• Title/Summary/Keyword: Legacy Substation

Search Result 6, Processing Time 0.021 seconds

Development of the Gateway in IEC61850 based Substation for Smart Grid (스마트 그리드용 IEC61850 기반 변전소에서의 게이트웨이 개발)

  • Yun, Seok-Yeul
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.7
    • /
    • pp.1324-1330
    • /
    • 2011
  • This paper presents the development of gateway for smart grid for the interoperable communication between IEC 61850 station leveled devices and one of legacy Modbus, DNP3, and IEC60870-5-101/104/103 communication protocol devices of bay level in substation or for the exchange of information between IEC 61850 substation and SCADA control center. The data-mapping model is designed for the exchange of information and the gateway configuration tool is developed for generating meta-data based on XML Schema. this paper is mostly concerned with the design and realization of gateway system for the interoperable data communication between a legacy protocol device and IEC61850 based devices or systems.

A Study on the Possibility of Transforming to Digital Substations using IEC 61850 Field Information Processing Panel of Legacy Substation (기존 변전소의 IEC 61850 기반 현장정보처리반을 이용한 디지털변전소 전환 가능성 검토에 관한 연구)

  • Yuk, Sim-Bok;Lee, Sung-Hwan;Kim, Chong-il
    • The Journal of Korea Institute of Information, Electronics, and Communication Technology
    • /
    • v.11 no.2
    • /
    • pp.129-136
    • /
    • 2018
  • The IEC 61850 communication standard is used worldwide, and within the country the new substation is built as a digital substation based on IEC 61850 from 2013, after field tests and R&D from 2007. Research on the development of digital substation operating system has been conducted mainly in large domestic companies, so the IED power application equipment for LCP are developed. However, there is still a lack of research in the field of systems that can accommodate all the field devices used for legacy substation and new digital substation. In this paper, we developed the 48VDC input modules and the 125VDC output modules which can construct proposed field information processing modules to IEC 61850 based type, and verified the field applicability from the state monitoring and control operation tests by using IEC 61850 client authentication program and Wireshark.

A Study on the Test Method of Local Information Processing Device in Digital Substation Based on IEC 61850 (IEC 61850 기반 디지털변전소 현장정보처리장치 시험 방법에 관한 연구)

  • Kim, Nam-Dae;Kim, Woo-Jung;Lee, Nam-Ho;Kim, Seok-Kon;Jang, Byung-Tae
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.6 no.3
    • /
    • pp.253-257
    • /
    • 2020
  • The local information processing devices are devices that process information by converting voltage, current, and digital electric signals from legacy-type power facility into IEC 61850 based data. It acquires and processes the operation information of legacy-type power facility, performs control of power facility, and interlock function using internal logic. In particular, the time to convert data to process input and output information for a device is important because a number of protection relay input and output signals are handled by only one device. This paper introduces test methods and cases for measuring IEC 61850 communication function and input/output data conversion time of local information processing device.

The Configuration Method of trip logic for IEC 61850 based IED using XML (IEC 61850 기반 IED의 XML을 이용한 트립로직 구성)

  • Go, Chol-Jin;Jin, Yong-Woo;Kim, Kyong-Taek;Kim, Jin-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.315-316
    • /
    • 2006
  • As IEC 61850 based substation automation technology is emerging globally, there are many efforts to implement and apply this IEC 61850 standard to substation automation area. IEC 61850 based substation supports ethernet network, standard data model and SCL(substation Configuration Language), etc. These features can provide enough environment to make applied technology which can substitute the legacy relay trip logic configuration method(PLC or Local area reconstruction) to XML based configuration method. This paper suggests new IED trip logic configuration method. The XML based trip logic configuration method can be established using SCL technology And IED trip logic reconfiguration from remote center can be possible under ethernet based technology

  • PDF

Research on Protocol Conversion Gateway based on IEEE1815.1 (IEEE 1815.1 기반 이기종 프로토콜 변환 게이트웨이 기술 연구)

  • Lee, Seokjun;Kwon, Sungmoon;Shon, Taeshik;Park, Sungwan
    • Journal of the Korea Institute of Information Security & Cryptology
    • /
    • v.26 no.5
    • /
    • pp.1201-1209
    • /
    • 2016
  • While the legacy electric grid evolving into the smart grid, various communication standards have been used for interoperability between many components. In this situation, the needs emerged for protocol conversion and mapping method for connecting the outside components to the operation center. In this paper, according to the surge of IEC 61850-based substation automation, we studied the protocol conversion gateway for linking legacy DNP3-based control center and IEC 61850-based substation automation. This paper is based on the IEEE 1815.1 standard for the protocol mapping. We suggested the direction of development the gateway and developed prototype for evaluate the proposed gateway. Also, we bring up a security problem and give a solution.

Development of Unified SCADA System Based on IEC61850 in Wave-Offshore Wind Hybrid Power Generation System (파력-해상풍력 복합발전시스템의 IEC61850기반 통합 SCADA시스템 개발)

  • Lee, Jae-Kyu;Lee, Sang-Yub;Kim, Tae-Hyoung;Ham, Kyung-Sun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.5
    • /
    • pp.811-818
    • /
    • 2016
  • This paper suggests a structure of power control system in floating wave-offshore wind hybrid power generation system. We have developed an unified SCADA(Supervisory Control and Data Acquisition) system which can be used to monitor and control PCS(Power Conversion System) based on IEC61850. The SCADA system is essential to perform the algorithm like proportional distribution and data acquisition, monitoring, active power, reactive power control in hybrid power generation system. IEC61850 is an international standard for electrical substation automation systems. It was made to compensate the limitations of the legacy industrial protocols such as Modbus. In order to test the proposed SCADA system and algorithm, we have developed the wind-wave simulator based Modbus. We have designed a protocol conversion device based on real-time Linux for the communication between Modbus and IEC61850. In this study, SCADA system consists of four 3MW class wind turbines and twenty-four 100kW class wave force generator.