This paper analyzes the flashover rate by lightning in Korea distribution system. Because of random characteristics of lightning, the Monte Carlo method is applied to estimate the lightning performance. The magnitude of lightning stroke is based on the curve measured in field. The classification of direct and indirect lightning depends on the striking distance. The striking distance and flashover rate are calculated by using the method based on Central Research Institute of Electric Power Industry(CRIEPI). The distribution system and lightning is modeled by using EMTP and MATLAB, and the accuracy of modeling is discussed. The simulations for the various spacing between two adjacent surge arresters and the various grounding resistance of GW according to the existence of GW are performed and the simulation results are analyzed.
It is important to give lightning warning prior to a cloud-to-ground (CG) discharge within an Area of Concern (AOC) because most of lightning damage and victim are usually occurred by the first lightning in the AOC. The aim of this study is to find the optimal operation conditions of the automated lightning warning systems in order to make the best use of the available data. In this paper, the test-operated results of the automated lightning alert and risk management system (ALARM) based on detections of CG discharge and eletrostatic field and optimized at probability of lightning have been described. It was possible to obtain the following warning performance parameters: probability of detection (POD), false alarm ratio (FAR), probability of lightning (POL) and failure-to-warn rate (FTW). The data obtained from trial operation for 5months were not sufficient but the first analysis of domestic lightning warning was carried out. We have observed that the evaluated statistical results through trial operation depend on the various factors such as analysis methods and criteria, topographical conditions, etc. Also we suggest some methods for improvement of POL and POD including the finding of the optimal electric field threshold level to be used, based on the high values of FAR and FTW found in this work.
Lightning induced faults accounts for more than 66% at the transmission lines of KEPCO. The lightning causes damages to power system equipments including transmission line, the blackout of electricity and the electro-magnetic interference. Because of this reason, we need the real time lightning information for the optimal operation of power system. And, it is required to obtain and accumulate the lightning current parameters for the insulation design. In 2005, KEPRI constructed a lightning detection network, the KLDNet (i.e. Kepco Lightning Detection & Information System) and launched a lightning information service for KEPCO customers. It is intended to provide data service on the operation of transmission lines and collect lightning-related data, which is the most important factor regulating power system design and operation. The new system will replace LPATS, the old detection system, which has been operating since 1995 and is rapidly failing in terms of both detection performance and location accuracy. The purpose of this paper is to explain the work performed and the results of that work in performing a site survey of several locations. The purpose of the site survey is to find locations acceptable for the installation of a lightning location receiver in support of a Lightning detection system(LDS). A restriction was placed on the surveyed locations, as they must belong to the Korea Electric Power Company. This requirement was made to facilitate the communication needs of the LDS network. Total of 15 sites were evaluated as possible LDS sensor sites. Some of the sites were rejected for physical reasons and therefore no electrical testing was performed. Of the 15 sites, total of 10 sites were considered acceptable and 5 sites were rejected for various reason. In this paper, we would like to explain the site survey and detection efficiency for LDS.
Thien, Yee Von;Azis, Norhafiz;Jasni, Jasronita;Kadir, Mohd Zainal Abidin Ab;Yunus, Robiah;Ishak, Mohd Taufiq;Yaakub, Zaini
Journal of Electrical Engineering and Technology
/
제11권1호
/
pp.184-191
/
2016
In recent years, there are a number of studies that have been carried out to explore the alternative for Mineral Oil (MO) as dielectric insulating fluid in transformers due to the increasing tight regulation on safety and environment. Vegetable oils have been identified as suitable candidate since it is biodegradable, non-toxic and high flash/fire points which ensure more in-service safety. Among the types of vegetable oils considered for transformers application are Palm Oil (PO) and Coconut Oil (CO). This paper presents an experimental study on the lightning breakdown voltages of PO and CO under non-uniform electric field based on needle-sphere electrodes configuration at 3 small gap distances. The type of PO used in this study is Refined Bleached and Deodorized Palm Oil (RBDPO) Olein. The main focus of this study is to examine the lightning breakdown performance of RBDPO and CO under different test conditions and assess its suitability as dielectric insulating fluid in transformers. The effect of voltage polarities (positive and negative) and testing methods (rising-voltage, up-and-down and multiple-voltage) were investigated. The data obtained from all tests were analysed by Weibull distribution in order to determine the withstand voltages for each type of oils. It was found that the breakdown voltages of RBDPO and CO are comparable with MO under positive lightning impulse. Under negative lightning impulse, the breakdown voltage of MO is slightly higher than RBDPO and CO. There is no significant effect of testing methods and voltage polarities on lightning breakdown voltages of RBDPO and CO. Based on the statistical analysis, it is found that the breakdown voltages of RBDPO and CO at 1% probability are slightly lower than MO.
Lightning impulse voltage is essential to evaluate the insulation performance of electric power apparatus. Recently international standard(IEC-60) on high voltage measurement techniques are being revised. In the draft of this standard, a new calibration method is introduced and the accuracy of most industrial measuring systems is maintained by means of comparison test against the reference measuring systems. Intercomparison tests of dividers for lightning impulse measurement were carried out by KERI. The shielded resisitive divider with 700kV rating developed by KERI were done comparison test with PTB divider with 300kV rating which have the similar charateristics as that were circulated among the laboratories. This paper reports on the comparison test results with full lightning impulse voltages from 126kV to 240kV. It is demonstrated that KERI are capable of realizing the idea in the revision of the IEC standand, that is, to establish traceability.
국내의 저압수용가 대부분은 한국전력공사의 TN-C접지방식으로부터 공급받고 있으나 부하설비는 TT 접지방식을 위주로 한 전기설비기술기준에 따라 시설되어 있다. 본 연구에서는 정보기술설비를 뇌서지로부터 보호할 수 있는 적절한 전원계통접지방식을 제안하기 위해서 TT, TN계통의 뇌서지에 대한 보호성능을 연구하였다. 그 결과, 뇌서지가 배전계통의 중성선에 입사한 때 TT계통의 기기접지단자와 전원선의 중성점 사이에 높은 전위차가 발생하였으며, 예민한 컴퓨터설비가 손상될 위험성이 있으므로 TT계통은 적합하지 않다. 뇌서지로부터 저압 설비를 보호하기 위해서는 등전위본딩이 중요한 요건이며, TN계통이 중성선을 통하여 입사하는 뇌서지의 저감에 가장 우수하였으며, 수용가 인입구에서의 추가접지도 바람직한 방법이다.
This paper presents the parameters optimization technology for generating the first short stroke lightning current waveform($10/350{\mu}s$) which is necessary for the performance tests of components of lightning protection systems, as required under IEC 62305 and the newly amended IEC 62561. The circuit using the crowbar device specified in IEC 62305 was applied to generate the lightning current waveform. To find the proper parameters of the circuit is not easy because the circuit consists of two parts; circuit I, which relates to the front of current waveform, and circuit II, which relates to the tail. A simulation in PSpise was carried out to find main factors related to the front and tail of $10/350{\mu}s$. The lightning current generator was developed by utilizing the circuit parameters found in the simulation. In the result of experiments, new parameters of the circuits need to be changed because of the difference between the simulation and the experiment results. Using the iterative method, the optimized parameters of the circuits was determined. Also a multistage-type external coil and a damping resistor were proposed to make the efficiency of generation to enhance. According to the result in this paper, an optimized first short stroke lightning current waveform was obtained.
This paper describes the design and fabrication of high frequency ground impedance measuring system for assessment of grounding system for Lightning protection. The ground impedance measuring system has been designed and fabricated which makes it possible to assess the ground impedance by frequency ranges from 100 Hz to 1 MHz. The effective grounding systems having a very low impedance to electromagnetic disturbance such as lightning surges and noises in microelectronics and high-technology branches are strongly required. In order to analyze the dynamic characteristic of grounding system impedances in lightning and surge protection grounding systems, it is highly desirable to assess the ground impedances as a measure of performance of grounding system in which lightning and switching surge currents with fast rise time and high frequency flow. The measuring system is based on the variable frequency power supply and consists of signal circuit part, main control part, data acquisition and processing unit, and voltage and current probe system. The ground impedance measuring system can be used to assess grounding system during occurrence of lightning.
This paper shows the developed new lightning arrester LCM (Leakage Current Measuring device) which is important element of GIS (Gas Insulated Switchgear) Preventive & Diagnostic system and verify its performance though strengthened test standards. The existing lightning arrester LCM was modified to solve measuring errors which happened frequently. At first, we explained the principle of measuring leakage current. Through analyzing some problems which the existing LCM have. we got some improvable items. For the performance verification of the improved LCM, we manufactured prototype LCM which is applied some improvable items such as improving LCM circuit, adding protection circuit, optimizing inner structure of LCM and changing ground design. After then we carried out the performance test. Accredited testing laboratory carried out the performance verification test according to performance test criteria and procedure of reliability test standards, IEC-60225, 61000 and 60068 etc. We confirmed the test results which correspond with the performance test criteria. Also, we confirmed the performance of the improved LCM installed & being operated at G Substation through the immunity test against the normal noise and open/close surge etc.
The seismic evaluation of electric power facilities in the switchyard of nuclear power plants is currently insufficient. In order to evaluate the seismic performance of lightning arrester subjected to four types of earthquake (near- and far-fault earthquakes, NEHRP Site Class A&B and D earthquakes), seismic fragility analysis using maximum likelihood estimation is performed considering various damage states. The comparison of the seismic fragility curves for three main parts of lightning arrester that are the busing, anchor and steel frame, reveals that the failure of lightning arrester is governed by the bushing damage mode such as porcelain cracking.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.