• 제목/요약/키워드: Life-cycle cost

검색결과 1,050건 처리시간 0.028초

건설공사 사후평가결과보고서 표준화 방안 (Standardization for Post-Construction Evaluation Report)

  • 김경훈;이찬규
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.289-290
    • /
    • 2023
  • According to relevant laws, in the case of a construction project with a total construction cost of 30 billion won or more, a post-construction evaluation must be performed after completion. In addition, a post-construction evaluation report must be prepared and entered into the Continuous Acquisition & Life-cycle Support(CALS). As a result of reviewing the currently accumulated post-construction evaluation reports, since the report is not standardized, it is difficult for public project owners to write the report. It also hinders the post-construction evaluation and management center from verifying contents, analyzing data, and deriving meaningful results. In order to improve the convenience of the public owners who must conduct post-construction evaluations and the work efficiency of the center, evaluation factors were standardized and a standard post-construction evaluation report format for road construction was developed in Excel. Through this, the data in the reports will be effectively accumulated, managed, and analyzed, so that meaningful results will be produced and be helpful in future construction work.

  • PDF

그래핀 2wt%를 첨가한 Li1.6Ni0.35Mn0.65O2 Half-Cell의 물질 전 과정 평가 (Material Life Cycle Assessment of Graphene 2wt% Added to Li1.6Ni0.35Mn0.65O2 Half-Cell)

  • 조경원;이영환;한정흠;유제선;홍태환
    • 한국수소및신에너지학회논문집
    • /
    • 제31권1호
    • /
    • pp.132-137
    • /
    • 2020
  • Lithium secondary batteries have become an important power source for portable electronic devices such as cellular phones, laptop computers. Presently, commercialized lithium-ion batteries use a LiCoO2 cathode. However, due to the high cost and environmental problems resulting from cobalt, an intensive search for new electrode materials is being actively conducted. Recently, solid solution LiMn1-xNixO2 have become attractive because of high capacity and enhanced safety at high voltages over 4.5 V. The Li1.6Ni0.35Mn0.65O2 compounds were conventionally prepared by a sol-gel method, which can produce the layered Li-Ni-Mn-O compounds with a high homogeneity. And by adding a graphene 2wt% the first charge-discharge voltage profiles was increased over Li1.6Ni0.35Mn0.65O2 compound. Also, the variation s of the discharge capacities with cycling showed a higher capacity retention rater. In this study, material lifecycle evaluation was performed to analyze the environmental impact characteristics of Li1.6Ni0.35Mn0.65O2 & graphene 2wt% half-cell manufacturing process. The software of material life cycle assessment was Gabi. Through this, environmental impact assessment was performed for each process. The environmental loads induced by Li1.6Ni0.35Mn0.65O2 & graphene 2wt% synthesis process were quantified and analyzed, and the results showed that the amount of power had the greatest impact on the environment.

LCI DB를 활용한 해체공사 환경경제성 평가 (Evaluation of Environmental Economics on Dismantling Projects Using LCI DB)

  • 권석현;김경주;김병수;김상범
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.233-238
    • /
    • 2008
  • 우리나라는 경제규모에 비해 환경오염물질 배출량이 많으며, 이는 에너지 다소비업종의 비중 증가에 따른 것이다. 이에 따라 에너지 다소비업종 중 하나인 건설 관련 공사에 대한 효율적인 에너지 절약이 이루어지지 않는 문제점이 대두되고 있다. 뿐만 아니라 근래 노후화된 건축물의 해체공사가 빈번하며, 이러한 상황에서 좀 더 나은 에너지 절약효과를 갖기 위해서는 건설공사의 전과정(Life Cycle) 중 해체단계에서 발생하는 에너지소비량, 환경오염물질 배출량, 환경비용등에 관한 기본적인 DB 구축 및 활용방안 개발이 필요할 것이다. 이에 본 연구에서는 지식경제부와 환경부에서 제시하는 LCI DB를 활용하여 해체공사시 발생하는 환경오염물질 배출량을 산출하고 환경오염물질별 환경비용을 환산하여 건축물 해체공사에 대한 환경경제성을 평가하고자 하였다. 이를 위해 관련 자료조사, 기존 문헌연구 및 현장조사 등을 실시하였고 이들 수집자료의 분석결과를 바탕으로 사례대상인 건축물의 환경경제성을 평가하였다.

  • PDF

동시개발 소프트웨어 프로세스 모델 (Concurrent Software Development Process Model)

  • 최명복;이상운
    • 한국인터넷방송통신학회논문지
    • /
    • 제11권4호
    • /
    • pp.147-156
    • /
    • 2011
  • 소프트웨어 프로젝트를 개발하는 방법론에는 20여 가지의 개발 프로세스 모델들이 존재한다. 그러나 모든 소프트웨어의 특성을 만족시킬 수 있는 일반화된 하나의 모델이 없는 실정으로 개발조직은 여러 모델들을 적절히 혼합하여 개발될 시스템과 개발팀의 능력에 맞도록 새로운 모델을 개발하여야만 한다. 본 논문에서는 다양한 소프트웨어 개발 상황에 보다 적합할 것으로 판단되는 동시개발 프로세스 모델을 제안한다. 먼저, 개발 요구사항 목록들이 작성되면, 요구사항을 중요도에 따라 20:80 비율로 분할하고, 중요한 20% 요구사항의 요구사항 분석과 아키텍쳐 설계가 완료될 때까지는 순차적으로 수행한다. 20%의 중요 요구사항에 대해 상세설계를 시작하는 시점에서 나머지 80%의 요구사항에 대한 요구사항 분석단계를 동시에 수행하는 개념이다. 동시개발은 타임박스(Timebox) 개념으로 수행되며, 이때 적용되는 순차적, 반복적 & 점진적 또는 Agile 방법들에 따라 각 타임박스에서 개발되는 요구사항의 분할 비율은 차이가 발생한다. 순차적, 반복적 & 점진적 또는 Agile 방법론을 동시개발 개념을 적용한 결과 단일화된 프로세스 모델로 표현할 수 있었다. 제안된 모델은 개발 단계들을 팀 단위로 수행할 경우 개발자원 활용의 비효율성을 크게 줄일 수 있다. 또한, 동시개발 개념을 적용하여 단계들이 중첩되어 수행되므로 개발기간도 크게 단축시키는 장점이 있다. 따라서 제안된 모델은 보다 빠른 시간에 보다 저렴한 비용으로 보다 좋은 품질의 소프트웨어를 개발하여 고객에게 납품할 수 있어 고객을 만족도를 향상시킬 수 있으며, 더불어 소프트웨어 개발 성공률을 높이는데도 기여할 것으로 판단된다.

효율적인 자산관리를 위한 건설정보 이양요건 평가 (Evaluation of Handover Requirements of Construction Information for Efficient Facility Management)

  • 이익행;정영수
    • 한국건설관리학회논문집
    • /
    • 제19권4호
    • /
    • pp.12-20
    • /
    • 2018
  • 최근 시설이 대형화, 복합화, 첨단화됨에 따라 건축물 운영단계에서 수행되는 자산관리 업무의 중요성이 대두되고 있으며, 이에 따라 자산관리 업무의 범위가 확대되고, 요구 정보가 증가하고 있다. 그러나 건설 생애주기 단계 간 업무 중첩, 협업 배제 등으로 인한 비효율적인 정보교환이 이루어지며, 이로 인해 비용 손실이 발생된다. 이러한 생애주기 간 낮은 정보호환성 문제는 전 생애주기 관점의 건설 정보관리를 통해 보완할 수 있다. 각 생애주기 단계 참여자의 건설정보 관리는 발주자의 건설정보 이양요건을 통해 구체화된다. 이에 본 연구는 발주자 관점의 자산관리 개념 정리와 생애주기 간 정보호환성 개선을 목적으로, 자산관리의 유형분류, 자산관리 업무기능, 그리고 건설정보 이양요건 항목의 가치 평가방법론을 제시하였다. 본 연구의 방법론을 이용하여 시공자가 발주자에게 제공하는 '인수인계 항목'을 발주자의 이양요건으로 참조하여 평가하였다. 그 결과 건축물 정보, 도면 등의 순서로 가치 순위가 도출되었다. 본 연구를 통하여 사업 초기단계에서 발주자의 건설정보 이양요건 도출, 그리고 정보이양(Information Handover)의 성과측정을 위한 기초자료로써 활용될 수 있다.

기후변화 대응을 위한 고무보시스템 선정 방안 연구 (Use of a Rubber Dam System in Consideration of Climate Change)

  • 황윤빈;박기학;김서현;강헌;김지호
    • 한국기후변화학회지
    • /
    • 제9권4호
    • /
    • pp.319-324
    • /
    • 2018
  • Due to climate change, water shortages and water-related disasters will be serious. Since the damage and frequency of drought are increasing, the importance of water resource management technology is increasing. In this study, we analyzed the amount of greenhouse gas and the environmental impact caused by the production and operation system technologies of movable weir among various water resource management technologies. The research subjects were air inflatable rubber dams widely used in rivers and upright type rubber dams, which are an improvement on the existing rubber type. Each type of dam was studied at sizes of $1,500H{\times}10,000L\;mm$ and $3,000H{\times}20,000L\;mm$, and the two types and two sizes were compared and analyzed. Using life cycle assessment, we examined the environmental impacts using the amount of electricity required for operation and the discretionary amount required for production. In the '$1,500H{\times}10,000L$' dams, the global warming indexes were $9.35E+04kg\;CO_2-eq$. for upright type and $7.36E+04kg\;CO_2-eq$. for inflatable type. At size of '$3,000H{\times}20,000L$' the global warming indexes were $9.09E+05kg\;CO_2-eq$. for upright type and $1.07E+06kg\;CO_2-eq$. for inflatable type. Analysis of the life cycle environmental impact showed that the environmental impact of the air inflatable rubber dam was reduced by 39.8% at '$1,500H{\times}10,000L$' compared to the larger size. At the larger '$3,000H{\times}20,000L$' size, the upright dam showed a 10.1% smaller impact than the air inflatable rubber dam. Selection of water resource management system should consider climate change, not only management purpose and cost. Additional studies and improvements on rubber dam systems should be made.

VALUATION OF A MULTI-STAGE RAINWATER HARVESTING TANK CONSTRUCTION USING A REAL OPTION APPROACH

  • Byungil Kim;Hyoungkwan Kim;SangHyun Lee
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.386-389
    • /
    • 2013
  • Under climate change and urbanization, rainwater harvesting (RWH) systems are emerging as an alternative source of water supply because of growing concern about water sustainability. RWH systems can satisfy the various watering needs and provide the environmental benefits of lessening the damages from flood, drought, and runoff. The economic success of a RWH system is vitally concerned with the determination of the design capacity of storage tank to be built in the system. The design capacity is determined by the factors of average annual rainfall, period of water scarcity, and water price during the whole life-cycles. Despite the high uncertainties inherent in these factors, the current engineering design of RWH system construction often assumes that storage tanks should be built all at once. This assumption implicitly ignores the managerial flexibility in responds to the future as new information comes out-the right to build storage tanks stage by stage depending on the evolution of demand. This study evaluates the value of a multistage storage tank construction using a real option approach. A case study involving a typical RWH system construction in Jeonju, the Republic of Korea is conducted. The managerial flexibility obtained from the real option perspective allows engineers to develop investment strategies to better cope with the issue of water sustainability.

  • PDF

철근콘크리트골조 BIM기반 수량산출 및 견적 가이드라인 수립 (BIM-Based Quantity Takeoff and Cost Estimation Guidelines for Reinforced Concrete Structures)

  • 주선우;김치경;김시욱;노준오
    • 한국전산구조공학회논문집
    • /
    • 제30권6호
    • /
    • pp.567-576
    • /
    • 2017
  • 본 연구는 BIM 도입 효과를 극대화할 수 있는 현장 적용성 확보에 중점을 둔 철근콘크리트 골조공사의 BIM 견적모델 작성과 BIM기반 견적 업무 프로세스를 표준화한 가이드라인을 제시하는 것을 목적으로 한다. 이를 위하여 기존 지침 및 가이드라인의 BIM 견적모델 작성 범위 및 방식을 고찰하고, 철근콘크리트공사 수량산출 견적 지침 및 기준을 분석하며, 기존 견적 방식과 BIM기반 견적 방식에 대해 비교분석한다. 이를 통하여 BIM기반 견적 업무의 표준 프로세스를 수립하고, 콘크리트/거푸집/철근 견적모델의 작성 및 수량산출 기준을 도출하며, 철근콘크리트공사 BIM기반 수량산출 및 견적 업무의 성과물 목록 및 양식을 제시한다. 본 연구를 통해 작성된 BIM 견적 가이드라인은 BIM기반의 새로운 기술환경에 대한 진입장벽을 낮추고, 견적의 정확성 극대화를 통한 원가절감을 실현하며, BIM 업무와 건설산업의 생산성과 부가가치를 증대시켜, 궁극적으로 건설사업 전 생애주기에서 생산되는 정보를 통합 관리할 수 있는 기반을 구축하고 BIM 생태계를 조성하는데 기여할 것으로 기대한다.

세부 공정별 CO2 배출 분석 및 환경비용 원가배분을 위한 Activity-based LCA 모델의 도입 - 커튼월 공사를 중심으로 - (Implementing Activity-based LCA Model for Carbon Dioxide Emission Analysis and Allocation of Environment Cost)

  • 임지연;이준성;신승우;손정욱
    • 한국건설관리학회논문집
    • /
    • 제13권4호
    • /
    • pp.78-88
    • /
    • 2012
  • 지구 온난화의 주범인 온실가스 배출량을 규제하고자 하는 전 세계적인 기조에 따라 건설 분야에서도 이와 관련하여 다양한 노력이 시도되고 있다. 그 일례로 LCA (Life cycle Assessment) 방법론 도입을 통해 $CO_2$ 배출량을 정량적으로 측정하려는 연구가 활발하게 수행되고 있다. 그러나 일반 제조업에서 수행되고 있는 기존의 LCA 방법론은 다양한 자재의 투입과 복잡한 생산구조를 가지고 있는 건설업에 활용되기에는 많은 한계가 있다. 이에 본 연구는 보다 정확하고 세분화된 환경영향 평가를 도출할 수 있도록, 기존 LCA 방법론에 ABC원가관리방식을 도입한 Activity-based LCA 모델을 제안하였다. 이를 기반으로 대표적 온실가스인 $CO_2$의 주요 배출 Activity와 각각 배출량에 대한 정확한 예측이 가능하도록 하는 모델을 제시하였으며, 실제 시공 중인 건물의 커튼월 시스템 공정을 대상으로 하여 그 유용성을 검증하였다.

겹층구조의 LMO-NCM 복합양극을 통한 고온 사이클 수명개선 연구 (Enhanced Cycle Performance of Bi-layer Structured LMO-NCM Positive Electrode at Elevated Temperature)

  • 유성태;류지헌
    • 전기화학회지
    • /
    • 제25권4호
    • /
    • pp.184-190
    • /
    • 2022
  • 스피넬 구조의 LiMn2O4 (LMO) 및 층상구조의 LiNi0.5Co0.2Mn0.3O2 (NCM)는 리튬이온 이차전지의 양극 활물질로 널리 사용되어 왔다. 가격이 저렴하고 안전성이 우수한 LMO와 용량이 크고 고온 수명이 유리한 NCM 양극 물질은 상호 보완적인 특성을 가지고 있어, 두 활물질을 혼합하여 특히 hybrid electric vehicle (HEV)를 포함한 중대형 전지 등에서 양극으로 채택되어 사용되고 있다. 본 연구에서는 LMO와 NCM으로 구성된 복합전극을 제조할 때, 이를 단순히 혼합하여 제조한 blend 전극과 두 전극을 겹층구조로 제조한 전극의 수명특성을 비교하였다. 두 활물질의 비율을 모두 1:1로 구성하여 제조한 겹층전극은 blend 전극과 유사한 용량 및 동등한 사이클 수명을 지니고 있었다. 그리고, 완전지의 고온 사이클에서는 LMO를 먼저 코팅하고 나서 NCM을 코팅한 LN 전극이 가장 우수하였으며, NCM을 먼저 코팅하고 LMO를 다음에 코팅한 NL 전극은 표면에 LMO가 주로 위치하면서 blend 전극보다 오히려 용량퇴화가 더 빠르게 진행되었다. 또한, LSTA (linear sweep thermmametry) 분석결과에서도 LMO가 주로 전극내부에 위치한 LN 겹층전극의 열적 안정성이 보다 우수하였다.