• 제목/요약/키워드: Late Requirements Engineering

검색결과 19건 처리시간 0.025초

Stakeholders Driven Requirements Engineering Approach for Data Warehouse Development

  • Kumar, Manoj;Gosain, Anjana;Singh, Yogesh
    • Journal of Information Processing Systems
    • /
    • 제6권3호
    • /
    • pp.385-402
    • /
    • 2010
  • Most of the data warehouse (DW) requirements engineering approaches have not distinguished the early requirements engineering phase from the late requirements engineering phase. There are very few approaches seen in the literature that explicitly model the early & late requirements for a DW. In this paper, we propose an AGDI (Agent-Goal-Decision-Information) model to support the early and late requirements for the development of DWs. Here, the notion of agent refers to the stakeholders of the organization and the dependency among agents refers to the dependencies among stakeholders for fulfilling their organizational goals. The proposed AGDI model also supports three interrelated modeling activities namely, organization modeling, decision modeling and information modeling. Here, early requirements are modeled by performing organization modeling and decision modeling activities, whereas late requirements are modeled by performing information modeling activities. The proposed approach has been illustrated to capture the early and late requirements for the development of a university data warehouse exemplifying our model's ability of supporting its decisional goals by providing decisional information.

IDENTIFICATION OF SOME FAILURE COSTS AND THEIR PERCEIVED ROOT CAUSES IN CONSTRUCTION

  • Saad Al-Jibouri;Martijn Oude Vrielink
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.184-189
    • /
    • 2009
  • In 2008 the total estimated failure costs in the Netherlands was estimated to be 11.4% of the industry's turnover compared to 7.7% seven years earlier. Failure costs can be the consequence of rework as a result of failure to conform to the product requirements and specifications or due to inefficient processes and bad management practices. Many construction companies however are unaware of the exact nature of these costs, their root causes or how to control them. This paper describes work carried out in the Netherlands to identify the different types of failure costs in construction and their root causes. The research described builds on previous findings by another research institution and expands it to include information collected from project cases and a survey of a number of project managers in the construction industry. The paper describes the analysis of the results from cases and the survey to identify the root causes of failure costs. Research shows, for example, that many failure costs are related to the client taking late decisions and making changes to the project requirements.

  • PDF

Content-based Configuration Management System for Software Research and Development Document Artifacts

  • Baek, Dusan;Lee, Byungjeong;Lee, Jung-Won
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • 제10권3호
    • /
    • pp.1404-1415
    • /
    • 2016
  • Because of the properties of software such as invisibility, complexity, and changeability, software configuration management (SCM) for software artifacts generated during software life-cycle has been used for guarantee of the quality of the software. However, the existing SCM system has only focused on code artifacts and software development document artifacts such as Software Requirements Specification (SRS), Software Design Description (SDD), and Software Test Description (STD). Moreover, software research-oriented project comes out late the code artifacts and the software development document artifacts. Therefore, there is a need for trace and management of software research document artifacts composed of highly abstracted non-functional requirements like 'the purpose of the project', 'the objectives', and 'the progress' before generation of the code artifacts and the software development document artifacts for a long time. Nevertheless, the existing SCM system cannot trace and manage them. In this paper, we propose content-based configuration management system comprised of the relevance link generation phase and content-based testing phase to trace and manage them. The preliminary application results show applicability and feasibility of the proposed system.

FPSO DPM 시스템 소개 및 초기 설계 시 고려사항 (Introduction of FPSO DPM System and Design Consideration Factor at the Early Design Phase)

  • 이충열;전광헌;이희성;권용락
    • 대한조선학회 특별논문집
    • /
    • 대한조선학회 2013년도 특별논문집
    • /
    • pp.97-102
    • /
    • 2013
  • As the offshore oil and gas upstream industry moves into deeper water, the FPSOs are the cost-effective solution. In the harsh environment such as in North Sea, station keeping and heading control capability obtained through the DP and Position Mooring (DPM) system of FPSOs play important roles to keep the safety. This paper introduces the concept, function and sub-system of the DPM systems which has been applied for the North Sea FPSOs since the late 1980s. The requirements and guidelines of some internationally recognized standards are also described, which are important to build the design basis at the early phases of the project.

  • PDF

기후변화에 따른 도시 수종의 기후 적합성 평가모델 - 서울시를 대상으로 - (Modeling the Present Probability of Urban Woody Plants in the face of Climate Change)

  • 김윤정;이동근;박찬
    • 한국환경복원기술학회지
    • /
    • 제16권1호
    • /
    • pp.159-170
    • /
    • 2013
  • The effect of climate change on urban woody plants remains difficult to predict in urban areas. Depending on its tolerances, a plant species may stay and survive or stay with slowly declining remnant populations under a changing climate. To predict those vulnerabilities on urban woody plants, this study suggests a basic bioclimatic envelop model of heat requirements, cold tolerance, chilling requirements and moisture requirements that are well documented as the 'climatic niche'. Each component of the 'climatic niche' is measured by the warmth index, the absolute minimum temperature, the number of chilling weeks and the water balance. Regarding the utility of the developed model, the selected urban plant's present probabilities are suggested in the future climate of Seoul. Both Korea and Japan's thermal thresholds are considered for a plant's optimal climatic niche. By considering the thermal thresholds of these two regions for the same species, the different responses observed will reflect the plant's 'hardening' process in a rising climate. The model illustrated that the subpolar plants Taxus cuspidata and Ulmus davidiana var. japonica are predicted to have low suitability in Seoul. The temperate plants Zelkova serrata and Pinus densiflora, which have a broad climatic niche, exhibited the highest present probability in the future. The subtropical plants Camellia japonica and Castanopsis cuspidata var. sieboldii may exhibit a modest growth pattern in the late 21C's future climatic period when an appropriate frost management scheme is offered. The model can be used to hypothesize how urban ecosystems could change over time. Moreover, the developed model can be used to establish selection guidelines for urban plants with high levels of climatic adaptability.

ISO 9001:2015 인증을 위한 리스크 기반 사고의 개념과 리스크 관리 (A Fundamental Concept of Risk-Based Thinking and Risk Management for ISO 9001:2015 Certification)

  • 김호균;강병환;박동준
    • 산업경영시스템학회지
    • /
    • 제40권3호
    • /
    • pp.38-48
    • /
    • 2017
  • ISO 9001 Quality Management Systems-Requirements has been revised in 2015. It has been updated four times since its publication in 1987. It is the most widely used International Standard in the world. There are over one million companies and organizations in over 170 countries certified to ISO 9001 from an ISO survey. Organizations are supposed to be certified to this new version by late 2018. The key changes in ISO 9001:2015 are to establish a High Level Structure (HLS) and focus on Risk-Based Thinking (RBT). Risk-Based Thinking means the process approach to decide how risk is addressed in establishing the processes to improve process outputs and prevent undesirable results. It pursues process planning and controls based on risks so that organizations can improve the effectiveness of the quality management system. It maintains and manages a Quality Management System that inherently addresses risks and meets objectives. In this article we firstly attempt to explain how to understand the fundamental concept of Risk-Based Thinking which is a systematic approach to consider risks rather than treating prevention as a separate component of a Quality Management System. We comment on the detailed requirements that contain risks in ISO 9001:2015 clauses. We also summarize recent advances on the risk assessment and management in line with ISO 31000:2009 Risk Management-Principles and Guidelines. We finally propose the practical risk management procedures for implementing ISO 9001:2015 with an emphasis on RBT. This article would contribute to help quality managers and practitioners convert to ISO 9001:2015.

고층 공동주택의 피난특성 및 관련 법규정에 관한 연구 (A Study on the Evacuation Character and Regulation for High-rise Apartment Buildings in Korea)

  • 이용재;이범재
    • 한국화재소방학회논문지
    • /
    • 제14권1호
    • /
    • pp.13-21
    • /
    • 2000
  • 공동주택이 등장한 이래 지속적으로 고층화하고 있다. 한편 고층 공동주택의 화재위험성 및 화재로 인한 피해의 규모는 더욱 증대되고 있으며 많은 문제를 유발하고 있다. 그러나 화재안전을 위한 현재의 방법론과 법규정은 최소한의 규정이다. 본 연구의 목적은 고층 공동주택에서의 화재시 피난 특성을 분석하고, 한국 미국 일본의 피난관련 법규정의 분석을 통해 그 개선안을 제안하였다. 결과적으로 화재로 인한 예측되는 피해를 최소화하기 위해 법규정 및 실질적인 피난안전성능에 관한 검토가 필요하다.

  • PDF

일제하 양배수장형 수리조합에서의 양수기술과 단위용·배수량의 변천 (리뷰 논문) (Transition of Pumping Technology, Irrigation Water Requirement, and Unit Area Drainage Discharge at Pumping Station-based Irrigation Associations in South Korea during Japanese Colonial Period (in Review))

  • 김진수
    • 한국농공학회논문집
    • /
    • 제63권3호
    • /
    • pp.59-73
    • /
    • 2021
  • The purpose of this study is to investigate transition of pumping technology, irrigation water requirement, and unit area drainage discharge at the Pumping station-based Irrigation Associations (PIAs) in South Korea during Japanese colonial period (1910-1945). The PIAs established pumping stations and embankments along rivers for the purpose of irrigation, drainage and flood prevention until the mid-1920s. From the late 1920s after major river improvement projects, newly established PIAs did not include the flood prevention in their purpose of establishment. The design criteria of the irrigation and drainage projects, such as irrigation water requirements, design rainfall, and allowable ponding duration were decided according to the circumstances of PIAs. The gross irrigation water requirement of paddy fields increased from the 1920s to the 1940s, and reached the level of 0.0020 m3/s/ha (19 mm/d) in the 1940s for the fairly good irrigation status in the drought. The great floods of 1930, 1933, and 1934 triggered the increase in drainage discharge in the late 1930s, leading to the unit area drainage discharge of 0.9-2.6 m3/s/km2 for natural drainage and 0.3-1.1 m3/s/km2 for pump drainage. Therefore, several PIAs near the major rivers could avoid repetitive floods damage.

Quantum-dot Cellular Automata 회로로부터 디지털 논리 추출 (Digital Logic Extraction from Quantum-dot Cellular Automata Designs)

  • 오연보;이은철;김교선
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년 학술대회 논문집 정보 및 제어부문
    • /
    • pp.139-141
    • /
    • 2006
  • Quantum-dot Cellular Automata (QCA) is one of the most promising next generation nano-electronic devices which will inherit the throne of CMOS which is the domineering implementation technology of large scale low power digital systems. In late 1990s, the basic operations of the QCA cell were already demonstrated on a hardware implementation. Also, design tools and simulators were developed. Nevertheless, its design technology is not quite ready for ultra large scale designs. This paper proposes a new approach which enables the QCA designs to inherit the verification methodologies and tools of CMOS designs, as well. First, a set of disciplinary rules strictly restrict the cell arrangement not to deviate from the predefined structures but to guarantee the deterministic digital behaviors. After the gate and interconnect structures of the QCA design are identified, the signal integrity requirements including the input path balancing of majority gates, and the prevention of the noise amplification are checked. And then the digital logic is extracted and stored in the OpenAccess common engineering database which provides a connection to a large pool of CMOS design verification tools. Towards validating the proposed approach, we designed a 2-bit QCA adder. The digital logic is extracted, translated into the Verilog net list, and then simulated using a commercial software.

  • PDF

MSCT: AN EFFICIENT DATA COLLECTION HEURISTIC FOR WIRELESS SENSOR NETWORKS WITH LIMITED SENSOR MEMORY CAPACITY

  • Karakaya, Murat
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • 제9권9호
    • /
    • pp.3396-3411
    • /
    • 2015
  • Sensors used in Wireless Sensor Networks (WSN) have mostly limited capacity which affects the performance of their applications. One of the data-gathering methods is to use mobile sinks to visit these sensors so that they can save their limited battery energies from forwarding data packages to static sinks. The main disadvantage of employing mobile sinks is the delay of data collection due to relative low speed of mobile sinks. Since sensors have very limited memory capacities, whenever a mobile sink is too late to visit a sensor, that sensor's memory would be full, which is called a 'memory overflow', and thus, needs to be purged, which causes loss of collected data. In this work, a method is proposed to generate mobile sink tours, such that the number of overflows and the amount of lost data are minimized. Moreover, the proposed method does not need either the sensor locations or sensor memory status in advance. Hence, the overhead stemmed from the information exchange of these requirements are avoided. The proposed method is compared with a previously published heuristic. The simulation experiment results show the success of the proposed method over the rival heuristic with respect to the considered metrics under various parameters.