• 제목/요약/키워드: Life-cycle (EPC)

검색결과 13건 처리시간 0.025초

Fundamental Investigation of Knowledge Management System for a Plant

  • Seo-kyung Won;Ji-Yune Soh;Junbok Lee ;Choong-hee Han
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.375-380
    • /
    • 2009
  • Gas & Oil plant construction projects are increasing recently all over oil-producing countries. An EPC (Engineering, Procurement and Construction) company, which participates in the plant projects, should possess pertinent engineering licenses and EPC management skills to create high added-value. Nonetheless, there exist various risks involved in the EPC life cycle process due to such characteristics of construction projects as long duration of construction time and complicated processes along with the procured goods or services subjected to various logistics. The objective of this paper is to analyze the overall EPC life cycle for proper process and to examine various information and document. Additionally, the principal data for the analysis of the EPC process are derived from personal interviews with experts and specialty contractors of the plant projects. The results of this study would be widely used as a guide for efficient and effective management of overseas gas plant projects.

  • PDF

Steel Plant Construction (EPC) Project Case Study : Forensic Lessons-learned Analysis and Systems Engineering Improvement Recommendation

  • Kyung-Bae Jin;Young-Ho Kim;Eul-Bum Lee;Suk-Hwan Seo
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.145-150
    • /
    • 2013
  • As a recent global trend, the majority of mega-size plant projects are delivered through EPC (Engineering, Procurement and Construction) contracts, where a single contract is awarded for engineering, procurement, and construction. Under this contracting mechanism, it is challenging for contractors to carry out the projects under traditional project management processes used in design-bid-build projects. A new EPC Plant, the POSCO Special Steel Plant in Changwon, was built successfully at the beginning of 2012 and it is currently in full-scale production. The project has encountered a number of major difficulties however, with some technical and managerial issues through its development process. As summarized in this paper, the authors (as project participants with the contractor) investigated it as a post construction analysis and recorded the Lessons-learned for future project management improvement.

  • PDF

Protection of rainbow trout (Oncorhynchus mykiss) against infectious hematopoietic necrosis virus (IHNV) by immunization with G gene's cytoplasmic and transmembrane region-deleted single-cycle IHNV

  • Jae Young, Kim;Jun Soung, Kwak;Hyoung Jun, Kim;Ki Hong, Kim
    • 한국어병학회지
    • /
    • 제35권2호
    • /
    • pp.157-165
    • /
    • 2022
  • Single-cycle viruses generated by reverse genetic technology are replication-incompetent viruses due to the elimination of gene(s) essential for viral replication, which provides a way to overcome the safety problem in attenuated viruses. Infectious hematopoietic necrosis virus (IHNV) is a major pathogen causing severe damage in cultured salmonid species. In the present study, we generated a single-cycle IHNV lacking the transmembrane and cytoplasmic domain in the G gene (rIHNV-GΔTM) and evaluated the prophylactic potential of rIHNV-GΔTM in rainbow trout (Oncorhynchus mykiss). To produce rIHNV-GΔTM, IHNV G protein-expressing Epithelioma papulosum cyprini (EPC) cells were established. However, as the efficiency of rIHNV-GΔTM production in EPC cell clones was not high, fish were immunized with a low-tittered single-cycle virus (1.5 × 102 PFU/fish). Despite the low dose, the single-cycle IHNV induced significant protection in rainbow trout against IHNV infection, suggesting high immunogenicity of rIHNV-GΔTM. No significant difference in serum ELISA titers against IHNV between the rIHNV-GΔTM immunized group and the control group suggests that the immunized dose of rIHNV-GΔTM might be too low to induce significant humoral adaptive immune responses in rainbow trout. The involvement of adaptive cellular immunity or innate immunity in the present significantly higher protection by the immunization with rIHNV-GΔTM should be further investigated to know the protection mechanism.

Development of Review Processes and Tools for Liquidated Damages for EPC/Turnkey Project: Contractor's Perspective

  • Hahn, Ki Jeong;Lee, Eul-Bum;Kim, Young Ho
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.718-719
    • /
    • 2015
  • As a recent global trend, the majority of plant projects are delivered through EPC or EPC-turnkey contracts, where a contractor's liability is more complicated because of the mega size scale and financing method. Previous researches have been lacking a practical usability for project members for liabilities of contracts. Those were focused on solving the claims or schedule calculation issues only. The objective of the present study was to develop a validation process for LDs (liquidated damages) in contractor's liabilities with various case studies and expert judgments. As summarized in this paper, the processes and tools were developed with project life cycle process. The project preparation phase includes 3 step check lists to determine the Go or No-go for projects. In progress phase, contractors should focus on the response strategies for claims with liabilities. The study concludes that those developed processes and tools will help to manage risk of LDs for the contractors in the overseas projects.

  • PDF

AWP (Advanced Work Packaging) 체계 도입을 위한 국내건설기업의 필요 조직역량 도출 연구 (Identifying the Organizational Competency Factor for Implementing AWP (Advanced Work Packaging) in perspective of Korean EPC Contractor)

  • 문수환;윤성민;박찬영;조태상;한승헌
    • 한국건설관리학회논문집
    • /
    • 제21권3호
    • /
    • pp.20-27
    • /
    • 2020
  • 플랜트 프로젝트의 성과 향상을 위해 EPC 업체들은 통합적 관점에서의 프로젝트 사업관리 방식 개발에 대해 지속적인 관심을 보이고 있다. 특히, Advanced Work Packaging (AWP)는 프로젝트 생애주기 관점에서 기존의 "작업체계" 개념을 통합하여 프로젝트 수행 방식을 일부 재조정하는 방식으로 사업성과 개선을 위한 방법으로 제시되고 있다. 그러나 아직까지 국내 EPC 업체들은 AWP 도입의 초기 단계로, AWP를 수행하기 위한 구체적인 연구가 부족한 실정이다. 이에 따라, 본 연구에서는 AWP 체계의 도입을 위해 EPC 기업에서 갖추어야 하는 조직역량 도출을 목표로 하였다. 문헌 고찰과 현직자 인터뷰를 통해 AWP 도입시 발생할 것으로 예측되는 주요 리스크를 도출하였으며, 맥킨지 7S 모델 체계에 맞추어 이를 방지하기 위한 29개의 조직역량 항목을 도출하였다. 이후 AWP 전문가 5인의 검증 과정에서 추가적으로 도출된 8개의 조직역량 항목을 반영하여 최종적으로 효과적인 AWP 도입을 위해 필요한 조직역량 37개를 도출할 수 있었다.

Issues of New Technological Trends in Nuclear Power Plant (NPPs) for Standardized Breakdown Structure

  • Gebremichael, Dagem D.;Lee, Yunsub;Jung, Youngsoo
    • 국제학술발표논문집
    • /
    • The 8th International Conference on Construction Engineering and Project Management
    • /
    • pp.353-358
    • /
    • 2020
  • Recent efforts to develop a common standard for nuclear power plants (NPPs) with the aim of creating (1) a digital environment for a better understanding of NPPs life-cycle management aspect and (2) engineering data interoperability by using existing standards among different unspecified project participants (e.g., owners/operators, engineers, contractors, equipment suppliers) during plants' life cycle process (EPC, O&M, and decommissioning). In order to meet this goal, there is a need for formulating a standardized high-level physical breakdown structure (PBS) for NPPs project management office (PMO). However, high-level PBS must be comprehensive enough and able to represent the different types of plants and the new trends of technologies in the industry. This has triggered the need for addressing the issues of the recent operational NPPs and future technologies' ramification for evaluating the changes in the NPPs physical components in terms of structure, system, and component (SSC) configuration. In this context, this ongoing study examines the recent conventional NPPs and technological trends in the development of future NPPs facilities. New reactor models regarding the overlap of variant issues of nuclear technology were explored. Finally, issues on PBS for project management are explored by the examination of the configuration of NPPs primary system. The primary systems' configuration of different reactor models is assessed in order to clarify the need for analyzing the new trends in nuclear technology and to formulate a common high-level PBS. Findings and implications are discussed for further studies.

  • PDF

Front End Engineering and Design (FEED) for Project Management of Thermal Power Plant Construction

  • KIM, Namjoon;JUNG, Youngsoo
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.415-419
    • /
    • 2015
  • Engineering is a value-adding process applying knowledge and skills in the construction industry that includes the planning, feasibility study, project management (PM), front end engineering and design (FEED), detail design, procurement, construction, supervision, and operation. Among these engineering activities, FEED is defined as a comprehensive design practice in the early design phase focused on conceptual design and basic design. It is a particularly influencing area that determines the competitiveness of procurement and construction capability of construction firms (KNIN 2013). Nevertheless, previous studies in FEED have been limited to the design process, deliverable, or particular management technique (e.g. system engineering, collaboration, information etc.). In this context, the purpose of this study is to propose a comprehensive FEED business process structure for project management of thermal power plant construction projects encompassing the entire project life cycle. And an assessment methodology for FEED functions was developed. It is expected that the proposed structure of FEED functions and FEED evaluation methodology will contribute to improvement of competitive capability of engineering, procurement, and construction (EPC) companies.

  • PDF

유지보수 및 자산관리를 위한 시공단계 정보 활용에 관한 연구 (A Study on Establishing Facility and Asset Information from Construction Phase)

  • 배영민;곽길종;김수정;김재준
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.529-532
    • /
    • 2003
  • 유지보수 단계는 설계단계에서 계획되고 시공단계에서 확보된 자산적 가치를 지속하는 건물수명주기상의 한 단계이다. 건물의 대형화 및 기능의 복합화 추세가 확대되면서 유지보수 단계의 중요성은 성능관리, 안전관리, 자산관리 등의 다양한 관점에서 더욱 증대되고 있다. 최근 들어 체계적인 시설물의 정보관리 및 정보기술의 적용을 통해 이러한 관리 목적의 달성과 유지보수에 관련한 제반 운영활동 및 비용의 효율성을 확보하려는 노력이 전개되고 있다. 건물의 유지 보수에 있어서 핵심이 되는 기본정보는 준공된 시설물을 구성하는 세부요소에 대한 정보로, 설계 및 시공단계에서 생성된 정보를 적절히 변환함으로써 구축될 수 있다. 그러나 현재 유지보수 단계에서 활용되는 정보시스템에서는 건물 및 시설에 대한 정보가 선행단계와는 단절되어 새로이 생성, 구축될 수 있다. 또한 자산관리 관점에서 볼 때 시설물자산을 구성하는 구조체, 설비 등의 자산내역은 그 가치의 변동이 상이하므로, 이를 합리적으로 반영하기 위해서는 시공단계의 비용 또는 가격을 정확하게 배부, 반영하여 자산내역의 최초 가액을 산정할 필요가 있다. 본 연구는 자산관리의 측면 및 수명주기에 따른 정보의 연계성 확보측면에서 시공 단계에서 발생하는 시설물의 세부요소 및 비용정보를 유지 보수 단계에서 활용할 수 있는 정보모델을 개발, 제시하고자 한다.

  • PDF

시스템 다이내믹스 기반 해양구조물 분리시스템의 설계검증 방법에 관한 연구 (Design Verification Method of Offshore Separation Systems Based on System Dynamics)

  • 황존규;고재용;이동건;박본영
    • 해양환경안전학회지
    • /
    • 제26권6호
    • /
    • pp.715-722
    • /
    • 2020
  • 본 연구는 시스템 다이내믹스를 기반으로 해양구조물 분리시스템(Separation system)의 설계검증 방법을 제안하였다. 해양구조물 분리시스템은 부가가치 측면에서 EPC 프로젝트의 성공 여부를 결정할 수 있는 상부구조(Topsides)의 가장 중요한 시스템 중 하나이다. 그럼에도 불구하고, 설계검증에 대한 지금까지의 실태는 설계 작업의 프로세스 진행이나 도면작성 및 제공에 국한되어 있어 기본설계 단계에서 설계검증의 미흡으로 인하여 계약 후 잦은 설계변경에 의한 기업손실이 발생되어 왔다. 이러한 맥락에서 본 연구의 목적은 해양구조물의 전체 프로젝트 수행 기간에 성공적인 사업수행을 도모하고자 설계검증 모델을 구축하여 적용하도록 하였다. 제안된 설계검증 방법은 상세 설계의 효과적인 실행뿐만 아니라 초기설계 단계에서 기술적 오류나 불일치 사항을 미리 찾아냄으로써 해양구조물의 엔지니어링, 조달 및 건조에 대한 경쟁력을 향상시키는데 기여 할 것으로 예상한다. 본 연구에서는 먼저 건조한 실적선 자료를 바탕으로 설계검증을 수행하여 FPSO 분리시스템에 적용하고 ISO 15288 국제 표준을 준수하였다. 결과적으로, 제안된 설계검증 방법이 해양구조물의 FEED 검증 프로세스에 적용될 수 있으며, 향후 해양 프로젝트의 성공적인 수행에 의한 이익창출을 도모할 수 있을 것이다. 또한, 해양구조물 건조 시 설계변경에 의한 막대한 손실을 최소화 할 수 있을 것으로 기대한다.

사업관리 관점의 FEED 업무 프로세스 구조 및 항목 평가 - 화력발전소를 중심으로 - (Assessment of FEED Structure and Functions for Project Management of Thermal Power Plant Construction)

  • 김남준;정영수;양명덕
    • 한국건설관리학회논문집
    • /
    • 제16권5호
    • /
    • pp.65-76
    • /
    • 2015
  • 해외 플랜트 사업에서의 고부가가치를 창출하기 위해서는 기획 타당성조사, 프로젝트종합관리, FEED 및 기본설계 등 분야의 기술경쟁력 강화가 시급하다. 특히, FEED 업무는 프로젝트 전체에 대한 영향력이 절대적이고, 또한 기자재 및 패키지 산업의 경쟁력 강화에도 결정적 역할을 한다. 그럼에도 불구하고, FEED 관련 선행연구들은 설계업무 중심의 프로세스 및 성과물을 위한 연구가 대부분이며, 프로젝트 전체에 영향을 미치는 관리적 관점의 FEED 업무에 대한 연구는 미흡한 실정이다. 따라서 본 연구에서는 발전플랜트 중 화력발전소를 대상으로 사업관리 관점의 FEED 업무 프로세스 구조 및 항목을 제안하였다. 도출된 FEED 관리 업무는 3개의 레벨로 나누어진 계층적 구조를 가지고 있으며, 업무 항목에 대한 전문가 검증을 실시하였다. 또한 FEED 관리 업무에 대한 평가지표별 평가를 통해 결과를 분석한 결과 설계 중심의 업무들은 역량이 높지만 중요도가 높은 관리적 관점의 FEED 업무들의 역량은 부족한 것으로 나타났다. 그러므로 본 연구에서 제안한 FEED 관리업무 프로세스 구조는 FEED 역량 강화를 위한 가이드라인이 될 것이라 기대한다.