• Title/Summary/Keyword: Launch Analysis

Search Result 720, Processing Time 0.029 seconds

Preliminary EMC Analysis between the COMS and the GEO Launch Vehicles (통신해양기상위성과 정지궤도 발사체와의 전자파 적합성 해석)

  • Kim, Eui-Chan;Lee, Heung-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.3
    • /
    • pp.439-445
    • /
    • 2008
  • In this paper, the preliminary EMC analysis process between the Communication, Ocean and Meteorological Satellite (COMS) and Geostationary Earth Orbit (GEO) launch vehicles in the frequency range [1MHz-47MHz] is described. The considered launch vehicles are arian V, sea Launch, land Launch, atlas III&V, delta IV, proton M/breeze M, soyuz, HII-A and Angara. The launch vehicle Radiated Emission (RE) specifications have been compared to COMS satellite Radiated Susceptibility (RS) limits. The COMS RS limits are the RS qualification levels of COMS units during launch. As a result, The radiated emission levels of arian V, sea launch, atlas III&V, delta IV, proton M/breeze M, HII-A and angara are compliant with COMS RS limits. The negative margins appear between land launch or soyuz launch vehicle RE and COMS RS. Then, if the land launch or soyuz is chosen by the customer, The tests should be performed at satellite level in order to demonstrate the compatibility with respect to launch vehicles specifications.

PRELIMINARY TRANSFER ORBIT MISSION ANALYSIS OF COMS

  • Kim, Bang-Yeop;Gicquel, Anne-Helene;Brichler, Geoffroy
    • Proceedings of the KSRS Conference
    • /
    • v.1
    • /
    • pp.336-339
    • /
    • 2006
  • In this paper, the preliminary transfer orbit analysis results for the COMS mission were presented. As the first step of transfer orbit analysis, the preliminary analyses of LAE burn strategy, geometrical visibility, and launch window were performed. For the analysis process, all launcher nominates were divided into three groups according to the declination of LAE thrust angle. So, the three launch cases were assigned as the representative launcher of each group, respectively. They are Ariane-5, Atlas summer and winter launch cases. And all analyses were performed at the representative launcher of each group. One nominal and three back-up plans were considered for the establishment of LAE burn strategy. And for geometrical visibility analysis, four TT&C ground stations were considered. Finally, the preliminary launch window analysis was performed about the duration of one year from the first day of September 2008. The analysis results show that the all launch cases comply with the transfer orbit operation requirements.

  • PDF

Analysis on Acoustic Noise around Launch Pad Induced by the Launch of a Space Launch Vehicle (우주발사체 발사에 의한 발사장 주변의 음향 소음 분석)

  • Sim, Hyung-Seok;Choi, Kyu-Sung;Ko, Jeong-Hwan;Roh, Woong-Rae
    • Aerospace Engineering and Technology
    • /
    • v.11 no.2
    • /
    • pp.208-215
    • /
    • 2012
  • The acoustic noise around a launch pad by launches of space launch vehicles was analyzed. The magnitudes of sound noise at some points near launch pad were predicted by locating the sound source at the exhaust jet plume of the rocket engine and considering several factors such as the directivity of the sound propagation and atmospheric attenuation. Specifically, the launch noise of Korea Space Launch Vehicle-I (KSLV-I) was estimated, and was compared to the actual measurement results. The analysis results proved to be heavily affected by the characteristics of directivity of sound propagation and the analysis showed good agreements with the measurements when the directivity of the sound was appropriately adjusted.

The Preliminary EMC Analysis Between the COMS RE and the GEO Launch Vehicles RS (통신해양기상위성 복사방출과 정지궤도 발사체 복사감응과의 전자파 적합성 해석)

  • Kim, Eui-Chan;Lee, Seung-Min
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.4
    • /
    • pp.774-778
    • /
    • 2010
  • In this paper, the preliminary EMC analysis process between the Communication, Ocean and Meteorological Satellite (COMS) and the Geostationary Earth Orbit (GEO) launch vehicles in the frequency range is described. The considered launch vehicles are Arian Ⅴ, Sea Launch, Land Launch, Atlas III&Ⅴ, Delta IV, Proton M/breeze M, Soyuz, H II-Aa. The launch vehicle Radiated Susceptibility (RS) specifications have been compared to COMS satellite Radiated Emission (RE) limits. The COMS Radiated Emission (RE) level is determined by calculating the radiated field equal to the quadratic sum of radiated emissions of each equipment switched "ON" during launch. As a result, The RS requirements of Arian V, Atlas III&V and Delta IV lauchers are compliant with COMS RE limits. The negative margins appear between the others launch vehicle RS (Sea Launch, Land Launch, Proton M/Breeze M, Soyuz and H II-A) and COMS RE. Then, if the launchers that have negative margin were chosen by the customer, The EMC tests should be performed at satellite level in order to demonstrate the compatibility with respect to launch vehicles requirements.

Range Safety Activities for the Launch of an Earth Observation Satellite

  • Im, Jeong-Heum
    • The Bulletin of The Korean Astronomical Society
    • /
    • v.37 no.2
    • /
    • pp.194.2-194.2
    • /
    • 2012
  • Korea Aerospace Research Institute has developed an earth observation satellite and it was launched into its orbit in 2012 by using a foreign commercial launch vehicle. The launch site authority has imposed safety requirements to the spacecraft developer to ensure the safety of the personnel and to protect launch vehicle, spacecraft and facilities from accidents associated with the satellite operation at the launch site. This paper describes the range safety activities implemented for the satellite and supporting equipments during the whole phase of their design, manufacturing/test and operation at the launch site. To ensure the integrated requirements for safety management and design, system safety program plan has been developed. And based upon the plan, spacecraft developer conducted hazard analysis to identify and establish safety requirements to reflect in designs, procedures, operations. The result of the hazard analysis has been complied into safety data packages and it was reviewed by launch site review board at the safety reviews and finally it was approved to launch.

  • PDF

Sensitivity Analysis of Major Cost Parameters on the Launch Cost of Reusable Vehicles (재사용발사체의 발사비용에 미치는 가격인자들의 민감도 분석)

  • Yang, Soo Seok
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.24 no.2
    • /
    • pp.35-42
    • /
    • 2020
  • Recently the reusable launch vehicle is being a major trend in the worldwide space market, because a few commercial companies, especially SpaceX, are trying to cut down the launch price through developing and succeeding the reusable launch vehicles. However, there is still a big controversy about whether in view point of the launch cost which is more favorable between expendable and reusable. Therefore, a study and close examination is required for the launch cost in the early development phase of the reusable launch vehicle. In this study the sensitivity analysis is performed with respect to the major cost parameters which have great effects on the launch cost and price. The standard vehicle of this sensitivity analysis is the expendable vehicle having a payload 20 tons. The cost estimation relationships used in this calculation are referred from the commonly proven cost models such as TRANSCOST. The major cost parameters chosen in this study are as follows: development cost, production cost, refurbishment cost, and maximum reusable number.

EMC Analysis between the COMS RS and the GEO Launch Vehicles RE (통신해양기상위성 복사감응과 정지궤도 발사체 복사방출에 대한 EMC 해석)

  • Kim, Eui-Chan;Han, Cho-Young;Lee, Ho-Hyung
    • Aerospace Engineering and Technology
    • /
    • v.8 no.2
    • /
    • pp.33-40
    • /
    • 2009
  • In this paper, the preliminary EMC analysis process between the Communication, Ocean and Meteorological Satellite (COMS) and Geostationary Earth Orbit (GEO) launch vehicles in the frequency range [1MHz-47MHz] is described. The launch vehicle Radiated Emission (RE) specifications have been compared to COMS satellite Radiated Susceptibility (RS) limits. The COMS RS limits are the RS qualification levels of COMS units during launch. The negative margins appear between land launch or soyuz launch vehicle RE and COMS RS. Then, if the land launch or soyuz is chosen by the customer, The tests should be performed at satellite level in order to demonstrate the compatibility with respect to launch vehicles specifications.

  • PDF

Effective Demand Lifting through Pre-Launch Movie Marketing Activities

  • Song, Tae Ho;Yoo, Shijin;Lee, Janghyuk
    • Asia Marketing Journal
    • /
    • v.18 no.3
    • /
    • pp.1-18
    • /
    • 2016
  • The purpose of this paper is to examine empirically how to balance advertising expenditure before and after launch with regard to the direction of word of mouth in the motion picture industry. The vector auto-regression model is applied to assess the dynamic impact of advertising and word of mouth on sales. Empirical data, including advertising, word of mouth, and sales (the number of entries) of 83 movies are used for analysis. The research results show that for a movie having more positive word of mouth in the pre- and post-launch periods, it is worthwhile to spend the advertising budget in the pre-launch period only and to spare it in post-launch period. However, it is worthwhile to spare the advertising budget in the pre-launch period for movies having less positive word of mouth before and after launch, and to concentrate spending in post-launch period instead. Mangers who handle products and services facing shortened lifecycles, such as games, eBooks, and digital music contents, need to check the quality of pre-launch word of mouth for their advertising budget decisions in the pre- and post-launch periods and spend more of the advertising budget in the post- (pre-) launch period if pre-launch word of mouth is negative (positive). For products and services with a shortened lifecycle, it is recommended to spend more of the advertising budget in the post- (pre-) launch period if pre-launch word of mouth is negative (positive).

Trend Analysis based Strategy Evaluation for Launch Vehicle Industry in Korea (한국의 우주발사체 산업 발전을 위한 우주발사서비스 시장진입 전략 평가)

  • Hong, Seulki;Ahn, Jaemyung
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.43 no.10
    • /
    • pp.936-942
    • /
    • 2015
  • This paper suggests the significant strategies and their priority to deal with space transportation market trends. First, market trends related with technical improvement and change in demand are analyzed by the literature research. The three key trends are obtained: 'Increasing Demand of High-Performance Launch Vehicles', 'Rising of Low-Price Launch Vehicles', and 'Rising of Dual/Multi-Launch'. And then, strategies for developing the launch vehicle industry in Korea are selected from several studies about commercialization of Korean launch vehicle. The strategies are evaluated by the experts through pairwise comparison matrix and the criteria for this process is how significantly does the strategy effect on the launch vehicle industry through market assessment. As a result, reliable order of priority among the strategies are obtained. Under the three key trends, strategy to enhance reliability is most important. And, strategy to have price competitiveness has secondary priority to deal with 'Rising of Low-Price Launch Vehicles' trend and 'Rising of Dual/Multi-Launch' trend. On the contrary, strategy of government's support is secondary under 'Increasing Demand of High-Performance Launch Vehicles' trend.

POST LAUNCH MISSION ANALYSIS FOR THE KOMPSAT-1

  • Lee, Byoung-Sun;Lee, Jeong-Sook;Kim, Jong-Ah
    • Journal of Astronomy and Space Sciences
    • /
    • v.17 no.2
    • /
    • pp.285-294
    • /
    • 2000
  • The post-launch mission analysis of the KOMPSAT-1 spacecraft was carried out. The injection accuracy of the Taurus launch vehicle was analyzed by comparison of the target and the realized orbit parameters. The tracking station contact analysis was also performed based on the state vectors applied at the day of launch. The offset angles between the predicted orbit and realized orbit were calculated for various tracking stations. The injection orbit parameters of the KOMPSAT-1 were analyzed for the possible options in Launch and Early Orbit Phase(LEOP) operations. Variations of the Local Time of Ascending Node(LTAN) were also obtained.

  • PDF