BIM-based Lift Planning Workflow for On-site Assembly in Modular Construction Projects

  • Hu, Songbo;Fang, Yihai;Moehler, Robert
    • 국제학술발표논문집
    • /
    • The 8th International Conference on Construction Engineering and Project Management
    • /
    • pp.63-74
    • /
    • 2020
  • The assembly of modular construction requires a series of thoroughly-considered decisions for crane lifting including the crane model selection, crane location planning, and lift path planning. Traditionally, this decision-making process is empirical and time-consuming, requiring significant human inputs. Recently, research efforts have been dedicated to improving lift planning practices by leveraging cutting-edge technologies such as automated data acquisition, Building Information Modelling (BIM) and computational algorithms. It has been demonstrated that these technologies have advanced lift planning to some degree. However, the advancements tend to be fragmented and isolated. There are two hurdles prevented a systematic improvement of lift planning practices. First, the lack of formalized lift planning workflow, outlining the procedure and necessary information. Secondly, there is also an absence of a shared information environment, enabling storages, updates and the distribution of information to stakeholders in a timely manner. Thus, this paper aims to overcome the hurdles. The study starts with a literature review in combination with document analysis, enabling the initial workflow and information flow. These were contextualised through a series of interviews with Australian practitioners in the crane-related industry, and systematically analysed and schematically validated through an expert panel. Findings included formalized workflow and corresponding information exchanges in a traditional lift planning practice via a Business Process Model and Notation (BPMN). The traditional practice is thus reviewed to identify opportunities for further enhancements. Finally, a BIM-based lift planning workflow is proposed, which integrates the scattered technologies (e.g. BIM and computational algorithms) with the aim of supporting lift planning automation. The resulting framework is setting out procedures that need to be developed and the potential obstacles towards automated lift planning are identified.

  • PDF

초고층 건축공사의 작업원 양중시간 단축을 위한 리프트 카 운행제어 모델 (Operation Control Model of Lift Car to Reduce Worker Lifting Time in Tall Building Construction)

  • 남철우;권재범;김태훈;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.160-161
    • /
    • 2016
  • In tall building construction, lift car for worker lifting is a critical factor for construction productivity. To reduce worker lifting time, existing researches have been conducted on lift car planning. While, research on lift car operation is insufficient. For the efficient reduction of worker lifting time, lift car operation control is needed with lift car planning. Therefore, this research suggests operation control model of lift car to reduce worker lifting time. According to the result of a model test, the operation control model contributes to reasonable reduction of worker lifting time.

  • PDF

마감공사 생산성 향상을 위한 리프트 카 최적배치 모델 (Optimum Layout Model of Lift Car for Improving Productivity in High-rise Building Exterior Finishing Work)

  • 이동민;임현수;김태훈;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.171-172
    • /
    • 2013
  • An operation planning of lift car is crucial in tall building construction especially it's arrangement plans, because it is related with transportation distance of finishing materials affecting construction productivity. Since tall building construction, composed of complicating and huge plane have complex traffic lines of finishing materials, to determine the position of lift car empirically or intuitively has limits. Therefore this paper suggest an optimum layout model of lift car minimizing the transportation distance both at site-level and floor-level using Graph theory and Dijkstra algorithm.

  • PDF

센싱정보를 활용한 초고층 건설용 리프트 최적화 운행 시스템 개발 (Development of Optimum Construction Lift Operation System using Sensing Information for High-rise Building)

  • 신중환;권순욱
    • 한국건설관리학회논문집
    • /
    • 제14권5호
    • /
    • pp.153-163
    • /
    • 2013
  • 건축물이 고층화, 대형화 될수록 수직 양중 계획 및 운영에 관한 중요성이 부각되고 있다. 이에 프로젝트 초기 단계에 실제 모델과 유사한 건설용 리프트 양중계획을 수립하려는 노력이 계속되고 있지만 프로젝트 착수 후 리프트 운행을 컨트롤 할 수 있는 시스템은 부재한 실정이다. 따라서 본 논문에서는 건설용 리프트 운영 효율증대를 위하여 센서를 사용한 리프트 운행 정보를 수집하고 실시간 분석이 가능한 건설용 리프트 최적화 운행 시스템 개발을 실시 및 검증 단계를 수행하여, 양중 효율의 지표가 되는 사용자 대기 시간의 단축을 도모하고 향후 무인 스마트 리프트의 초석이 되는 시스템을 제시하고자 한다.

Agent-based Lift-car Group Operation Optimization Model in High-rise Building Construction

  • Jung, Minhyuk;Park, Moonseo;Lee, Hyun-soo;Hyun, Hosang
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.221-225
    • /
    • 2015
  • To hoist construction workers to their working space is directly related to the productivity of building construction since hoisting tasks are carried out during the working time. In order to reduce hoisting time in the condition that the number of construction lift-cars is limited, various types of the lift-cars group operation plans such as zoning and sky-lobby have been applied. However, previous researches on them cannot be compared in the performance due to their methodological limitation, discrete-event simulation methods, and cannot be find better solution to increase the performance. Therefore, this research proposed the simulation-based optimization model combining the agent-based simulation method to the scatter search optimization methods. Using the proposed model, this paper carried out the comparison analysis on the performance of typical operation plans and also optimize an operation plans by controlling the service range of lift-cars, the size and number of service zones. In this case study, it is verified that better alternatives than typical operation plans can be exists and it is possible to increase the productivity of building construction.

  • PDF

건설현장의 조건을 고려한 최적 타워크레인 선정시스템 (A System for the Selection of the Optimum Tower Cranes(Opt-TC))

  • 호종관;김선국;국동훈
    • 한국건설관리학회논문집
    • /
    • 제8권6호
    • /
    • pp.216-226
    • /
    • 2007
  • 건설프로젝트의 고층화, 대형화 추세에 따라 효율적인 양중계획의 중요성이 부각되고 있다. 양중작업의 대부분을 차지하고 있는 타워크레인의 경우, 양중부하에 적합한 최적 크레인을 선정하고 안전성을 확보하는 것은 생산성뿐만 아니라 프로젝트의 원가, 공기 등의 측면에서 매우 중요하다. 따라서 철저한 사전계획에 따라 적합한 크레인을 선정한 후 안전하게 지지하는 일련의 작업은 전문적인 지식을 필요로 한다. 그러나 전문가의 수가 제한적이며, 이들 전문가의 경우에도 다양한 크레인의 양중성능, 운전특성, 임대가 등에 대하여 상세히 알기보다는 본인들이 주로 사용한 제한적 수의 크레인에 대한 정보를 가지고 있을 뿐이다. 따라서 본 연구는 고층공사의 양중계획단계에서 현장조건에 따른 최적 타워크레인을 선정하고 그 안정성을 쉽고 빠르게 검토할 수 있는 선정시스템을 구축하였다. 본 선정시스템은 크레인 선정시 다양한 기종 및 성능에 대한 정보제공은 물론, 해당 크레인의 기초판과 횡지지에 대한 안정성을 실시간으로 비주얼하게 검토할 수 있어 크레인 선정에 효과적인 도구로 사용될 것으로 예상한다.

공동주택공사의 건설용 리프트를 이용한 양중계획 타당성 분석 (A Feasibility Study on Optimal Lifting Planning in the High-rise Apartment Building Construction)

  • 이준복;한충희
    • 한국건설관리학회논문집
    • /
    • 제9권3호
    • /
    • pp.185-193
    • /
    • 2008
  • 점차 대형화, 고층화되고 있는 공동주택공사에서 작업효율성을 향상시키고자 양중작업의 최적화를 위한 리프트 선정방식의 합리적 절차와 기준이 요구되고 있다. 따라서, 작업효율성 및 경제적 측면에서의 분석을 통하여 양중자재의 종류 및 규격, 건축물의 높이, 공사기간에 따른 건설용 리프트의 합리적 선정 및 운영을 위한 기준을 제시할 필요가 있다. 본 연구의 목적은 고층화 복잡화되고 있는 공동주택건설 현장여건에 따른 효율적 양중계획 및 관리를 위하여 대표적인 양중장비인 저속형과 중속형 리프트의 작업효율성과 경제성의 비교 분석을 통하여 최적의 선정을 위한 기초적 자료를 제시하는 것이다. 본 연구의 주요 결과는 40층 기준으로 중속형 리프트가 저속형에 비해 약 43%의 작업효율이 높은 것으로 분석되었다. 본 연구의 결과는 향후 공사의 용도, 규모, 형태, 조건 등에 알맞은 건설용 리프트 선정 기준/지침/규정을 마련하는 연구의 기초자료로 활용될 것으로 기대된다.

건설공사의 자재관리 효율화를 위한 조달 및 양중시스템 기반구축에 관한 연구 (A Study on Development Framework of Lift-up and Procurement System for Effective Resource Management in the Building Construction)

  • 이형수;윤유상;서상욱
    • 한국건설관리학회논문집
    • /
    • 제5권1호
    • /
    • pp.133-139
    • /
    • 2004
  • 최근 도심지 고층건축공사가 증가하면서 건설자원의 효율적인 관리가 중요시되고 있으나 현재 국내 건설현장에서 건설자재의 공급에 대한 많은 문제점을 가지고 있다. 공정과 연계되지 못한 자재의 조달 및 양중은 현장 내 재고 증가 및 작업지연을 유발하며, 복잡한 정보전달 체계는 관련 작업의 의사결정의 지연의 원인으로 작용하여 결과적으로 공사기간에 절대적인 영향을 미치고 있다. 따라서 공정진행을 고려한 조달 및 양중작업에서 각 공사담당자간의 효율적인 정보전달 체계의 구축은 효과적인 공사수행을 위해 필수적이다. 본 연구에서는 사례조사를 통해 건설자재의 조달 및 양중작업의 문제점을 분석하여 가치흐름분석을 통해 구체적인 낭비요소를 추출한 뒤, 공사참여자간의 의사소통 체계를 구축 및 양중계획 업무흐름 개선방안을 제시하였다. 개선방안은 web을 기반으로 한 조달 및 양중시스템의 전반적인 체계로서 활용될 것이다.

Lifting Load Recording and Management Method of the Lift for Construction Based Sensing Information

  • Taekyu Ko;Joonghwan Shin;Kyuhyup Lee;Soonwook Kwon;Chung-Suk Cho;Suwan Chung;Goeun ,Choi
    • 국제초고층학회논문집
    • /
    • 제11권2호
    • /
    • pp.125-135
    • /
    • 2022
  • While buildings in recent days become taller and larger, many problems occur during the management of construction. Particularly, as the vertical movement of manpower and materials during construction has become longer while the lifting frequency and load increase, the need for a good lifting management practice is also increasing. Therefore, this study presents a real-time lifting performance monitoring system that can store and manage lifting records for construction management. Through review of literature and preceding studies related to construction lift, the concept of lift planning and operation management was understood, leading to the development of a system to monitor lifting operation and performance information. This system enabled quick measurement of the lifting performance during construction phase while responding to changes in the project schedule. To verify this system, a case study was conducted in which the current status and characteristics of the sensing-based lifting performance were derived.

건설공사의 자원 효용성 증대를 위한 조달 및 양중 작업흐름 개선에 관한 연구 (A Study on the Improving Life-up and Procurement Work Flow for Effectiveness of Resources increase in the Building Construction)

  • 이형수;윤유상;서상욱
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.442-445
    • /
    • 2003
  • 최근 도심지 고층건축공사가 증가하면서 건설자원의 효율적인 관리가 중요시되고 있으나 현재 국내 건설현장에서 건설자재의 공급에 대한 많은 문제점을 가지고 있다. 공정과 연계되지 못한 자재의 조달 및 양중은 현장 내 재고 증가 및 작업지연을 유발하면, 복잡한 정보전달 체계는 관련 작업의 의사결정의 지연의 원인으로 작용하여 결과적으로 공사기간에 절대적인 영향을 미치고 있다. 따라서 공정진행을 고려한 조달 및 양중작업에서 각 공사담당자간의 효율적인 정좌전달 체계의 구축은 효과적인 공사수행을 위해 필수적이다. 본 연구에서는 사례조사를 통해 건설자재의 조달 및 양중작업의 문제점을 분석하여 가치흐름분석을 통해 구체적인 낭비요소를 추출한 뒤, 공사참여자간의 의사소통 체계를 구축 및 양중계획 업무흐름 개선방안을 제시하였다. 개선방안은 web을 기반으로 한 조달 및 양중시스템의 전반적인 체계로서 활용될 것이다.

  • PDF