• Title/Summary/Keyword: Life safety requirements

Search Result 164, Processing Time 0.029 seconds

A study on the efficient management of the railway safety regulation which uses system engineering tools. (SE도구를 이용한 철도안전규정의 효율적 관리 방안)

  • Hong Seon-Ho;Wang Jong-Bae;Cho Yuen-Ok;Hong Yong-Ki;Park Ok-Jung
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.250-257
    • /
    • 2004
  • Typical railway systems are composed of the various sub-systems, such as tracks, structures, electricity supplying systems, signal systems and vehicles. The roles of the sub-systems are clarified in the railway regulations in terms of their whole life cycle, as like design, operation and disposal stages. The regulations express clearly the basic specifications and requirements that need to accomplish their own performance and also state the standards and procedures for the normal operations and emergency conditions. In this paper the current railway regulation systems are analyzed and average revision periods are presented as the results of the analysis on revision history of railway safety regulations. This paper also presents the requirements for national safety standards based on Railway Safety Act and the necessity of application of system computer aided system engineering (CASE) tool for the improvement of legislation tasks. By exemplifying the cases of high speed rail system and Japanese cases that had developed softwares for supporing regulation revision management, the methodologies was studied for reconstruction of railway safety regulation system. As the results, it was presented such as the considerations for actual implementation and systematic safety regulation revision.

  • PDF

Fire & Life Safety Challenges in Sustainable Tall Building Design

  • Li, Fang;Reiss, Martin
    • International Journal of High-Rise Buildings
    • /
    • v.2 no.1
    • /
    • pp.31-38
    • /
    • 2013
  • The movement towards sustainable building design can result in unique fire protection challenges and concerns, especially with super tall buildings in relationship to traditional prescriptive code compliance. Different countries haves different code requirements as well as local best practices and may cause conflict with the design features when designing green buildings. These include, but not limited to green roofs, sprinkler water quality and testing, fire department access and areas of refuge with direct or indirect impact by the perspective code compliance. The solutions to these prescriptive code challenges and fire safety concerns can range from simple alternatives to more detailed engineering performance-based design analyses with good solid practice.

Development of a framework for engineering RAMS into rolling stock through life cycle in the operator perspective (철도차량의 개발 및 운용을 위한 RAMS 관리 시스템 개발)

  • Park, Mun-Gyu;An, Min
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.2179-2194
    • /
    • 2010
  • RAMS is becoming increasingly important in the decision making process for the rolling stock projects in order to improve competitiveness by reducing system life cycle cost while improving reliability, availability, maintainability and safety. In order to apply and manage RAMS of rolling stock systems effectively in the operator perspective, it is essential to integrate and control RAMS systematically from the early stage of rolling stock projects. RAMS management is to implement a RAMS system into rolling stock projects in terms of a rolling stock operator, which presents the strategic directions of RAMS policy, objectives, requirements, control, analysis, measurement and improvement throughout life cycle of rolling stock projects. This article presents a new framework of RAMS management that provides an effective and efficient way for managing RAMS in rolling stock systems in the railway industry.

  • PDF

A Systems Engineering Approach to Real-Time Data Communication Network for the APR1400

  • Ibrahim, Ahmad Salah;Jung, Jae-cheon
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.13 no.2
    • /
    • pp.9-17
    • /
    • 2017
  • Concept development of a real-time Field Programmable Gate Array (FPGA)-based switched Ethernet data communication network for the Man-Machine Interface System (MMIS) is presented in this paper. The proposed design discussed in this research is based on the systems engineering (SE) approach. The design methodology is effectively developed by defining the concept development stage of the life-cycle model consisting of three successive phases, which are developed and discussed: needs analysis; concept exploration; and concept definition. This life-cycle model is used to develop an FPGA-based time-triggered Ethernet (TTE) switched data communication network for the non-safety division of MMIS system to provide real-time data transfer from the safety control systems to the non-safety division of MMIS and between the non-safety systems including control, monitoring, and information display systems. The original IEEE standard 802.3 Ethernet networks were not typically designed or implemented for providing real-time data transmission, however implementing a network that provides both real-time and on-demand data transmission is achievable using the real-time Ethernet technology. To develop the design effectively, context diagrams are implied. Conformance to the stakeholders needs, system requirements, and relevant codes and standards together with utilizing the TTE technology are used to analyze, synthesize, and develop the MMIS non-safety data communication network of the APR1400 nuclear power plant.

Determination of the CTQ of Cell Phone Using Kano model & AHP (Kano Model과 AHP를 활용한 휴대폰의 CTQ 선정에 관한 연구)

  • Cho, Tae-Yeon
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2009.04a
    • /
    • pp.429-438
    • /
    • 2009
  • In order to find out the customer requirements and to develop new products more effectively, the Kano model and QFD(Quality Function Deployment), AHP(Analytic Hierarchy Process) developed and applied. But, Many companies difficult to select the CTQ(Critical to Quality) of new product. Especially the life cycle of cell phone is very short. In this thesis, the Kano model and AHP(Analytic Hierarchy Process) for finding the CTQ(Critical to Quality) for customer satisfaction are suggested. It is explained and discussed with the example of cell phone.

  • PDF

Determination of the CTQ of Digital Camera Integrating Kano model & AHP (AHP와 Kano 모델 통합에 의한 디지털 카메라의 핵심품질특성 결정)

  • Cho, Tae-Yeon
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2010.04a
    • /
    • pp.359-369
    • /
    • 2010
  • In order to find out the customer requirements and to develop new products more effectively, the Kano model and QFD(Quality Function Deployment), AHP(Analytic Hierarchy Process) developed and applied. But, Many companies difficult to select the CTQ(Critical to Quality) of new product. Especially the life cycle of Digital Camera is very short. In this thesis, the Kano model and AHP(Analytic Hierarchy Process) for finding the CTQ(Critical to Quality) for customer satisfaction are suggested. It is explained and discussed with the example of Digital Camera.

  • PDF

Mandatore Carriage Requirements of New Navigational Instruments (Revision of SOLAS Chaper V) (새로운 항해장비의 도입과 관련한 SOLAS 개정방향과 대책)

  • 한길용;옥경석;강성진;김창제
    • Journal of the Korean Institute of Navigation
    • /
    • v.22 no.1
    • /
    • pp.31-49
    • /
    • 1998
  • The technology of navigational instruments and the profession of going to sea have entered a time of dramatic change. A paradigm shift is taking place which will eventually make the industry unrecognizable to those who first went to sea only twenty years ago. This change is most emphatically seen in three areas: Automatic Identification System(AIS), Electronic Chart Display and Information System(ECDIS), and Voyage Data Recoreder(VDR). In order to make these new instruments to be fitted on board commerical ships, international requirements for enhacing the safety of navigation on the world's waterways, the Chapter V of International Convention for the Safety of Life at sea, 1974 as ameded(hereinafter referred to as "SOLAS"), are being also changed.o changed.

  • PDF

Analysis of Important Factors for Value Engineering in Highway Construction (도로건설에서 가치공학을 위한 중요인자 분석)

  • 임영문;최요한
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2002.11a
    • /
    • pp.17-23
    • /
    • 2002
  • Value can be defined as function divided by cost. The ultimate goal of VE (Value Engineering) is to simultaneously reduce cost and to enhance function in given projects. In general, there are eight phases (Selection, Investigation, Speculation, Evaluation, Development. Presentation, Implementation, and Audit) to perform VE. This paper presents analysis of important factors for VE in construction fields using QFD (Quality Function Deployment) technique. QFD was introduced in 1972 to help design supertanker in Mitsubish's shipyards in Kob, Japan and formally defined by the American Supplier Institute in 1987 as a system for translating consumer requirements into appropriate company requirements at every stage, from research, through product design and development, to manufacture, distribution, installation, and marketing, sales and services. The objective of this paper is to provide and analyze the trend on the viewpoint of efficient value engineering of field workers. The data are collected by questionnaires. The samples for this study are chosen from 13 companies in Korea during 2 months (2002. 7 ∼ 2002. 8). The results of this study will play an important role not only for the efficient value engineering but also for preparing of life cycle cost analysis.

  • PDF

Software Reliability of Safety Critical FPGA-based System using System Engineering Approach

  • Pradana, Satrio;Jung, Jae Cheon
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.14 no.2
    • /
    • pp.49-57
    • /
    • 2018
  • The main objective of this paper is come up with methodology approach for FPGA-based system in verification and validation lifecycle regarding software reliability using system engineering approach. The steps of both reverse engineering and re-engineering are carried out to implement an FPGA-based of safety critical system in Nuclear Power Plant. The reverse engineering methodology is applied to elicit the requirements of the system as well as gain understanding of the current life cycle and V&V activities of FPGA based-system. The re-engineering method is carried out to get a new methodology approach of software reliability, particularly Software Reliability Growth Model. For measure the software reliability of a given FPGA-based system, the following steps are executed as; requirements definition and measurement, evaluation of candidate reliability model, and the validation of the selected system. As conclusion, a new methodology approach for software reliability measurement using software reliability growth model is developed.