• 제목/요약/키워드: Legacy Substation

검색결과 6건 처리시간 0.025초

스마트 그리드용 IEC61850 기반 변전소에서의 게이트웨이 개발 (Development of the Gateway in IEC61850 based Substation for Smart Grid)

  • 윤석열
    • 전기학회논문지
    • /
    • 제60권7호
    • /
    • pp.1324-1330
    • /
    • 2011
  • This paper presents the development of gateway for smart grid for the interoperable communication between IEC 61850 station leveled devices and one of legacy Modbus, DNP3, and IEC60870-5-101/104/103 communication protocol devices of bay level in substation or for the exchange of information between IEC 61850 substation and SCADA control center. The data-mapping model is designed for the exchange of information and the gateway configuration tool is developed for generating meta-data based on XML Schema. this paper is mostly concerned with the design and realization of gateway system for the interoperable data communication between a legacy protocol device and IEC61850 based devices or systems.

기존 변전소의 IEC 61850 기반 현장정보처리반을 이용한 디지털변전소 전환 가능성 검토에 관한 연구 (A Study on the Possibility of Transforming to Digital Substations using IEC 61850 Field Information Processing Panel of Legacy Substation)

  • 육심복;이성환;김종일
    • 한국정보전자통신기술학회논문지
    • /
    • 제11권2호
    • /
    • pp.129-136
    • /
    • 2018
  • 전 세계적으로 국제 표준인 IEC 61850 통신규약을 사용하고 있고 국내에서도 2007년도부터 시험 적용과 연구개발을 통해 2013년부터 신규 건설되는 변전소는 IEC 61850 기반의 디지털변전소로 준공되어 지고 있다. 국내 대기업을 중심으로 디지털 변전소 운영시스템 개발을 위한 연구가 진행되어 LCP용 IED 전력응용기기를 개발하였으나, 기존 변전소에 설치되어 운전 중인 구형의 현장기기와 신형인 디지털 변전소 운영시스템에 사용되는 현장기기를 모두 수용할 수 있는 시스템 분야의 연구는 아직 미흡한 실정이다. 본 논문에서는 제안된 현장정보처리반을 IEC 61850 기반으로 구성할 수 있는 48VDC 입력모듈과 125VDC 출력모듈을 구현하고 패킷 분석 툴인 IEC 61850 클라이언트 인증 프로그램과 Wireshark를 사용하여 상태감시, 제어조작시험을 실시하여 현장 적용 가능성을 검증하였다.

IEC 61850 기반 디지털변전소 현장정보처리장치 시험 방법에 관한 연구 (A Study on the Test Method of Local Information Processing Device in Digital Substation Based on IEC 61850)

  • 김남대;김우중;이남호;김석곤;장병태
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제6권3호
    • /
    • pp.253-257
    • /
    • 2020
  • 현장정보처리장치는 아날로그형 전력설비의 전압, 전류, 디지털 전기신호를 IEC 61850 기반 데이터로 변환하여 정보를 처리하는 장치이다. 이는 아날로그형 전력설비의 운전 정보를 취득 및 처리하고, 전력설비의 제어를 수행하며, 내부 로직을 이용하여 인터록 기능 등을 수행한다. 특히, 다수의 보호계전기 입출력 신호를 하나의 장치에서 처리하기 때문에 장치의 입출력 정보를 처리하는 데이터 변환시간이 중요하다. 본 논문에서는 현장정보처리장치의 IEC 61850 통신 기능 및 입출력 데이터 변환시간을 측정할 수 있는 시험 방법과 사례를 소개하고자 한다.

IEC 61850 기반 IED의 XML을 이용한 트립로직 구성 (The Configuration Method of trip logic for IEC 61850 based IED using XML)

  • 고철진;진용우;김경택;김진호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 제37회 하계학술대회 논문집 A
    • /
    • pp.315-316
    • /
    • 2006
  • As IEC 61850 based substation automation technology is emerging globally, there are many efforts to implement and apply this IEC 61850 standard to substation automation area. IEC 61850 based substation supports ethernet network, standard data model and SCL(substation Configuration Language), etc. These features can provide enough environment to make applied technology which can substitute the legacy relay trip logic configuration method(PLC or Local area reconstruction) to XML based configuration method. This paper suggests new IED trip logic configuration method. The XML based trip logic configuration method can be established using SCL technology And IED trip logic reconfiguration from remote center can be possible under ethernet based technology

  • PDF

IEEE 1815.1 기반 이기종 프로토콜 변환 게이트웨이 기술 연구 (Research on Protocol Conversion Gateway based on IEEE1815.1)

  • 이석준;권성문;손태식;박성완
    • 정보보호학회논문지
    • /
    • 제26권5호
    • /
    • pp.1201-1209
    • /
    • 2016
  • 기존의 전력망이 스마트그리드로 진화하면서, 수많은 컴포넌트간의 상호운용을 위해 각종 통신 표준과 기술들이 사용되고 있다. 이러한 실정에, 운영센터에서 외부와의 연계를 위한 다양한 프로토콜 연계방안의 필요성이 대두되었다. 본 논문에서는 국내에 자동화 변전소가 급증하는 실정에 따라, 기존제어센터와 자동화 변전소의 프로토콜 연계인 DNP3와 IEC 61850의 프로토콜 연계 게이트웨이에 대해 연구하였다. 프로토콜 매핑을 위해 IEEE 1815.1 표준을 분석하였으며, 게이트웨이의 개발 방향을 제시하고 프로토타입을 개발해 실현가능성을 검증하였다. 이에 더불어, 발생가능 한 보안 문제를 제기하고 보안기술을 제시한다.

파력-해상풍력 복합발전시스템의 IEC61850기반 통합 SCADA시스템 개발 (Development of Unified SCADA System Based on IEC61850 in Wave-Offshore Wind Hybrid Power Generation System)

  • 이재규;이상엽;김태형;함경선
    • 전기학회논문지
    • /
    • 제65권5호
    • /
    • pp.811-818
    • /
    • 2016
  • This paper suggests a structure of power control system in floating wave-offshore wind hybrid power generation system. We have developed an unified SCADA(Supervisory Control and Data Acquisition) system which can be used to monitor and control PCS(Power Conversion System) based on IEC61850. The SCADA system is essential to perform the algorithm like proportional distribution and data acquisition, monitoring, active power, reactive power control in hybrid power generation system. IEC61850 is an international standard for electrical substation automation systems. It was made to compensate the limitations of the legacy industrial protocols such as Modbus. In order to test the proposed SCADA system and algorithm, we have developed the wind-wave simulator based Modbus. We have designed a protocol conversion device based on real-time Linux for the communication between Modbus and IEC61850. In this study, SCADA system consists of four 3MW class wind turbines and twenty-four 100kW class wave force generator.