• Title/Summary/Keyword: Levee's side slope

Search Result 4, Processing Time 0.02 seconds

Estimation of discharge coefficients of the broad-crested side weir with various levee's side slope of main channel (본류수로의 제방사면경사에 따른 광정횡월류위어의 유량계수 산정)

  • Kang, Ho-Seon;Cho, Hong-Je
    • Journal of Korea Water Resources Association
    • /
    • v.49 no.11
    • /
    • pp.941-949
    • /
    • 2016
  • The flow characteristics of the broad-crested side weir considering the levee's side slope of main channel ($ES_{ch}$) was investigated through hydraulic experiment in order to estimate the discharge coefficient equation. For applicability to actual river, levee's side slope of main channel 1:0.5, 1:1 and 1:2 were selected. Experimental results show that the new estimated equation for the discharge coefficient including $ES_{ch}$ is reasonable and effective in actual applications by comparing estimated and measured discharge over side weirs. Through a multiple linear regression analysis the importance of variabes were ordered as $ES_{ch}$ > $h/y_u$ > $L/y_u$ > $Fr_u$. Especially the discharge coefficient equation without $Fr_u$ was suggested, and the high applicability was reviewed by comparing the measured and calculated overflow of broad-chested side weir.

Automatic Extraction of River Levee Slope Using MMS Point Cloud Data (MMS 포인트 클라우드를 활용한 하천제방 경사도 자동 추출에 관한 연구)

  • Kim, Cheolhwan;Lee, Jisang;Choi, Wonjun;Kim, Wondae;Sohn, Hong-Gyoo
    • Korean Journal of Remote Sensing
    • /
    • v.37 no.5_3
    • /
    • pp.1425-1434
    • /
    • 2021
  • Continuous and periodic data acquisition must be preceded to maintain and manage the river facilities effectively. Adapting the existing general facilities methods, which include river surveying methods such as terrestrial laser scanners, total stations, and Global Navigation Satellite System (GNSS), has limitation in terms of its costs, manpower, and times to acquire spatial information since the river facilities are distributed across the wide and long area. On the other hand, the Mobile Mapping System (MMS) has comparative advantage in acquiring the data of river facilities since it constructs three-dimensional spatial information while moving. By using the MMS, 184,646,009 points could be attained for Anyang stream with a length of 4 kilometers only in 20 minutes. Levee points were divided at intervals of 10 meters so that about 378 levee cross sections were generated. In addition, the waterside maximum and average slope could be automatically calculated by separating slope plane form levee point cloud, and the accuracy of RMSE was confirmed by comparing with manually calculated slope. The reference slope was calculated manually by plotting point cloud of levee slope plane and selecting two points that use location information when calculating the slope. Also, as a result of comparing the water side slope with slope standard in basic river plan for Anyang stream, it is confirmed that inspecting the river facilities with the MMS point cloud is highly recommended than the existing river survey.

A Study for Seepage Control of Levee with a Pervious Toe Drain (제내 비탈끝 배수공을 이용한 제방의 침투조절에 관한 연구)

  • Kong, Young-San;Kang, Tae-Uk;Lee, Sang-Ho
    • Journal of Korea Water Resources Association
    • /
    • v.45 no.6
    • /
    • pp.569-581
    • /
    • 2012
  • The levee is the facility which is constructed along with river for the protection of landside and for passage of water when there is a flood. When the seepage is exposed to the atmosphere on the landside surface of levee, it may eventually lead to levee failure. The seepage water may be removed from the landside surface by a properly designed drainage system. The purpose of the study is to show seepage control effect of a pervious toe drain, and to compare two drainage methods of a pervious toe drain. One is the pervious toe drain suggested by U.S. Army Corps of Engineers (USACE) and the other is that suggested by Japan Institute of Construction Engineering (JICE). The levee model constructed has the following dimension: the base width is 2.6 m; the crest width is 0.4 m; the side slope 1 : 2. The water depth in the riverside is 0.5 m. The shape of the toe drain by USACE is triangular. The shape of the toe drain by JICE is rectangular. They were installed with the base length of 0.4 m. The levee model without the toe drain showed saturation surface on the land side in the experiment but not with the toe drain. The experiment results was applied to a numerical analysis model using SEEP/W to calibrate and verify. The numerical analysis results for 35 cm and 30 cm drain width showed that the drain by JICE is a little bit safer than the drain by USACE. It is also easier to construct the toe drain by JICE. The results in the study would be applied to plan the seepage control for a levee with pervious toe drain.

Development of Depositional Landforms in Upstream Reach of Ulsan Sayeon Dam Lake (울산 사연호 상류의 퇴적지형 발달)

  • Chang, Mun-Gi
    • Journal of the Korean association of regional geographers
    • /
    • v.13 no.4
    • /
    • pp.409-421
    • /
    • 2007
  • The purpose of this paper is to consider the formation processes and depositional conditions of bars formed at the upper-stream part of Sayeon Dam since Sayeon Dam construction in 1964. Results of analyzing the shape characteristics of bars and their sediment grain size distribution are as follow: Firstly, bars are able to categorized as subaqueous bars (A, B), mid-channel bars(C, D), and tributary side-bars(E). Secondly, the outline of bars has longish along the flow path, and their height lowers more and more going towards downstream. Also the height of bar surface tend to heighten from flow path to mountain slope. However, the near part of A is comparatively higher than its distant part, A is defined as a subaqueous natural levee and back swamp. Thirdly, the average particle size of A and B become smaller toward mountain slope. In transportation style, ratio of suspended load become higher toward mountain slope. Fourthly, sorting is worse to very worse according with lake's random changable water level. Fifthly, bar A and B were formed by vertical sedimentation of sediments according as sediments transported along flow path in the subaqueous conditions were spreaded out of flow path. C and D were formed by bed load as flood level lowered. And E was formed by vertical sedimentation while stream flow stopped in tributary's mouth areas with the water level heightening.

  • PDF