A Study on the Structural Behavior and Safety Evaluation based on Field Measurement Value of Launching Truss (런칭 트러스의 안전성 평가 및 실측치에 기초한 구조거동에 관한 연구)

  • Park, Young Hoon;Lee, Seung Yong;Jeon, Jun Chang;Chang, Dong Il
    • Journal of Korean Society of Steel Construction
    • /
    • v.10 no.3 s.36
    • /
    • pp.383-391
    • /
    • 1998
  • Launching truss used for constructing the precast segmental concrete bridge has upper chord, lower chord and diagonal members. And the pin is used for connecting these members. From the field loading test carried out for investigating the actual behavior of launching truss, the great difference is analyzed between measured stress and calculated stress. Based on measured value, the structural analysis are carried out about assumed abnormal behavior of connection part. From the results of analysis, it is analyzed that the abnormal behavior of connection part greatly affect the structural behavior of launching truss. In addition, from the investigation of safety of launching truss, it is evaluated that the launching truss has enough safety with normal behavior of connection part.

  • PDF

Measurement during Construction of Nakdong Bridge by Incremental Launching Method (낙동강교 ILM 가설에 따른 시공 중 계측)

  • Kim, Hyung-Tae;Cho, Nam-So;Jung, Ji-Man;Yang, Sung-Man
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.575-580
    • /
    • 2007
  • As the volume of traffic in southern part of the republic of Korea grew, expansion of transportation was required. In that purpose, the railway between Samnangjin and Gwangyang is being extended to a double-track line. This construction includes Nakdong bridge located across Nakdong river. This truss bridge is constructed in incremental launching method (ILM) and composed of two sections, straight line and curved one. Bridge construction in the method goes with the shift of roller supports which results in the change of structural system. To accomplish safe construction, the measurement during the whole launching stages. The locations of member in severe condition and the corresponding response values were estimated through the preliminary construction stage analysis. Based on the analysis, the measurement during construction was planned. Several sensors and measurement devices were installed at appropriate locations. During the whole launching stages, the measurement was performed and the corresponding data were monitored and stored in real time. The comparison of the responses from the analysis and the measurement showed no indication of yielding of the structural members. Consequently, the construction of Nakdong bridge was concluded to be relevant.

  • PDF

Optimization of Satellite Structures by Simulated Annealing (시뮬레이티드 어닐링에 의한 인공위성 구조체 최적화)

  • Im Jongbin;Ji Sang-Hyun;Park Jungsun
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.29 no.2 s.233
    • /
    • pp.262-269
    • /
    • 2005
  • Optimization of a satellite structure under severe space launching environments is performed considering various design constraints. Simulate annealing, one of combinatorial optimization techniques, is used to optimize the satellite. The optimization results by the simulated annealing are compared to those by the method of modified feasible direction and genetic algorithm. Ten bar truss structure is optimized for feasibility study of the simulated annealing. Finally, the satellite structure is optimized by the simulated annealing algorithm under space environment. Weights of the satellite upper platform and propulsion module are minimized with consideration of several static and dynamic constraints. MSC/NASTRAN is used to find the static and dynamic responses. Simulated annealing has been programmed and integrated with the finite element analysis program for optimization. It is shown that the simulated annealing algorithm can be extended to the optimization of space structures.

Design of Dang-San Steel Railway Bridge (당산철교의 설계)

  • 유동호;김선일
    • Computational Structural Engineering
    • /
    • v.12 no.4
    • /
    • pp.69-69
    • /
    • 1999
  • Design of Dangsan Steel Railway Bridge(a part of Seoul Subway Line NO. 2), which is supposed to be replaced after its 15years survice, was done, and the reconstruction has begun in Dec. 1997. The design include new superstruc-ture and bridge piers, retrofitting of the foun-dation, rail system, electric and signal, etc. In this paper, design of the structure is mainly summarized. The main span superstructure, across Han river, is composite section which is com-posed of steel box and reinforced concrete deck slab with 9 span continuous. The superstructure for the approaches is bottom througth type 2-cell steel box girder with steel floor system and concrete deck slab with 3 or 4 span continuous. The bridge piers was planned to be reconstructed based upon the result from the various investi-gations, while the foundation(cassion and pile foundation) was planned to be retrofitted. For superstructure erection, the method of combination of barge bent and heavy lifting and the launching truss method was investigated for the main span and approach spans, respectively.

  • PDF

A study on the vibration calculation method of portal frame structure with variable sections (변화하는 단면의 문형구조물의 진동계산에 관한 연구)

  • 조용수;전효중
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.9 no.3
    • /
    • pp.214-224
    • /
    • 1985
  • In this paper, some theoretical equations are derived to calculate natural frequencies and their modes of a portal type derrick system and developed a computer program to carry out their calculations. The ship's structures, such as funnels, upper decks, engine structures, shaft systems suffer local vibrations of the ship. The exciting forces of vibrations are induced by the bearing force and the surface force of propeller or by the main engine. For solving the vibration problem of riggings like the derrick system the natural frequency of its system must be exactly estimated as far as possible and its resonance condition must be kept out of the normal engine operating speed range. When some severe resonances are encountered after the ship's launching, it may be required a tremendous cost to amend their condition. An experimental model of the portal type derrick is made, which is composed of two posts and a truss. This experimental model is excited by an electrical-magnet, and its vibration responses are found out. The calculating results of the model by the developed computer program are compared with those of measured values of model experiment, and they show fairly good agreements.

  • PDF

Long Term Behavior and Analysis of Full Span Precast Segmental Bridge (풀스팬 프리캐스트 세그먼트 교량의 해석 및 장기거동 해석)

  • 오병환;채성태;정상화;박지언
    • Proceedings of the KSR Conference
    • /
    • 1999.05a
    • /
    • pp.434-441
    • /
    • 1999
  • The newly proposed Precast Segmental Mettled (PSM), which makes use of precast elements for election, is relatively new, efficient and fast mettled for the construction of prestressed box girder bridges. A precast segment of 25m long pretensioned in the fabrication yard is transported by a special trailer and a launching truss to its final position. The segments are then connected in the site by post-tensioning to make a continuous prestressed concrete box girder bridges. The purpose of this parer is to analyze and evaluate the design of precast prestressed concrete box girder bridges. The detailed analyses including time-dependent behavior of PSM bridges are conducted. The major results and findings, which have been obtained from finite element analysis of PSM bridge, are discussed in this paper and these results will be a good base for the design and analysis of a new precast bridges.