• Title/Summary/Keyword: Life-cycle cost

Search Result 1,050, Processing Time 0.025 seconds

A Study on Construction of Reverse Engineering Environment in Forth Generation Language (4세대 언어에서의 역공학 환경 구성)

  • Jin, Yeong-Bae;Wang, Chang-Jong
    • The Transactions of the Korea Information Processing Society
    • /
    • v.2 no.4
    • /
    • pp.509-523
    • /
    • 1995
  • With the diversified and enlarged softwares, the issue of software maintenance became more complex and difficult consequently, the cost of software maintenance took up the highest portion in the software life cycle. At the same time, in order to develop or use software for general computers the development environment will be changed to incorporate user-friendly 4GL (Fourth generation Language). Therefore, it is required to take a closer look at the languages such as COBOL, C, FORTRAN, PASCAL which have source code comprised of 4GL and investigate the method of analysis and reuse for program understanding since a lot of research has been done with these languages in program maintenance. The purpose of this paper is to propose reverse engineering tool in 4GL and find an effective way of understanding and maintaining the program by transforming source code comprised of 4GL to meta language and designing and implementing Document Generator, Report Generator, Module Generator, Code Translator for program understanding.

  • PDF

Effectiveness Evaluation of the Bogie Exchange and the Automatic Variable Gauge System using LCC Analysis (LCC 분석을 이용한 대차교환과 자동궤간가변 시스템의 효율성 평가)

  • Chung, Kwang-Woo;An, Joon-Yong;Kim, Chul-Su;Na, Hee-Seung
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.4
    • /
    • pp.334-342
    • /
    • 2012
  • It is connected with various gauges existing in Euro-Asian continents. Such differences impedes the operation seriously as on the contact of railway tracks of different gauge the cargo must be either transshipped or the running assemblies of rail vehicles must be exchanged. Those operations are costly, time-consuming and require extended infrastructure together with very expensive storage and transshipment facilities at border-crossing point. Moreover, those operations extend transportation time considerably. Therefore, effectiveness of railway transportation systems significantly depends on track gauge change 1435/1520mm, which connects with complicated handling-shifting operations. The paper concerns assessment of effectiveness in strategical rail systems with gauge changing. The paper presents short description of transport system with gauge changing and initial assessment of shifting technologies. Method of system assessment comparison based on Life Cycle Cost model is described here as well.

Design of Test-Effort Estimation Model (소프트웨어 시험노력 추정 모델의 설계)

  • Kim, Hankyoung
    • Journal of Internet Computing and Services
    • /
    • v.14 no.1
    • /
    • pp.23-30
    • /
    • 2013
  • Test effort estimated so far is as a by-product of the development effort estimation activity which is based on the FP, UCP, COCOMO model, or calculated data from the project knowledge base which is containing test effort information for the test phase on software development life cycle. In this paper, test effort estimation model and calculating procedures are suggested, which is independent from software development effort estimation model. Generally test efforts is depends on the number and the complexity of test cases, and also maturity of test organization that performs test activities, such as integration test, system test, acceptance test and so on. The estimated results with the suggested test effort estimation model has deviation of 4.7% compare to the corresponding test efforts generated by the development effort estimationprocedures. The suggesting model will be accurate more and more with refinements of coefficients which reflect the technical and environmental maturity level of test organization, and also including the software complexity level of projects.

A Study on Performance Warranty Criteria for Expressway Jointed Concrete Pavements (고속국도 줄눈 콘크리트 포장 성능보증 기준 연구)

  • Yeo, Hyun-Dong;Ahn, Deok-Soon;Suh, Young-Chan;Jeong, Jin-Hoon
    • International Journal of Highway Engineering
    • /
    • v.13 no.3
    • /
    • pp.65-73
    • /
    • 2011
  • Recently, researches to introduce the performance warranty contract are in progress for quality improvement of road pavements. The performance warranty contract is a type of contract in which contractors guarantee to maintain certain level of performance during a period from completion of construction. The contract use in Europe and the U.S is being increased because it has been known to contribute to improvement of structure quality, reduction of life cycle cost, development of construction techniques, and etc. The research on performance indicators, threshold values, and warranty durations is essential to effectively introduce the contract in Korea. In this study, literatures on the performance warranty contract for concrete pavements of the Minnesota, Indiana, and Florida of the U.S. were reviewed. Major distresses influencing the pavement performance were investigated and analyzed in the jointed concrete pavement sections of 21 Korean expressway routes to be compared to the performance indicators, threshold values, and warranty durations of the states. More accurate comparison is expected by investigation in planned sections for a long time.

Evaluation of Composite Mold for Small Composite Propeller (소형 복합재료 프로펠러를 위한 복합재료 몰드 평가)

  • Nhut, Pham Thanh;Yum, Young Jin
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.37 no.2
    • /
    • pp.279-285
    • /
    • 2013
  • The feasibility of substituting a composite mold for an aluminum mold in the fabrication of a small ship propeller was investigated. A small three-blade aluminum propeller was used as a plug for manufacturing the composite mold. A GRPG composite mold and propeller were made from an unsaturated polyester resin, Epovia gelcoat, and woven and mat glass fibers using the compression and vacuum method at room temperature. The hardness and surface roughness and the strength and deformation of the compression and suction molds were experimentally determined. The results were compared with the ISO 484/2 standard and some aluminum alloy materials. The results showed that the deformation of the mold satisfied the tolerance of the thickness of the blade. Some characteristics of the GRPG composite mold were better than those of the aluminum alloy mold (surface smoothness, weight, performance, and cost), and some characteristics were similar (detachment ability and life-cycle). Therefore, the composite mold is considered suitable for the fabrication of a small composite ship propeller.

Effect of Manganese Vanadate Formed on the Surface of Spinel Lithium Manganese Oxide Cathode on High Temperature Cycle Life Performance

  • Kim, Jun-Il;Park, Sun-Min;Roh, Kwang Chul;Lee, Jae-Won
    • Bulletin of the Korean Chemical Society
    • /
    • v.34 no.9
    • /
    • pp.2573-2576
    • /
    • 2013
  • Rate capability and cyclability of $LiMn_2O_4$ should be improved in order to use it as a cathode material of lithium-ion batteries for hybrid-electric-vehicles (HEV). To enhance the rate capability and cyclability of $LiMn_2O_4$, it was coated with $MnV_2O_6$ by a sol-gel method. A $V_2O_5$ sol was prepared by a melt-quenching method and the $LiMn_2O_4$ coated with the sol was heat-treated to obtain the $MnV_2O_6$ coating layer. Crystal structure and morphology of the samples were examined by X-ray diffraction, SEM and TEM. The electrochemical performances, including cyclability at $60^{\circ}C$, and rate capability of the bare and the coated $LiMn_2O_4$ were measured and compared. Overall, $MnV_2O_6$ coating on $LiMn_2O_4$ improves the cyclability at high temperature and rate capability at room temperature at the cost of discharge capacity. The improvement in cyclability at high temperature and the enhanced rate capability is believed to come from the reduced contact between the electrode, and electrolyte and higher electric conductivity of the coating layer. However, a dramatic decrease in discharge capacity would make it impractical to increase the coating amount above 3 wt %.

On Rule-Based Inventory Planning Over New Product Launching Period (신제품 출시 시점의 규칙기반 재고계획에 관한 고찰)

  • Kim, Hyoungtae
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.3
    • /
    • pp.170-179
    • /
    • 2016
  • In this paper we have tackled the outstanding inventory planning problems over new product launching period in a more holistic manner by addressing first the definition of efficient business rules to effectively control and reduce the inventory risks followed by the rigorous explanations on the implementation guide on suggested inventory planning rules. It is not unusual for many companies in the consumer electronics market to make a great effort to reduce the time to launch a new product because the ability to bring out higher performing products in such a short time period greatly increases the probability for them to remain competitive in the high tech market. Among so many newly developed products, those products with new features and technologies appeal to many potential customers while products which fail to win customers by design and prices rapidly disappear in the market. To adapt to this business environment, those companies have been trying to find the answer to minimize the inventory of old products so they can move to next generation products quickly with less obsolete material. In the experimental implementation of our rule-based inventory planning, Company 'S' reduced the inventory cost for the outgoing products as low as 49% of its peak level of its preceding product version in just 5 month after the adoption of rule-based inventory planning process and system. This paper concluded the subject with a suggestion that the best performance of rule-based inventory planning is guaranteed not from one-time campaign of process improvement along with system development but the decision maker's continuing support and attention even without seeing any upcoming business crisis.

The Internalization Strategies for Venture Business (벤처기업의 국제화 전략)

  • Kim, Sung-Ho;Kim, Pan-Jin;Na, Seung-Hwa
    • Journal of Distribution Science
    • /
    • v.7 no.3
    • /
    • pp.101-122
    • /
    • 2009
  • This study examines internationalization determinant factors, motivation and goal of internalization, market entry methods, timing, region, internalization strategy and access method, internationalization performance and success factors, problems and troubles of internalization, and ultimately suggests internalization strategies for domestic venture companies. The study found that interior factors of internationalization determinant factors are characteristics of new firm and technological capabilities while exterior factors include narrow domestic market, industrialization level, competition level, product life cycle, economy of scale, and global network. Motivation was found to include securing and preoccupying market, cost reduction and efficient production through moving of production base, and the necessity of network formation.

  • PDF

A Quantitative Analysis Theory for Reliability of Software (소프트웨어 신뢰성의 정량적 분석 방법론)

  • Cho, Yong-Soon;Youn, Hyun-Sang;Lee, Eun-Seok
    • Journal of KIISE:Computing Practices and Letters
    • /
    • v.15 no.7
    • /
    • pp.500-504
    • /
    • 2009
  • A reliability of software is a type of nonfunctional requirement. Traditionally, a validation of the reliability is processed at the integration phase in software development life cycle. However, it increases the cost and the risk for the development. In this paper, we propose reliability analysis method based on mathematical analytic model at the architecture design phase of the development process as follows. First, we propose the software modeling methodology for reliability analysis using Hierarchical combined Queueing Petri Nets(HQPN). Second, we derive the Markov Reward Model from the HQPN based model. We apply our approach to the video conference system to verify the usefulness of our approach. Our approach supports quantitative evaluation of the reliability.

BIM based Design of Steel Box Girder (STEEL BOX 교량 상부구조의 BIM기반 설계)

  • Lee, Jin-Kyoung;Lee, Heon-Min;You, Jae-Myoung;Shin, Hyun-Mock
    • Journal of KIBIM
    • /
    • v.1 no.2
    • /
    • pp.6-11
    • /
    • 2011
  • In domestic construction industry, there is lack of the communication between planning, design, construction and maintenance. This problem makes the omission of information and the loss of cost. Therefore, the introduction of BIM can be a solution about that. BIM manages all information generated during all life-cycle of a structure and consequently maximizes the efficiency of utilizing information. This is done through 3D information model associated with a three-dimensional(3D) parametric CAD. This study proposes the design process of steel box bridge for structural design work of bridge construction project based on BIM. This process has 3D modeling progress done by using the information decided in design phase. When the subject for the proposed process is superstructure of steel box bridge in construction, the structural calculation sheet can be derived with the structural design process based on BIM.