• Title/Summary/Keyword: Life cycle cost evaluation model

Search Result 65, Processing Time 0.028 seconds

Economic Analysis of Long-life Asphalt Pavements using KoPMS (한국형 포장관리시스템을 활용한 장수명 아스팔트 포장의 경제성 분석)

  • Do, Myungsik;Kwon, Sooahn;Baek, Jongeun;Choi, Seunghyun
    • International Journal of Highway Engineering
    • /
    • v.18 no.4
    • /
    • pp.19-28
    • /
    • 2016
  • PURPOSES : Long-life asphalt pavements are used widely in developed countries. In order to be able to devise an effective maintenance strategy for such pavements, in this study, we evaluated the performance of the long-life asphalt pavements constructed along the national highways in South Korea. Further, an economic evaluation of the long-life asphalt pavements was performed based on a life-cycle cost analysis. We aimed to devise a model for evaluating the performance of long-life asphalt pavements using the national highway pavement management system (PMS) database as well as for analyzing the economic feasibility of such pavements, in order to promote their use in South Korea. METHODS : The maintenance history and pavement performance data were obtained from the national highway PMS database. The pavement performances for a total of 292 sections of 10 lanes (5 northbound lanes and 5 eastbound lanes) of national highways were used in this study. Models to predict the performances of hot mix asphalt (HMA) and long-life asphalt pavements under two distinct traffic conditions were developed using a simple regression method. Further, the economic feasibility of long-life asphalt pavements was evaluated using the Korea Pavement Management System (KoPMS). RESULTS : We developed service-life prediction models based on the traffic volume and the equivalent of single-axle load and found that long-life asphalt pavements have service lives 50% longer than those of HMA pavements. Further, the results of the economic analysis showed that long-life asphalt pavements are superior in terms of various economic indexes, including user cost, delay cost, total cost, and user benefits, even though their maintenance cost is higher than that of HMA pavements. A comparison of the economic feasibilities of the various groups showed that group A is superior to HMA pavements in all aspects except in terms of the maintenance criterion (crack 20% or higher) as per the NPV index. However, the long-life asphalt pavements in group B were superior in terms of the maintenance criterion (crack 25% or higher) regardless of the economic feasibility. CONCLUSIONS : The service life of long-life asphalt pavements was found to be approximately 50% longer than that of HMA pavements, regardless of the traffic volume characteristics. The economic feasibility of long-life asphalt pavements was evaluated based on the KoPMS. The results of the economic analysis were the following: long-life asphalt pavements are exceptional in terms of almost all factors, such as user cost, delay cost, total cost, and user benefit; however, the exception is the maintenance cost. Further, the economic feasibility of the long-life asphalt pavements in group B was found to be better than that of the HMA pavements (crack 25% or higher).

A Study on the Life Cycle Cost Analysis of Light Railroad Transit Bridges (경량전철 교량의 생애주기비용 분석에 관한 연구)

  • Lee, Du-Heon;Kim, Kyoon-Tai;An, Dong-Geun;Jun, Jin-Taek;Han, Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.384-389
    • /
    • 2006
  • The needs for Light Railroad Transit(LRT) have been increased due to the heavy traffic congestions in large cities like Seoul, Korea. Korean government is seeking the LRT system development (including planning, designing, construction, and maintenance and operations) in terms of public-private-partnership (PPP). At the private sector side, it is crucial to estimate the life cycle cost (LCC) to project the cash flow during the O&M period. Since the most construction and O&M cost of LRT project is at the bridge construction, a cost analysis model and a cost breakdown structures (CBS) on LRT bridges are discussed through in depth literature reviews. Construction and maintenance cost of bridges are collected and analyzed. LCC is analyzed by types of bridge superstructures and historical data of repair and rehabilitation (R&R) is investigated. There have been scarce number of LCC analysis on railway bridges. This research delivers a well-defined CBS and maintenance cost data, which will be a great benefit to the systematic maintenance strategy development for railroad bridges.

  • PDF

Analysis of Influencing Item of Green Building Certification;Focused on Energy Part of Commercial Buildings (친환경 인증 사업타당성 영향요인 분석;업무용건축물의 에너지 평가부문을 중심으로)

  • Kook, Dong-Hoon;Kim, Ah-Yung;Han, Kap-Kyu;Kim, Sun-Kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.431-435
    • /
    • 2007
  • Green Building Certification Program, which was first introduced to residential buildings in Korea in 2002, has been put on track. This program is expected to bring about the effect in the economic viewpoint that was based on a life-cycle-cost analysis, not to mention the environmental viewpoint. However, given the fact that the existing model for feasibility analysis focusing on early investment cost can hardly be applicable to the green buildings because of lacking the life-cycle-cost reduction factor, it remains still difficult to conduct an objective evaluation. The study thus was intended to identify the factors that should be additionally considered in conducting the feasibility study to be implemented through the analysis of the certification items of green buildings as a preliminary study in structuring the evaluation model for feasibility analysis of green buildings.

  • PDF

A Study on a RAM-Based Model for Integrated Automatic Manufacturing System Design and Performance Evaluation (RAM 을 고려한 복합 생산시스템의 최적설계 및 평가방안의 연구)

  • Hwang, Heung-Suk
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.21 no.1
    • /
    • pp.17-32
    • /
    • 1995
  • The objective of this study is to develop a general design and performance evaluation model for the system designers in the initial design phase of the integrated automatic manufacturing system based on the RAM(Reliability, Availability and Maintainability) and life cycle cost(LCC). The methodology proposed in this research includes the following two stages. First, a deterministic approach to the solution of optimal work station arrangement for the initial system configuration is considered under the assumption that the system availability is one(no failure and maintenance), and then a stochastic simulation model based on RAM and LCC is developed. Using the results of these two stage simulation, a system performance index(SPI) was developed for the performance evaluation of the proposed system. Also a computer program is developed.

  • PDF

Estimating Optimum Investment Cost for Obsolete School Buildings (노후화된 학교건물의 적정시설투자비 산정모델 적용사례)

  • Huh, Young-Ki
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.10 no.1
    • /
    • pp.10-25
    • /
    • 2011
  • Area Offices of Education in Korea assign and execute government budget based on the evaluation of school buildings' safety rating and degree of their deterioration. However, it is never easy to estimate the most appropriate investment amount for old buildings under consideration of their service lives and residual values together. A model of estimating optimum investment cost for obsolete school building is developed taking its life cycle cost into account. The model is also applied to six old buildings in five different schools and found that some of the facilities hardly needed further investment and were better to be rebuilt. The study results will be a great beneficial for officers to make right decision on maintaining obsolete school buildings and to maximize tax payers' money.

STUDY ON LCC ANALYSIS OF BUILDING ACCORDING TO STRUCTURES - FOCUSING ON MILITARY ESTABLISHMENTS -

  • Hyo-Joong Kim;Jung-Whan Oh ;Min Yu ;Mi-Hye Lee ;Young-Dong Yu ;Tae-Keun Park
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1187-1192
    • /
    • 2005
  • Approximately 25% of military establishments became superannuated to unable perform their function, and it influences on the environment by construction wastes and the waste of national budget, as there is no rational and objective standard even though old facilities have been replaced through modernization project. Therefore, it has been searched to introduce industrial building system that can cope with the new building-construction and transference for the improvement of existing military establishments. However, as there is no economical estimation standard for practical use, industrial building-construction is still remaining at the initial stage, and the study is insufficient too. So. in this study, I would like to develope LCC cost model for rational LCC comparative analysis between industrial construction system (Modular) and existing reinforced concrete structure and cage, and to evaluate economical efficiency through case analysis.

  • PDF

A Comparative Study of FMS Performance Evaluation Modeling Using FACTOR/AIM (FACTOR/AIM을 이용한 통합자동 생산시스템의 성능분석을 위한 비교연구)

  • Hwang, Heung-Suk
    • IE interfaces
    • /
    • v.9 no.2
    • /
    • pp.191-202
    • /
    • 1996
  • A variety of approaches on performance evaluation modeling have appeared in the technical literature for flexible manufacturing systems(FMS) which can be evaluated only through computer simulation. This study represents a comparative approach for FMS performance evaluation modeling based on reliability, availability and maintainability, and life cycle cost. The methodology proposed in this research includes the following three-step generative approaches. First, a static model to find the initial system configuration is considered under the assumption that the system availability is given as one (failure and maintenance are not considered), and in second step, a stochastic simulation is proposed to serve as a performance evaluation model for FMS with stochastic failure and repair time. In the last step, we developed a simulation modeling using a simulator, FACTOR/AIM to consider a variety of performance factors and dynamic behavior of FMS. Also the applicability and validity of the proposed approaches has been tested and compared through the results of a sample problem using computer programs and procedures developed in each step.

  • PDF

Corrosion Fatigue Reliability-Based Life Cycle Cost Analysis of High-Speed Railway Steel Bridges (고속철도 강교량의 부식 피로신뢰성 기반 생애주기비용 분석)

  • Cho, Hyo-Nam;Jeon, Hong-Min;Sun, Jong-Wan;Youn, Man-Keun
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.1
    • /
    • pp.107-113
    • /
    • 2008
  • As it recently appears that LCC (Life Cycle Cost) analysis may be considered as an essential method for economic evaluation of infrastructures. Many researches have been made to assess LCC of each facility based on reasonable methods. However, expected maintenance repair cost must be reasonably estimated to enhance the reliability of LCC analysis through systematic and rational methods. This study is intended to propose a rational approach to reliability-based LCC analysis of high-speed railway steel bridges considering lifetime corrosion and fatigue damage. However in Korea, since high speed railway steel bridges are only recently constructed, no direct statistical data are available for the account of the maintenance cost and thus their maintenance characteristics are not clear yet. In this paper, for the assessment of expected maintenance/repair cost, the fatigue system reliability analysis incorporating the corrosion effect is proposed by considering the corrosion and fatigue damage using measured data of high speed railway steel bridges. A model proposed by Rahgozar, of at for fatigue notch factor considering the corrosion effect is used in order to incorporate the corrosion effect into the fatigue strength reduction and S-N curve. Finally, the effectiveness of LCC model proposed for high-speed railway steel bridges is demonstrated by a numerical example.

A study on the Life Cycle Profiles(LCP) for RC Slab Bridge (철근콘크리트 슬래브교의 노후화 예측모델에 관한 연구)

  • Ahn, Young-Ki;Lee, Chae-Gue;Lee, Jin-Wan
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.7 no.3
    • /
    • pp.251-262
    • /
    • 2003
  • LCP(Life Cycle Profiles) of bridge structures are indispensable for the LCC(Life Cycle Cost) evaluations of bridge system. The bridge under considerations may be newly-designed one or one in service. Thus, a systematic study of LCP is essential for both reliable LCC evaluation and strategic bridge management. LCP is mainly influenced by the structural environment in nature. However, in Korea, LCC evaluation has been performed with the LCP of foreign research results or only with the pieces of professional engineers' opinion. Therefore, to alleviate the drawbacks of foreign LCP and to enhance the reliability of current LCP, LCP should be established using the available data in bridge management system(BMS). In this study, LCP along with a subset of the BMS data was investigated and several mathematical expressions were proposed and evaluated. The condition ratings of a bridge were trasformed into the numerical indices through fuzzy logics with real field data. From the numerical results, it is concluded that the mathematical LCP model of $y=\sqrt{y^2_0-at}$ is shown to be the fittest one (R=0.815) to express the condition rating varied with the age. This has been drawn from the case study of slab bridges under the similar conditions.

The Economic Value Analysis of the Potential Wind Farm Site Using the Black-Scholes Model (블랙 숄즈 모델을 이용한 잠재적 풍력발전 위치의 경제적 가치분석)

  • Jaehun Sim
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.45 no.4
    • /
    • pp.21-30
    • /
    • 2022
  • To mitigate the environmental impacts of the energy sector, the government of South Korea has made a continuous effort to facilitate the development and commercialization of renewable energy. As a result, the efficiency of renewable energy plants is not a consideration in the potential site selection process. To contribute to the overall sustainability of this increasingly important sector, this study utilizes the Black-Scholes model to evaluate the economic value of potential sites for off-site wind farms, while analyzing the environmental mitigation of these potential sites in terms of carbon emission reduction. In order to incorporate the importance of flexibility and uncertainty factors in the evaluation process, this study has developed a site evaluation model focused on system dynamics and real option approaches that compares the expected revenue and expected cost during the life cycle of off-site wind farm sites. Using sensitivity analysis, this study further investigates two uncertainty factors (namely, investment cost and wind energy production) on the economic value and carbon emission reduction of potential wind farm locations.