Journal of the Korean Society of Manufacturing Process Engineers
/
v.13
no.1
/
pp.30-38
/
2014
The purpose of this study is to build and manage environment models with line segments from sonar range data on obstacles in unknown and varied environments. The proposed method therefore employs a two-stage data-transform process in order to extract environmental line segments from range data on obstacles. In the first stage, the occupancy grid extracted from the range data is accumulated to form a two-dimensional local histogram grid. In the second stage, a line histogram extracted from a local histogram grid is based on a Hough transform, and matching serves as a means of comparing each of the segments on a global line segments map against the line segments to detect the degree of similarity in the overlap, orientation, and arrangement. Each of these tests is formulated by comparing one of the parameters in the segment representation. After the tests, new line segments can be found at maximum-density cells in the line histogram, and they are composed onto the global line segment map. The proposed technique is demonstrated in experiments in an indoor environment.
Journal of Institute of Control, Robotics and Systems
/
v.1
no.2
/
pp.112-118
/
1995
In designing assembly lines, it is required that the lines should not only meet the demand of the product, but also minimize the assembly cost associated with the line. For such a purpose, numerous research efforts have been made on either the assembly sequence generation or the assembly line balancing. However, the works dealing with both the research problems have been seldom reported in literature. When assembly sequences are generated without consideration of line balancing, additional cost may be incurred, because the sequences may not guarantee the minimum number of workstations. Therefore, it is essential to consider line balancing in the generation of cost-effective assembly sequences. To incorporate the two research problems into one, this paper treats a single-model and deterministic (SMD) assembly line balancing (ALB) problem, and proposes a new method for generating line-balanced robotic assembly sequences by using a simulated annealing. In this method, an energy function is derived in consideration of the satisfaction of assembly constraints, and the minimization of both the assembly cost and the idle time. Then, the energy function is iteratively minimized and occasionally perturbed by the simulated annealing. When no further change in energy occurs, an assembly sequence with consideration of line balancing is finally found. To show the effectiveness of the proposed scheme, a case study for an electrical relay is presented.
Improvement projects has been progressed for railway electrification and double track line in the conventional line as well as high speed line for the high speed and large transportation capability of railway. Especially, many variable operation plans are possible such as interaction between high speed line and conventional line and operation of tilting train due to the electrification of the conventional line. Railway electrification is more energy efficient and environmentally-friendly, but it has some problems such as an enormous initial construction and maintenance costs and electrical accidents. Therefore, the more intensive research will be progressed about railway electrification effectiveness for the continuous electrification project. So, we analyzed railway electrification effectiveness about the energy side using annual operation data of electric car and diesel car. The energy side was divided into energy costs and national energy consumption for analyzing electrification effectiveness about entire line and specific line. We verified advantage of energy costs and national energy consumption in this paper and this result will contribute to the progress of the continuous electrification project and the more efficient operation ways in electrification line
Journal of the Korean Society for Precision Engineering
/
v.30
no.12
/
pp.1335-1340
/
2013
Herein the water film was introduced to the hydrophilic area on the line patterned surface to solve the contradiction caused by surface roughness (high different wettability has advantage to control the droplet but high roughness for that high wettability difference causes obstruction of droplet moving). Thus the droplet on the water film could not be hindered to line direction but restricted to orthogonal direction, effectively. In addition, droplet behaviors according to droplet volume and line thickness were studied. Droplet fell off the line with narrowing the interface between the droplet and the water film on the line. When the droplet fell off the line, the plate angle was designated as a critical plate angle and it used as an indicator of surface capability to control the droplet. As a result critical plate angle increases as droplet volume decreases and line thickness increases.
Park, Min-Woo;Koo, Ja-Kyung;Lim, Jong-Sik;Jeong, Yong-Chae;Ahn, Dal
The Transactions of The Korean Institute of Electrical Engineers
/
v.58
no.12
/
pp.2462-2467
/
2009
This paper proposes a dual band branch line coupler (BLC) using a composite right/left handed (CRLH) transmission line. The existing dual band BLCs with open stubs require hundreds of line impedance for the open stub as the frequency bands approach to each other, so it has been almost impossible to realize them. However in the proposed BLC, a CRLH transmission line replaces the open stub with an extremely high line impedance so that the BLC circuit may be realized even two frequencies are close to each other. As an example, a dual band BLC operating at 1800MHz and 2300MHz (the frequency ratio is 1:1.28) is designed and measured. Open stubs with $560\Omega$ line impedance are replaced by CRLH transmission lines for realizing the dual band BLC. The measured performances prove that the dual band operation is well acceptable and the proposed design method is successful even the ratio between two frequencies is not around two nor more.
The Transactions of the Korean Institute of Electrical Engineers P
/
v.57
no.3
/
pp.275-278
/
2008
It has been issued that the necessity of Live line work for 765kV vertical double circuit six bundle conductors transmission line when the characteristics of transmission line, the composition of T/L and near the T/L circumstances etc. Others are considered. The Barehand method of UHV T/L is extremely dangerous work and especially it is directly related with lineman life so it is very dangerous. It should be performed several technology developments for live-line work on the UHV T/L, that should be considered such as the electrical influence on workers near the T/L, development of live-line facilities, guarantee of safety, the technical rules of live-line work, the safe method of live-line work and etc. In order to maintain the 765kV transmission lines safely by barehand work, first of all, we should know the analysis of electrical safety level test in live-line work at 765kV vertical double circuit six bundle conductors on the suspension string tower type.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.19
no.3
/
pp.99-104
/
2005
This paper describes the measurement and analysis of the basic line constants in PLC(Power Line Communication) in the residential building. An apartment is considered as one of the conventional residences to get the line constants in this paper, Agilent 4263B LCR Meter is used to measure the detailed values each area and the specific results and averaged analysis data are shown in the tables. The measured results are a little bit different from the calculated values using conventional formula due to the line arrangement, neglected factors, complex permittivity, and etc. This paper describes many kinds of lines and wiring figures of domestic construction. It can be utilized with the analyzed line characteristics in frequency domain as a planning reference of PLC.
Journal of Advanced Marine Engineering and Technology
/
v.34
no.6
/
pp.840-845
/
2010
In this paper, short-wavelength transmission line employing periodically arrayed capacitive devices (PACD) structures were developed for application to a development of miniaturized on-chip passive components on GaAs monolithic microwave integrated circuit (MMIC). The transmission line employing PACD structure showed a wavelength much shorter than conventional microstrip line. Concretely, the wavelength of the transmission line employing PACD structure was 8 % of the conventional microstrip line on GaAs substrate at 5GHz. And It was 38% of the microstrip line employing PPGM at 5GHz. It was recognized that the basic characteristics of the transmission line employing PACD structure were investigated for application to the miniaturized passive on-chip components.
The Transactions of the Korea Information Processing Society
/
v.6
no.8
/
pp.2213-2221
/
1999
A line segment has a symmetrical property about its midpoint. With this symmetrical property for a line segment we have proposed a variant of Bresenham's line drawing algorithm that selects two pixels at the same time. It implies that bi-directional line drawing toward the midpoint of line segment from each-end be possible. Besiders, it can select two pixels using only one decision parameter, instead of two different parameters for each pixel. We also present a theoretical proof for the correctness of such a selection. Thus, we can reduce the time of generating line segment by approximately less than 5% compared to the Bresenham's method. Also, our experimental results show that the shape of line segment generated by the proposed approach is the exactly same as that of Bresenham's method.
This paper describes the correction of the protective relay equipped in the dedicated line used for connecting distributed generators (DG) to power grid. The fault current measured in a relaying point might be changed according to the fault conditions. Generally, the fault current of the line to line fault or the line to ground fault at the dedicated line is much higher than the protective set value due to the large fault level. However. when the high impedance fault is occurred in the dedicated line, we may not detect it because its fault level can be lower than the generating capacity of DG. And, the protective relay with conventional set value may generate a trip signal for insertion of DG due to the large transient characteristics of generators. Through the various simulations such as the fault in the dedicated line and the insertion of DG, we show that it would be necessary to modify the protective relay set value for detecting the high impedance fault occurred in the dedicated line and for preventing the mis-operation of protective relay caused by the insertion of DG.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.