A Study on the Test Method of Local Information Processing Device in Digital Substation Based on IEC 61850 |
Kim, Nam-Dae
(The authors are with KEPCO Research Institute, Korea Electric Power Corporation)
Kim, Woo-Jung (The authors are with KEPCO Research Institute, Korea Electric Power Corporation) Lee, Nam-Ho (The authors are with KEPCO Research Institute, Korea Electric Power Corporation) Kim, Seok-Kon (The authors are with KEPCO Research Institute, Korea Electric Power Corporation) Jang, Byung-Tae (The authors are with KEPCO Research Institute, Korea Electric Power Corporation) |
1 | Communication networks and systems for power utility automation - Part 1: Introduction and overview, IEC 61850 Standard Part 1, 2013. |
2 | K. H Jung, S. C Jung, Y. J Myung, "A Study on Implementation of SCADA liked System for Legacy Substation Applied on IEC 61850," Proceedings of The Korea Institute of Electrical Engineers, pp. 225-226, Jul. 2013. |
3 | R. Hunt, B. Popescu, "SCADA communications for protection engineers," 2015 68th Annual Conference for Protective Relay Engineers, College Station, TX, pp. 881-891, 2015. |
4 | J. S Kwon, K. W Park, C. H Shin, Y. G Kim, "A Study on the Performance Evaluation of IEC 61850 GOOSE Messaging," Proceedings of Symposium of the Korea Institute of communications and Information Sciences, pp. 236-237, Nov. 2015. |
5 | N. H Lee, B. T Jang, B. H Kim, E.B Shim, "A study on the Field Test of IEC 61850 based Substation Automation System," Proceedings of The Korean Institute of Electrical Engineers, pp. 250-251, Jul. 2009. |
6 | S. B Yuk, S. H Lee, C. I Kim, "A Study on change from an RTU-based substation to IEC 61850-based SA substation," Journal of Korea Institute of Information, Electronics, and Communication Technology, Vol. 11, No. 4, pp. 436-444, 2018. DOI |
7 | Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs, IEC 61850 Standard Part 6, 2013. |
8 | Communication networks and systems for power utility automation - Part 10: Conformance testing, IEC 61850 Standard Part 10, 2013. |
9 | Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3, IEC 61850 Standard Part 8-1, 2011. |
10 | Communication networks and systems for power utility automation - Part 5: Communication requirements for functions and device models, IEC 61850 Standard Part 5, 2013. |
11 | I. Ali, M. S Thomas, S. Gupta, "Methodology & Tools for performance evaluation of IEC 61850 GOOSE based protection schemes," 2012 IEEE Fifth Power India Conference, Murthal, pp. 1-6, 2012. |