• 제목/요약/키워드: Life-cycle Engineering

검색결과 2,016건 처리시간 0.028초

교량의 생애주기비용 분석을 위한 비용함수 모델 및 시스템 개발 (Development of System and Cost Function Model for Life Cycle Cost Analysis of Bridge)

  • 박미연;선종완;엄인수;조효남
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2005년도 춘계 학술발표회 논문집
    • /
    • pp.704-711
    • /
    • 2005
  • Recently Life Cycle Cost Analysis for civil infrastructures such as pavements, bridges, and dams has been emphasized However, so far, there are few systems available for life cycle cost analysis of bridges at design stage. Therefore, the objective of this paper is to develop a user-friendly life-cycle cost analysis system for LCC-effective optimal design decision making at design stage. The program is based on the proposed LCC model, formulation, analysis modules and systematic procedure that suit Korean construction conditions. It is expected that the developed system can be effectively utilized for more LCC-effective design of bridges. It is applied to an actual bridge design project in order to demonstrate its effectiveness and applicability.

  • PDF

터빈 블레이드의 구조동역학해석에 근거한 시스템 인자들의 고 사이클 피로수명에 대한 영향도분석 (Study on the Effects of System Parameters on the High Cycle Fatigue Life Based on Structural Dynamic.analysis of a Turbine Blade System)

  • 권성훈;임홍석;유홍희
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2006년도 추계학술대회논문집
    • /
    • pp.89-94
    • /
    • 2006
  • In this paper, the effects of the system parameters on the high cycle fatigue life based on structural dynamic analysis of a turbine blade are investigated. Conventional studies have forcused on the fatigue life of turbine blades with specific system parameters. However, each parameter has statistical deviation because of inhomogeneity of material property, tolerance, and operating conditions. Therefore a methodology that estimates the effects of system parameter on the fatigue lift deviation is demonstrated.

  • PDF

장대 PC교량의 최적 내진설계 및 성능개선을 위한 최소 기대 Life Cycle Cost 모델 (Minimum Expected Life Cycle Cost Model for Optimal Seismic Design and Upgrading of Long Span PC Bridges)

  • 조효남;임종권
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 1999년도 봄 학술발표회 논문집
    • /
    • pp.305-312
    • /
    • 1999
  • This study is intended to propose a systematic and practical life cycle cost(LCC) model for the development of the reliability-based seismic safety and cost-effective performance criteria for design and upgrading of long-span PC bridges. The LCC models consist of five cost functions such as initial cost, repair/replacement cost, human losses, road user cost, and indirect losses of regional economy. The proposed model Is successfully expressed in temrs of Park-Ang damage indices and life cycle damage probability obtained from SMART-DRAIN-2DX which is an existing algorithm for nonlinear time history analysis. The proposed LCC model is successfully applied to a viaduct constructed by PSM, in Seoul. Based on the observations, the proposed systematic procedure for the formulation of LCC model may be useful for the development of the reliability-based seismic safety and cost-effective performance criteria for design and upgrading of long-span PC bridges.

  • PDF

납축전지의 성능 향상을 위한 양극판의 숙성과 그리드에 관한 연구 (A Study on the Curing of Positive Plate and Grid to Improve the Capacity of the Lead-Acid Batteries)

  • 구본근;정순욱
    • 한국응용과학기술학회지
    • /
    • 제25권1호
    • /
    • pp.41-47
    • /
    • 2008
  • This study was conducted to made a grid alloy (Pb-Ca-Sn-Al) which has a temporary composition ratio in order to improve the efficiency of lead acid batteries. The positive activity material made a 3BS(tri-basic lead sulfate; $3PbO{\cdot}PbSO_4{\cdot}H_2O$) by a low temperature curing and it evaluates the plate efficiency through the life cycle testing. The initial current capacity of low temperature curing plate was excellent but the life cycle was not good (S1). As for the S2 plate, however, the initial current capacity and the life cycle were superior.

Implementing an Application Tool of Life Cycle Cost Analysis (LCCA) for Highway Maintenance and Rehabilitation in California, USA

  • Kim, Changmo;Lee, Eul-Bum
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.376-380
    • /
    • 2015
  • Life-Cycle Cost Analysis (LCCA) for highway projects is known as an effective analytical technique that uses economic principles to evaluate long-term alternative investment options, especially for comparing the values of alternative pavement design structures and construction strategies. In the Unites States, the 2012 Moving Ahead for Progress in the 21st Century Act (MAP-21) amended the United States Code to mandate that the United States Government Accountability Office (GOA) conducts a study of the best practices for calculating life-cycle costs and benefits for the federally funded highway projects in 2013. The RealCost 2.5CA program was developed and adapted as an official LCCA tool to comply with regulatory requirements for California state highway projects in 2013. Utilization of this California-customized LCCA software helps Caltrans to achieve substantial economic benefits (agency cost and road user cost savings) for highway projects. Proper implementation of LCCA for roadway construction and rehabilitation would deliver noticeable savings of agency's roadway maintenance cost especially in developing counties where financial difficulties exist.

  • PDF

Inconel 617의 저주기피로 수명 예측 (Prediction of low cycle fatigue life for Inconel 617)

  • 김기광;김덕회;김재훈;이영신;박원식
    • 한국정밀공학회:학술대회논문집
    • /
    • 한국정밀공학회 2005년도 추계학술대회 논문집
    • /
    • pp.612-615
    • /
    • 2005
  • Low cycle fatigue tests are performed on the Incollel 617 that be used fur a hot gas casing. The relation between strain energy density and numbers of cycles to failure is examined in order to predict the low cycle fatigue life of Inconel 617. The life predicted by the strain energy method is found to coincide with experimental data and results obtained from the Coffin-Mansun method. Also the cyclic behavior of Inconel 617 is characterized by cyclic hardening with increasing number of cycle at room temperature.

  • PDF

The Effects of Slab Size on Pavement Life Cycle Cost

  • Parsons, Timothy A.;Hall, Jim W.Jr
    • 한국도로학회논문집
    • /
    • 제8권2호
    • /
    • pp.49-54
    • /
    • 2006
  • The purpose of this study was to determine the effect of expansion joint spacing (slab size) on the life cycle costs of owning Portland Cement Concrete (PCC) airfield pavements. Previous research has shown that slab size has a statistically significant impact on pavement performance. A probabilistic life cycle cost analysis was performed to determine if the effect of slab size on pavement performance would affect the total cost of ownership of PCC pavements. Data from 48 Pavement Condition Index (PCI) inspections of military and civilian airfields were used to develop probability-of-distress-by-condition curves, which were then used to develop probabilistic cost-of-repair-by-condition curves. A present worth life cycle cost analysis was then performed for various slab sizes, using construction costs, rehabilitation costs, and maintenance costs. Maintenance costs were determined by assuming a condition deterioration rate appropriate for each slab size and applying the cost-by-condition curves. The probabilistic cost-of-repair-by-condition curves indicated that smaller slabs are more expensive to repair on a unit cost basis. Life cycle cost analysis showed that larger slabs have a higher total cost of ownership than smaller slabs due to a faster rate of deterioration.

  • PDF

RELIABILITY-BASED COMPONENT DETERIORATION MODEL FOR BRIDGE LIFE-CYCLE COST ANALYSIS

  • Rong-yau Huang;Wen-zheng Hsu
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.386-397
    • /
    • 2007
  • One major development in bridge life cycle cost analysis (LCCA) in recent years is to develop deterioration model for bridge components so that the times of repair/replacement throughout a component's life span can be properly determined. Taiwan also developed her own bridge LCCA model in 2003, integrating with the bridge inspection database in the local bridge management system (T-BMS). Under the framework of the local LCCA model, this study employs the reliability method in developing a deterioration model of bridge components. A component deteriorates through time in its reliability, which represents the probability of a component's condition index exceeds a user specified threshold. Model assumptions and rationale are described in the paper. The steps for applying the developed model are explained in detail. Results and findings are reported.

  • PDF

Fundamental Investigation of Knowledge Management System for a Plant

  • Seo-kyung Won;Ji-Yune Soh;Junbok Lee ;Choong-hee Han
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.375-380
    • /
    • 2009
  • Gas & Oil plant construction projects are increasing recently all over oil-producing countries. An EPC (Engineering, Procurement and Construction) company, which participates in the plant projects, should possess pertinent engineering licenses and EPC management skills to create high added-value. Nonetheless, there exist various risks involved in the EPC life cycle process due to such characteristics of construction projects as long duration of construction time and complicated processes along with the procured goods or services subjected to various logistics. The objective of this paper is to analyze the overall EPC life cycle for proper process and to examine various information and document. Additionally, the principal data for the analysis of the EPC process are derived from personal interviews with experts and specialty contractors of the plant projects. The results of this study would be widely used as a guide for efficient and effective management of overseas gas plant projects.

  • PDF

기술제안입찰에서의 계적인 생애주기비용 평가를 위한 개선방안 (A Measure for Improving the Systematic Evaluation of the Life Cycle Cost in Technical Proposal Tendering)

  • 손명진;현창택
    • 한국건설관리학회논문집
    • /
    • 제13권6호
    • /
    • pp.71-83
    • /
    • 2012
  • 최근 행정중심복합도시와 혁신도시, 미군기지 이전사업을 중심으로 건설공사에서의 비용절감 및 품질향상, 기술개발 및 가치구현을 목적으로 기술제안입찰방식 적용이 확대되고 있다. 이로 인하여 기술제안입찰에서 중요 평가항목 중의 하나인 '생애주기비용 개선방안'에 대한 관심이 높아지고 있으며, 특히 건축물 생애주기비용에 대한 신뢰성 확보 및 객관적인 평가를 수행할 수 있는 방안을 마련하기 위해 노력하고 있다. 하지만 기술제안입찰에서의 생애주기비용 개선방안에 대한 적용사례의 부족, 원안에 대한 초기공사비의 왜곡, 불변가와 현재가의 혼재, 입찰업체간 산정기준의 모호성, 용어의 불명확성, 작성양식의 미흡 등의 문제점이 지적되고 있는 실정이다. 따라서 본 연구에서는 기술제안입찰에서의 평가항목 중 생애주기비용 개선방안에 대한 참여업체별 변별력을 확보하고 체계적인 생애주기비용 평가를 수행하기 위하여 작성지침 및 분석기준, 작성양식에 대한 개선방안을 제시하였다.