• Title/Summary/Keyword: Lee, Gyeongbu

Search Result 49, Processing Time 0.219 seconds

Analysis of the Contact Wire Wear Pattern According to the Pre-sag (사전이도에 따른 전차선 마모 패턴 분석)

  • Lee, In-Hee;Park, Jae-Young
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.10
    • /
    • pp.1501-1507
    • /
    • 2015
  • The contact wire pre-sag in railway overhead catenary has been considered as a innovative idea which improves the current collection quality and is expected to evenly distribute wear along a span. However, long term studies on the effects of pre-sag, especially on the quantitative wear pattern of the contact wire, have not yet been reported. Therefore, in this study, the pre-sag and wear pattern of the contact wire along a span from long term operation of railway in Korea was surveyed. The examination was conducted on 3 lines, the Gyeongbu high-speed line with pre-sag of span/2000, the Gyeongbu existing line without pre-sag, and Gyeongchun line with pre-sag installation on 1/1000 of its span. The wear measurements of 58 sample spans were examined. The wear pattern analysis show no interrelationships between pre-sag and evenly distributed wear, but more wear occurred at the center of a span compared to the ends of the span, especially more noticeable as span length increases.

The Derailment Safety Estimation of DMT Freight for Real Track Condition (실제 선로조건에 따른 DMT 화차의 탈선안전도 평가)

  • Son, Myoung-Sun;Eom, Beom-Gyu;Lee, Hi-Sung
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.21 no.7
    • /
    • pp.637-642
    • /
    • 2011
  • The DMT freight is judged that economic performance is good because can increase cargoes than existing freight. However, the existing freight cars, each with a different balance to the body structure is bogie because the vibrations may occur. Thus, by minimizing vibration over the existing freight securing the safety of the driving if you will not have major problems in cargoes. In this study, multi-body dynamic analysis tool, VI-Rail using the actually Gyeongbu Railroad line and an empty, full freight condition include curve radius, track irregularity, The DMT freight of the derailed wagons were assessed for safety analysis. Full and empty freight conditions for parity in the Gyeongbu Railroad line(Dongdaegoo${\leftrightarrow}$Kyungsan) derailment safety analysis, such as derailment coefficient and the wheel unloaded, echoing the curve and the orbit is affected by the irregularity was found. Full freight condition than the empty conditions showed a significant derailment safety. Overall, the limits of derailment coefficient(Q/P = 0.8) and wheel unload decrement limits(${\triangle}P/P$ = 0.6) is less safe with me confirmed that the derailment safety.

Distribution of vascular plant in Mt. Cheonsung, Yangsan (양산 천성산지역 관속식물의 분포)

  • Shin, Hyun-Tak;Lee, Jae-Yoon
    • Korean Journal of Plant Resources
    • /
    • v.22 no.2
    • /
    • pp.180-194
    • /
    • 2009
  • 588 taxa of vascular plants including 121 families, 399 genera, 510 species, 67 varieties, 2 subspecies, 7 forma, and 2 hybrid species were investigated in Mt. Cheonsung. Among them, 116 species were newly added in this research. The area for Gyeongbu High-speed Railway passes Mujechi 3, 4, 5, and 6 and Daeseongsa around the wetlands were investigated 6 species of rare and endangered plants, 9 species of endemic plants and 37 species of special flora plants in Mt. Cheonsung. Appear due to the construction of the Gyeongbu High-speed Railway vegetation changes, especially about the impact of wetland plants for long-term monitoring is expected to need. Moreover, plant preservation plan about water source change in upper wetland should be established.

Arrival Delay Estimation in Bottleneck Section of Gyeongbu Line (철도선로용량 부족에 따른 지체발생 연구 - 경부선 서울~금천구청 구간을 대상으로)

  • Lee, Jang-Ho
    • Journal of the Korean Society for Railway
    • /
    • v.18 no.4
    • /
    • pp.374-390
    • /
    • 2015
  • This research shows the relationship between the number of trains and the probability of trains with arrival delay and suggests way to estimate the benefits of improved punctuality in a bottleneck section of the Gyeongbu Line. The arrival delays of high-speed and conventional trains were estimated using the train operation data of KORAIL. Linear regression models for the probability of trains with arrival delay by train type are presented in this paper. The probabilities of trains with arrival delay were more affected by the number of conventional trains than by the number of high-speed rail trains. For the empirical analysis, a project for increasing the capacity in the Seoul~Geumcheongu office section was tested. The benefits of the improved punctuality were estimated to be 4.2~4.5 billion Korean won every year. This research has some limitations but it can help evaluate more precisely the feasibility of the project of increasing the capacity in bottleneck sections.

Study on Securing Train Braking Distances according to the Schedule Speed Improvement (표정속도 향상에 따른 열차제동거리 확보방안 연구)

  • Lee, Hoon-Koo;Kim, Jin-Chuol;Lee, Soo-Hwan;Lee, Boo-Hyum;Eum, Ki-Young
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.1238-1239
    • /
    • 2011
  • For the domestic railways, we carry out the speed-up project for the maximum speed, came out of the plan on the schedule speed improvement, such as the Gyeongbu HSR 1st and 2nd step project and the speed-up project of the major trunk railways. As the speed increase, we shall review the conventional calculation methods for braking distances and identify the increase of braking distances. In this way, we shall secure the safe braking distances.

  • PDF

A dropper length calculation method of the elevating span in overlap area (무효 인상 경간에서 드로퍼 길이 계산 기법)

  • Kwon, Sam-Young;Lee, Ki-Won;Cho, Yong-Hyeon
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1503-1510
    • /
    • 2011
  • The dropper length calculation method about the normal same encumbrance spans is well known independent to whether the pre-sag is given or not. But, the dropper length calculation method for the elevating span which consists in the end area of a tensioning section and normally consists with overlaps is not well known. In this study, firstly, we investigate the dropper length calculation method about the elevating span whether the insulator is contained in or not, we also recognize the effect of dropper length due to the change of the take-off point. Secondly, we very this calculation method with a catenary sample data and check again with Gyeongbu HSL design data.

  • PDF

Analysis of Relationship between the Irregularities of Rail Weld Surface and Track Irregularities (레일용접부 요철과 궤도틀림 상관관계 분석)

  • Woo, Byoung-Koo;Kim, Yong-Hyok;Yun, Un-San;Kim, Kwan-Hyung;Lee, Sung-Uk
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.539-545
    • /
    • 2009
  • KTX trains which began passenger service between Seoul and Busan in April 2004 have gained very high evaluation for their safe operation. Track is one of the most important means to keep KTX safety, it has not been a fail of safe structure. The track failure during operation may lead to a severe accident. So, it is to be verified the confidence of track maintenance management on the high speed line. This paper would like to find a track deformation trend through a comparative analysis on actual measurement data at these times. It discusses the effect of cyclic dynamic load at welding part. KTX dynamic impact load was measured in accordance with a rail surface irregularity and analyzed some track irregularities according to the condition of rail profile at welding part in the Gyeongbu high speed line.

  • PDF

A Cost-Benefit Analysis for the Installation of Piezoelectric Energy Harvester (압전에너지 하베스터 설치사업의 경제성 분석에 관한 연구)

  • Lee, Hyun-Kyung;Lee, Min-Gi;Kim, Hong-Bae
    • Journal of the Korean Regional Science Association
    • /
    • v.33 no.3
    • /
    • pp.49-59
    • /
    • 2017
  • The piezoelectric energy harvester is recently being developed and catching on as a way to achieve low carbon green growth. The practical application of the piezoelectric energy harvester is expected to contribute not only to the reduction of greenhouse gas emissions but also to the improvement of residents' welfare. This paper conducted a cost-benefit analysis for the installation of piezoelectric energy harvester on the highway focusing on its impacts on the public. The results showed that the installation of piezoelectric energy harvester on the gyeongbu highway is economically feasible in that it could increase the social welfare for the residents. Finally, this paper suggests policy direction for the practical use of the piezoelectric energy harvester, based on the results obtained.

The Study on Centralization & Electronic for Maintenance Efficiency of Ground Signaling System (지상신호설비의 유지보수 효율화를 위한 집중화 및 전자화 연구)

  • Baek, Jong-Hyen;Kim, Yong-Kyu;Lee, Kang-Mi
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.8
    • /
    • pp.2983-2988
    • /
    • 2010
  • The train control system used in Gyeongbu-line is classified in ATC, IXL and CTC. Domestic railway signaling systems are being developed by electrification. In these systems the electrification of interlocking reaches 57% and the safety equipments of railway crossings in trackside devices have completed their development into an integrated system. Block systems of all the existing sections have not yet electrified and integrated so that they need a number of complement in terms of construction and maintenance. For ABS currently used in existing domestic lines, and LEU being installed in Gyeongbu and Honam lines, although a train is controlled by the signaling information of the same train in the same location, the system is separately installed so that the same information is separately divided and transmitted at the each distinct system. Therefore, in the conventional ABS and LEU, there are a lot of duplicate installed compartments such as lamp detection and a power supply unit. Hence, we have a lot of problems: for maintenance, a lot of manpower and costs need to be invested and the overall manufacturing costs get higher, as well as the construction costs by duplicate. Therefore, this paper suggest design to develop an integrated electronic Block Control Unit by the integration of the currently used ABS, and communication and electronic technology. We are to monitor and manage the block systems in the corresponding station by integrating. And we are to transmit information together with LEU, which is an ATS wayside transmitter.