• 제목/요약/키워드: Line-focus

검색결과 597건 처리시간 0.041초

Geotechnical parameters from pressuremeter tests for MRT Blue Line extension in Bangkok

  • Likitlersuang, Suched;Surarak, Chanaton;Wanatowski, Dariusz;Oh, Erwin;Balasubramaniam, Arumugam
    • Geomechanics and Engineering
    • /
    • 제5권2호
    • /
    • pp.99-118
    • /
    • 2013
  • Construction of the extension project of the Bangkok MRT Blue Line underground railway was recently started in 2011. The construction of approximately 5 km long underground tunnel and 4 deep excavations of underground station are considered to be the most important geotechnical works. The pressuremeter was selected as a high-quality in situ testing of the soil to evaluate design parameters for the project. In addition, other field and laboratory tests such as vane shear and $CK_0U$ triaxial tests were included in the investigation programme. This paper aims to present the ground conditions encountered along the MRT Blue Line extension project as well as the site investigation and interpretation techniques with particular focus on the pressuremeter tests. The results are also compared with the pressuremeter investigation from the previous Bangkok MRT project.

Multi-Step Commutation and Control Policies for Matrix Converters

  • Hofmann W.;Ziegler M.
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2001년도 Proceedings ICPE 01 2001 International Conference on Power Electronics
    • /
    • pp.795-802
    • /
    • 2001
  • The commutation and control in matrix converters is more complicated as in voltage source converters. Natural freewheeling paths do not exist and the theoretic absent storage elements result in a direct coupled system of load and line currents as well as voltages. The paper offers an overview about staggered commutation and control policies in matrix converters. Based on the knowledge about load current direction and the signs of the line to line input voltages different multi-step commutation policies were derived. This paper examines the application of that policies in the case of space vector modulation and direct control methods with the focus on the resulting effects to the reference output voltage deviation.

  • PDF

센서리스 벡터 제어를 위한 과도 FEM & 실험을 이용한 선형 유도 전동기의 On-line 관측기시스템의 설계 (The Evaluation of On-line Observer System of Linear Induction Motor Using a Transient FEM & Experiment for Sensorless Vector Control)

  • 전명진;이병두;이중호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2011년도 제42회 하계학술대회
    • /
    • pp.1099-1100
    • /
    • 2011
  • This study deals with the dynamic characteristics analysis of Linear Induction Motor (LIM) using finite element method in which the moving mesh technique is considered. The focus of this paper is to show the appropriate of on-line observer system for position sensorless control of a LIM under the phase asymmetry, saturation and iron loss. Comparisons are given with angle of the observer and that of proposed FEA method of linear induction motor, respectively. The position sensorless control system is realized, and the effective of the observer system is verified by experimental results.

  • PDF

154kV 송전선로용 피뢰기 현장 설치 효과 분석 (A Study on the Effects of Lightning Arrestors Installment on a 154kV Transmission System)

  • 최한열;구성완;민병욱;박순규;이봉희;곽주식
    • 전기학회논문지P
    • /
    • 제58권2호
    • /
    • pp.184-189
    • /
    • 2009
  • Lightning has been identified as one of the leading causes of outages on transmission and distribution systems. As sensitive loads and reliance on electric power increase year by year, it is getting more focus on stable and high quality of power supply. To protect the transmission and distribution line from lightning, the transmission lightning arrester can be the effective facility on the power system. This paper discusses Gapped type Arresters application results by analysing effects of lightning arresters on transmission and distribution line.

원거리 학습 기반 컴퓨터 비젼 실습 사례연구 (A Case Study on Distance Learning Based Computer Vision Laboratory)

  • 이성열
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회 2005년도 추계학술대회 및 정기총회
    • /
    • pp.175-181
    • /
    • 2005
  • This paper describes the development of on-line computer vision laboratories to teach the detailed image processing and pattern recognition techniques. The computer vision laboratories include distant image acquisition method, basic image processing and pattern recognition methods, lens and light, and communication. This study introduces a case study that teaches computer vision in distance learning environment. It shows a schematic of a distant loaming workstation and contents of laboratories with image processing examples. The study focus more on the contents of the vision Labs rather than internet application method. The study proposes the ways to improve the on-line computer vision laboratories and includes the further research perspectives

  • PDF

도시철도 열차편성의 적정성에 관한 연구 - 광역전철 중앙선을 중심으로 - (The Research on the Adequacy of Urban Trainset - focus the Jung-ang Line for Urban -)

  • 정예성;김문홍
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 춘계학술대회 논문집
    • /
    • pp.626-631
    • /
    • 2007
  • With its critical pending task of putting the management into the right track, it is extremely important for the Korea Railroad Corporation to incorporate more reasonable distribution into train consists to cut down its operation costs and attain higher income surplus in the Metropolitan Train Business. Furthermore, for Jung-ang Line soon to be operated without any crew on-board, more adequate train formation looks very indispensable mainly to satisfy transportation demands as well as enhance the passenger safety. This paper will examine the Jung-ang Line with hourly-basis congestions and inter station O/Ds to get the better operation schedules and trainset numbers.

  • PDF

대조립 블럭 용접 자동화를 위한 통합 운영 시스템 (Integrated Operating System For Welding Automation on Assembly Line At Shipyards)

  • 김병수;이시열;김은중;박진형;박영준
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2003년도 추계학술대회
    • /
    • pp.1752-1756
    • /
    • 2003
  • Welding automation in shipbuilding process, especially in the assembly line is considered to be a difficult job because welding part is too huge , various and unstructured for a welding robot to weld the whole part automatically. We developed an automatic welding robot to improve those difficult process. This paper show how to systematically operate the integrated automation system which consists of several robots. We introduce our software and system integration method. Specially we focus that network communication and operating process. The developed system visualizes the operation environment using Open Inventor and communicates with the entire system via TCP/IP and FTP.

  • PDF

고속철도 시운전시험 계측시스템 개발에 관한 연구 (Development of a Measurement System Development for On-Line Testing of High Speed Railway)

  • 김석원;김영국;한영재;박찬경;김진환;백광선
    • 한국철도학회논문집
    • /
    • 제5권3호
    • /
    • pp.158-166
    • /
    • 2002
  • In this paper, we introduce the software and hardware of the measurement system for on-line testing and evaluation of high speed railway. The test items focus on the verification of the performance and acquirement of the technical data of the high speed railway system. The software controls the hardware of the measurement system, perform the analysis and calculation of measurement data and acts as interface between users and the system hardware. For this purpose, three programs a measuring program, a monitoring program and post-processing program are developed. The detailed test scenario is in the process of development to closely follow the process of development and design of the system.

HVDC 선로 내 초전도 한류기와 전력기기들의 복합 구성을 통한 고장 검출에 관한 연구 (The Study on The Complex Composition By SFCL and Power Equipments for Fault Detection in HVDC Line)

  • 김명현;김재철
    • 전기학회논문지
    • /
    • 제67권8호
    • /
    • pp.1113-1118
    • /
    • 2018
  • Protection in HVDC(High Voltage Direct Current) have the very fast velocity of fault detection. Because Fault in HVDC has the fast propagation, large currents, high interruption cost. The focus to velocity caused possibility of errors like a detection error like a high impedance fault. In this paper, Proposed complex composition for get the reliability and velocity. That used SFCL(Super Conducting Fault Current Limiter), Protection Zone and DTS(Distributed Temperature Sensing). The SFCL was detect the fault by quench and DTS&Protection Zone were perceive the detect by variation too. To examine the proposed method, PSCAD/EMTDC simulated. The results of simulation, proposed methods could the detect of fault to whole HVDC line. And that improved the reliability of fault clearing.

서울 지하철 9호선의 개착구조물에 대한 가치공학 평가 (THE VALUE ENGINEERING REVIEW OF THE CUT AND COVER TUNNEL FOR THE SEOUL SUBWAY LINE 9)

  • 송석준;구자갑;김은겸
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 추계학술대회 논문집
    • /
    • pp.957-964
    • /
    • 2004
  • The selected structure for the value engineering review is one section of cut and cover tunnel for Seoul Subway Line 9. The primary focus of the review is on the optimisation of the structures to save cost on the existing Line 9 contracts through variation of the design criteria as it affects the permanent works. This is to be achieved through comparison with design criteria for other selected international subways. Criteria resulting from the review must not compromise public safety and durability for the 100 year design life.

  • PDF