• Title/Summary/Keyword: Life-cycle cost

Search Result 1,051, Processing Time 0.03 seconds

A Software Estimating Model for Development Period (소프트웨어 개발기간 추정 모델)

  • 이상운
    • Journal of KIISE:Software and Applications
    • /
    • v.31 no.1
    • /
    • pp.20-28
    • /
    • 2004
  • Estimation of software project cost, effort, and duration in the early stage of software development cycle is a difficult and key problem in software engineering. Most of development effort and duration estimation models presented by regression model of simple relation function point vs. effort and effort vs. duration instead of considering developer's productivity. But different project have need for different effort according to developer's productivity if the projects are same software size. Also, different duration takes according to developer's productivity if the projects require the same effort. Therefore, models that take into account of productivity have a limited application in actual development project. This paper presents models that can be estimate the duration according to productivity in order to compensate a shortcoming of the previous models. Propose model that could presume development period by various methods based on productivity and compared models' performance. As a result of performance comparison, an estimating model of development period from software size got simple and most good result. The model gives decision-making information of development duration to project management in the early stage of software life cycle.

Economic Feasibility Study of the Life Extension by Reactor Type of Nuclear Power Plant in Korea (우리나라 원자력발전의 노형을 고려한 계속운전의 경제성 비교 연구)

  • Cho, Sungjin;Kim, Yoon Kyung
    • Environmental and Resource Economics Review
    • /
    • v.27 no.2
    • /
    • pp.261-286
    • /
    • 2018
  • This paper evaluated the economic feasibility of the life extension of Kori unit 1 and Wolsong unit 1 according to the types of the nuclear power plants (NPPs) and the life extension period comparing to the levelized costs of energy (LCOE) of the new NPPs, coal-fired plants (CFPs), and combined cycle gas turbine (CCGTs) which proposed in the $7^{th}$ Basic Plan for Electricity Supply and Demand. The economic feasibility of the life extension of NPPs using LCOE method is affected by the types of NPPs, lifetime extension periods, discount rate, and capacity factor. According to the analysis results, the pressurized light water reactor (PWR) is more economical than the pressurized heavy water reactor (PHWR). Comparing the economical efficiency between the life extension of NPPs and other alternatives, the operation of the PWR for 20 years is more economical than the one of new NPPs and CFPs. However, 20 years of life extension of PHWR is more economical than the CCGTs, but less economical than new NPPs and CFPs. In summary, the 20 years of life extension of the NPPs seems to be more, especially for the PWR, which is more cost effective than other generation alternatives. Therefore, the government policy of the life extension of NPPs need to be a selective approach that simultaneously considers both safety and economics rather than closing all NPPs.

Objective Reduction Approach for Efficient Decision Making of Multi-Objective Optimum Service Life Management (다목적 최적화 기반 구조물 수명관리의 효율적 의사결정을 위한 목적감소 기법의 적용)

  • Kim, Sunyong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.2
    • /
    • pp.254-260
    • /
    • 2017
  • The service life of civil infrastructure needs to be maintained or extended through appropriate inspections and maintenance planning, which results from the optimization process. A multi-objective optimization process can lead to more rational and flexible trade-off solutions rather than a single-objective optimization for the service life management of civil infrastructure. Recent investigations on the service life management of civil infrastructure were generally based on minimizing the life-cycle cost analysis and maximizing the structural performance. Various objectives for service life management have been developed using novel probabilistic concepts and methods over the last few decades. On the other hand, an increase in the number of objectives in a multi-objective optimization problem can lead to difficulties in computational efficiency, visualization, and decision making. These difficulties can be overcome using the objective reduction approach to identify the redundant and essential objectives. As a result, the efficiency in computational efforts, visualization, and decision making can be improved. In this paper, the multi-objective optimization using the objective reduction approach was applied to the service life management of concrete bridges. The results showed that four initial objectives can be reduced by two objectives for the optimal service life management.

A Study on Integrated Logistic Support (통합병참지원에 관한 연구)

  • 나명환;김종걸;이낙영;권영일;홍연웅;전영록
    • Proceedings of the Korean Reliability Society Conference
    • /
    • 2001.06a
    • /
    • pp.277-278
    • /
    • 2001
  • The successful operation of a product In service depends upon the effective provision of logistic support in order to achieve and maintain the required levels of performance and customer satisfaction. Logistic support encompasses the activities and facilities required to maintain a product (hardware and software) in service. Logistic support covers maintenance, manpower and personnel, training, spares, technical documentation and packaging handling, storage and transportation and support facilities.The cost of logistic support is often a major contributor to the Life Cycle Cost (LCC) of a product and increasingly customers are making purchase decisions based on lifecycle cost rather than initial purchase price alone. Logistic support considerations can therefore have a major impact on product sales by ensuring that the product can be easily maintained at a reasonable cost and that all the necessary facilities have been provided to fully support the product in the field so that it meets the required availability. Quantification of support costs allows the manufacturer to estimate the support cost elements and evaluate possible warranty costs. This reduces risk and allows support costs to be set at competitive rates.Integrated Logistic Support (ILS) is a management method by which all the logistic support services required by a customer can be brought together in a structured way and In harmony with a product. In essence the application of ILS:- causes logistic support considerations to be integrated into product design;- develops logistic support arrangements that are consistently related to the design and to each other;- provides the necessary logistic support at the beginning and during customer use at optimum cost.The method by which ILS achieves much of the above is through the application of Logistic Support Analysis (LSA). This is a series of support analysis tasks that are performed throughout the design process in order to ensure that the product can be supported efficiently In accordance with the requirements of the customer.The successful application of ILS will result in a number of customer and supplier benefits. These should include some or all of the following:- greater product uptime;- fewer product modifications due to supportability deficiencies and hence less supplier rework;- better adherence to production schedules in process plants through reduced maintenance, better support;- lower supplier product costs;- Bower customer support costs;- better visibility of support costs;- reduced product LCC;- a better and more saleable product;- Improved safety;- increased overall customer satisfaction;- increased product purchases;- potential for purchase or upgrade of the product sooner through customer savings on support of current product.ILS should be an integral part of the total management process with an on-going improvement activity using monitoring of achieved performance to tailor existing support and influence future design activities. For many years, ILS was predominantly applied to military procurement, primarily using standards generated by the US Government Department of Defense (DoD). The military standards refer to specialized government infrastructures and are too complex for commercial application. The methods and benefits of ILS, however, have potential for much wider application in commercial and civilian use. The concept of ILS is simple and depends on a structured procedure that assures that logistic aspects are fully considered throughout the design and development phases of a product, in close cooperation with the designers. The ability to effectively support the product is given equal weight to performance and is fully considered in relation to its cost.The application of ILS provides improvements in availability, maintenance support and longterm 3ogistic cost savings. Logistic costs are significant through the life of a system and can often amount to many times the initial purchase cost of the system.This study provides guidance on the minimum activities necessary to Implement effective ILS for a wide range of commercial suppliers. The guide supplements IEC60106-4, Guide on maintainability of equipment Part 4: Section Eight maintenance and maintenance support planning, which emphasizes the maintenance aspects of the support requirements and refers to other existing standards where appropriate. The use of Reliability and Maintainability studies is also mentioned in this study, as R&M is an important interface area to ILS.

  • PDF

Performance and Economic Analysis for Rut-resistance Pavement Considering Life Cycle Cost (LCC를 고려한 내유동포장의 공용성 및 경제성 분석에 관한 연구)

  • Do, Myungsik;Han, Daeseok;Yoo, Inkyoon;Lee, Soohyung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.5D
    • /
    • pp.783-796
    • /
    • 2006
  • Rut-resistance pavement is adopted to prevent pavement from plastic deformation since 1998. The objective of this paper is to investigate performance and economic efficiency between rut-resistance pavement and conventional hot-mix asphalt(HMA) on national highway. The pavement deterioration models incorporated in HDM-4 have been calibrated and adapted to local road conditions based on observed pavement rut-depth data. Based on calibration result of HDM-4, the economic evaluation including road agency cost and user cost is performed for 34 road pavement sections. Furthermore, we presented optimal timing for maintenance and performance levels subject to different budget. We found that rut-resistance pavement is performing better than conventional hot-mix asphalt in most road sections. Furthermore, we confirmed that the application of HDM-4 is useful for pavement project planning and evaluation. More investigation is needed to enlarge the scope of the pavement data and to explore more deeply socio-environmental cost and delay cost.

Analysis of the Behavior of Concrete Track on Earthwork Considering the Increase in Train Speed (열차속도 증가를 고려한 토공상 콘크리트궤도의 거동 분석)

  • Kim, Jeong-Il;Ahn, Suk-Jun;Kwon, Jong-Wook;Kim, Jin-Il
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.3214-3219
    • /
    • 2011
  • HONAM High Speed Railway project is under construction with the target to have 350km/h design speed from Songjeong Gwangju City to Osong. The track for the whole section of the line is scheduled to be a concrete track in order to decrease total life cycle cost (LCC) according to the decrease of track destruction. However, the study on the related parts to increase the train speed up to 400km/h is on going in order to strength the competitiveness of high speed railway. On this study, the stress of track has been analyzed according to the concrete track design method of Eisenmann using equivalent depth theory proposed by Odemark for behavior analysis of concrete track on track bed, which is having embankment deformation characteristics by train load. The behavior analysis of track is performed to analyze the stress of track bed layer and track according to the variation of design load and train speed. And also, the characteristics of concrete track have been figured out by analyzing the parameter according to the thickness of track bed layer.

  • PDF

Porous Electrodes with Lower Impedance for Vanadium Redox Flow Batteries

  • Park, Su Mi;Kim, Haekyoung
    • Korean Chemical Engineering Research
    • /
    • v.53 no.5
    • /
    • pp.638-645
    • /
    • 2015
  • Vanadium redox flow batteries (VRFBs) have been investigated for their potential utility as large energy storage systems due to their advantageous performances in terms of long cycle life, high energy efficiency, low cost, and flexible design. Carbon materials are typically used as electrodes in redox reactions and as a liquid electrolyte support. The activities, surface areas, and surface morphologies of porous carbon materials must be optimized to increase the redox flow battery performance. Here, to reduce the resistance in VRFBs, surface-modified carbon felt electrodes were fabricated, and their structural, morphological, and chemical properties were characterized. The surface-modified carbon felt electrode improved the cycling energy efficiencies in the VRFBs, from 65% to 73%, due to the improved wettability with electrolyte. From the results of impedances analysis with proposed fitting model, the electrolyte-coupled polarization in VRFB dramatically decreased upon modification of carbon felt electrode surface. It is also demonstrated that the compressibility of carbon felt electrodes was important to the VRFB polarization, which are concerned with mass transfer polarization. The impedance analysis will be helpful for obtaining better and longer-lived VRFB performances.

A Study on the Economic Analysis of Introducing Battery-Based Eco Bus: Case Study of Daegu City, South Korea (친환경 버스 도입에 따른 경제성 분석에 관한 연구 (대구광역시 중심으로))

  • Bak, Jae Seok;Kim, Sung-Yul;Kim, Dong-Min
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.3
    • /
    • pp.343-351
    • /
    • 2018
  • Renewable energy sources has drawn considerable attention as clean energy sources because of changing public attitudes regarding greenhouse gas and fine dust. Recently, in this respect, the government provides the drivers of electric vehicles with various benefits such as tax reduction, financial incentives and free parking from the public to the private sector. Plug-in electric vehicles are the most common in the private sector. Otherwise, different types of battery-based buses in the public sector are being developed, and there are three main types of charging: plug-in, battery swapping and wireless. Therefore, economic assessment of charging types in each bus route is required in order to facilitate the use of battery-based buses instead of the existing CNG buses. In this paper, net present value(NPV) and B/C ratio of charging types are evaluated in consideration of the bus schedule, the cost of charging station, and the life cycle of battery, etc. per each bus route. In case study, main bus routes in Daegu City are simulated with the proposed evaluation method to validate the eco-bus project.

Analytic Study on the Design Elements for Energy Conservative Green-Home Prototyping (에너지 저감형 그린홈 프로토타이핑을 위한 설계요소 분석 연구)

  • Kim, Jung-Eun;Chang, Seong-Ju;Ha, Mi-Kyoung;Sung, Hae-Yoen;Kim, Kyung-Wan
    • KIEAE Journal
    • /
    • v.11 no.4
    • /
    • pp.63-70
    • /
    • 2011
  • In respond to the global energy crisis and climate change, there have been many ongoing national efforts to develop a sustainable housing prototype followed by "2 million Green Home Project" in Korea. More than 50% of nation's population are currently living in apartment housing thus the country is seriously in need of developing green apartment prototype. In this research, we focused on energy-conservative green apartment design prototype that have both passive components and active systems explored in a systemic design approach. After selecting an existing basic apartment unit, we analyzed and compared statistical data with the simulated annual energy consumption to match these two data sets for validating simulation accuracy performed with TRNSYS package. We performed energy simulations with different passive design factors such as varied insulation thickness, window types and infiltration rates as well as the active design factors including boilers and lighting fixtures to analyze their impacts on the energy performance of the housing unit using TRNSYS software. As a result, we acquired significant energy reduction effect with explored design strategies but the life cycle cost analysis for the final design guidline would need to be performed. In this study, we focused on a systematic comparative energy analysis based on TRNSYS that can improve the design of a green apartment housing.

Strain Monitoring of Strengthened RC Beams with Hybrid Fiber Reinforced Polymer(FRP) Laminates by FBG Sensor

  • Hong, Geon-Ho;Shin, Yeong-Soo;Choi, Eun-Gyu
    • Journal of the Korea Concrete Institute
    • /
    • v.18 no.2 s.92
    • /
    • pp.293-298
    • /
    • 2006
  • The reinforced concrete(RC) structures strengthened with fiber reinforced plastic(FRP) has been accepted by the construction engineering community for rehabilitation. FRP composites can present many advantages like a corrosion resistance, strength-weight ratio, relatively short application time, and cost effectiveness. The beams under design load, however, are cracked and result in degrading the strength. It is difficult to recognize cracks and deflections on the surface of the concrete members retrofitted with FRP through the life cycle. For these reasons, if they result in the effects, which were below the expected strength, we must monitor the state of concrete structures all the time in order to take an appropriate measure. Fiber Bragg Grating(FBG) sensor excel as monitoring of investigating the stress state of the retrofitted beams with FRP. The main objective of this study is to measure strain by experiment and analyze the behavior of RC beams retrofitted with FRP using FBG sensor. The kinds of FRP which were used in research are carbon, glass and improved hybrid FRP(IFRP) that has capacity than any other FRP. Other variables are the length of FRP, the number of sheet.