of micro leakage in the sandwich technique(P<0.05).

  • PDF

Analysis of the Concrete Lining for Water Pressure Tunnel (수로 압력터널의 콘크리트Lining 해석)

  • 김승권;임정열;공천석;안주옥
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2001.10a
    • /
    • pp.27-33
    • /
    • 2001
  • Objective of this study is to investigate the structural behavior of the concrete lining in water pressure tunnel. In many cases, the concrete lining of water pressure tunnel has not considered as a major structure comparing to the other structures, resulting in use of conservative analysis and design. For the detailed analysis of concrete lining of water pressure tunnel, factors such as rock pressure and water pressure have to be considered. In this study, analysis of concrete lining was performed by using beam element method, shell element method and solid element method. Analysis results showed that the tensile stress at crown of concrete lining is greatly affected by the stability of concrete lining and the tensile stress for the concrete lining has to be evaluated for the section where maximum moment is occurred.

  • PDF

Hydro-mechanical interaction of reinforced concrete lining in hydraulic pressure tunnel

  • Wu, He-Gao;Zhou, Li;Su, Kai;Zhou, Ya-Feng;Wen, Xi-Yu
    • Structural Engineering and Mechanics
    • /
    • v.71 no.6
    • /
    • pp.699-712
    • /
    • 2019
  • The reinforced concrete lining of hydraulic pressure tunnels tends to crack under high inner water pressure (IWP), which results in the inner water exosmosis along cracks and involves typical hydro-mechanical interaction. This study aims at the development, validation and application of an indirect-coupled method to simulate the lining cracking process. Based on the concrete damage plasticity (CDP) model, the utility routine GETVRM and the user subroutine USDFLD in the finite element code ABAQUS is employed to calculate and adjust the secondary hydraulic conductivity according to the material damage and the plastic volume strain. The friction-contact method (FCM) is introduced to track the lining-rock interface behavior. Compared with the traditional node-shared method (NSM) model, the FCM model is more feasible to simulate the lining cracking process. The number of cracks and the reinforcement stress can be significantly reduced, which matches well with the observed results in engineering practices. Moreover, the damage evolution of reinforced concrete lining can be effectively slowed down. This numerical method provides an insight into the cracking process of reinforced concrete lining in hydraulic pressure tunnels.

New Austrian Tunneling Method (일본의 NATM시공)

  • Toyoki Kadoya
    • Explosives and Blasting
    • /
    • v.9 no.4
    • /
    • pp.22-31
    • /
    • 1991
  • NATM technic had been applied to Nakaya tunnel of Sin kan express R.R lines in 1975. on the worst expandable geological conditions, application of NATM method was carried out good result. Measurement data which include convergencymeter, inclinometer, extensometor load-cell, strain gage data of shotcrete stress and steel arch. was explained with slides. Induced NATM technic has been improved since 1975 as follows, specially adhesive method of shotcrete instead of spray method such as tunnel swift lining Sliding press lining, clean lining by pumping and sweeping tote lining ets.

  • PDF

Numerical Heat Transfer and Fluid Flow of Brake Disk-lining for Rolling Stock (철도차량용 제동 디스크-라이닝의 열유동 해석)

  • 남성원;조장형
    • Proceedings of the KSR Conference
    • /
    • 1999.11a
    • /
    • pp.93-98
    • /
    • 1999
  • Numerical simulation is conducted to clarify the heat transfer and fluid flow characteristics of brake disk-lining for rolling stock. Multiple rotational reference frame, k-epsilon turbulent model and SIMPLE algorithm based on finite volume method are used to solve the physical disk-lining model. The governing equations are solved by TDMA(TriDiagonal Matrix Algorithm) with line-by-line method and block correction, From the results of simulation, the characteristics of cooling pattern is strongly affected by the grooves in lining. The face lift of lining affects on the temperature distribution of rear surface of lining as well as the front surface of that. Due to the grooves in lining, it will be expected to extend the maintenance life circle of lining.

  • PDF

A New Method for Elasto-Plastic Analysis of Concrete Lining Installed in a Deep Circular Tunnel (심부 원형터널에 시공된 콘크리트 라이닝의 새로운 탄소성해석법)

  • Lee, Youn-Kyou;Park, Kyung-Soon;Song, Won-Kyong;Park, Chul-Whan;Choi, Byung-Hee
    • Tunnel and Underground Space
    • /
    • v.19 no.4
    • /
    • pp.355-365
    • /
    • 2009
  • This paper proposes an elasto-plastic finite difference method which is useful for the stability evaluation of concrete lining installed in a deep circular tunnel. Mohr-Coulomb criterion is assumed for the condition of yielding in both the rock mass and concrete lining. In order to take into account the installation delay of lining after the excavation, the outer boundary pressure acting on the lining was calculated with the consideration of the convergence occurred before the lining installation. The distributions of stress and displacement in the rock mass and lining were calculated based on the method proposed Lee & Pietruszczak (2008). The applicability of the proposed method was demonstrated by conducting the elasto-plastic analysis of concrete lining supporting an imaginary compressed air storage tunnel. The analysis result revealed that the exact determination of the boundary pressures acting on the concrete lining is of importance in the stability analysis of concrete lining.

Estimation for Primary Tunnel Lining Loads

  • Kim, Hak-Joon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1998.05a
    • /
    • pp.153-204
    • /
    • 1998
  • Prediction of lining loads due to tunnelling is one of the major issues to be addressed in the design of a tunnel. The objective of this study is to investigate rational and realistic design loads on tunnel linings. factors influencing the lining load are summarized and discussed. The instruments for measuring the lining loads are reviewed and discussed because field measurements are often necessary to verify the design methods. Tunnel construction in the City of Edmonton has been very active for storm and sanitary purposes. Since the early 1970's, the city has also been developing an underground Light Rail Transit system. The load measurements obtained from these tunnels are compared with the results from the existing design methods. However, none of the existing methods are totally satisfactory, Therefore, there is some room for improvement in the prediction of lining loads. The convergence-confinement method is reviewed and applied to a case history of a tunnel in Edmonton. The convergence curves are obtained from 2-D finite element analyses using three different material models and theoretical equations. The limitation of the convergence-confinement method is discussed by comparing these curves with the field measurements. Three-dimensional finite element analyses are performed to gain a better understanding of stress and displacement behaviour near the tunnel face. An improved design method is proposed based on the review of existing design methods and the performance of numerical analyses. A specific method or combination of two different methods is suggested for the estimation of lining loads for different conditions of tunnelling. A method to determine the stress reduction factor is described. Typical values of dimensionless load factors nD/H for tunnels in Edmonton are obtained from parametric analyses. Finally, the loads calculated using the proposed method are compared with field measurements collected from various tunnels in terms of soil types and construction methods to verify the method. The proposed method gives a reasonable approximation of the lining loads. The proposed method is recommended as an approximate guideline for the design of tunnels, but the results should be confirmed by field measurements due to the uncertainties of the ground and lining properties and the construction procedures, This is the reason that in-situ monitoring should be an integral part of the design procedure.

  • PDF

Numerical Study for Tunnel Shotcrete Lining Operated Stress Measurement Techique Development During a Construction (시공중 터널 숏크리트 라이닝 작용응력 측정기법 개발을 위한 수치해석적 연구)

  • Shin, Hyu-Seong;Kim, Dong-Gyou;Jung, Yong-Su;Hwang, Jae-Hong;Bae, Gyu-Jin
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.754-761
    • /
    • 2008
  • In general, stress measurement of existent shotcrete lining be used by pressure cells. but, measuring instrument is lost by high pressure at shotcrete lining construction and pressure cell's measurement value have to low believability by natural conditions like curing temperature. In this study, proposed techniques to measure without utilizing sensitive stress sensor in natural condition at point that want stress of shotcrete lining after shotcrete lining construction. Executed numerical analysis to forecast stress level that interact in tunnel shotcrete lining, measured strain of hole by load action through hole in shotcrete lining. 3D FEM(finite element method) is enforced through various parameters curing time of shotcrete lining, thickness, load condition. Different model cases applied by parametic study. As analysis result, it could grasp development possibility of method that propose this time because it could examine corelation with strain by near hole of shotcrete lining and stress about load condition.

  • PDF

Numerical investigation of segmental tunnel linings-comparison between the hyperstatic reaction method and a 3D numerical model

  • Do, Ngoc Anh;Dias, Daniel;Oreste, Pierpaolo
    • Geomechanics and Engineering
    • /
    • v.14 no.3
    • /
    • pp.293-299
    • /
    • 2018
  • This paper has the aim of estimating the applicability of a numerical approach to the Hyperstatic Reaction Method (HRM) for the analysis of segmental tunnel linings. For this purpose, a simplified three-dimensional (3D) numerical model, using the $FLAC^{3D}$ finite difference software, has been developed, which allows analysing in a rigorous way the effect of the lining segmentation on the overall behaviour of the lining. Comparisons between the results obtained with the HRM and those determined by means of the simplified 3D numerical model show that the proposed HRM method can be used to investigate the behaviour of a segmental tunnel lining.