• 제목/요약/키워드: Large tunnel

검색결과 896건 처리시간 0.024초

지하철 대단면 터널의 설계와 시공관리 사례 (Design and Construction of a Large Section Tunnel for a Subway Station)

  • 문상조;장석부;정준화
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 1999년도 봄 학술발표회 논문집
    • /
    • pp.285-292
    • /
    • 1999
  • Recent development cases of transportation utilities using tunnelling method in metropolitan sites have been increased due to the heavily complex environments and restrictions of construction works. The progress of tunnel design and construction to be supported by the tunnel analysis and measurement techniques using computers have increased adoptions of large section tunnels. In this paper, many factors to be considered in designing large section tunnels are discussed and the case of the construction of the subway station tunnel which is recently completed is introduced. This tunnel has a width of 24 m, a height of 16 m, and a excavation section area of 366 ㎡.

  • PDF

지하환기소 대단면 터널 시공 사례 연구 (A Case Study on the Construction of Large Cross Section Tunnel for Underground Ventilation System)

  • 노승환;최성욱;노상림
    • 터널과지하공간
    • /
    • 제27권4호
    • /
    • pp.195-204
    • /
    • 2017
  • 본 사례연구에서는 신림~봉천터널 지하환기소 대단면 터널의 시공 사례를 소개하였다. 환기갱(폭 7.8 m, 높이 6.6 m)에서 환기소(축류팬실, 폭 20.8 m, 높이 12.3 m)로 터널 단면이 확대되는 구간에 대해 안전성 및 시공성 등을 고려하여 점진적인 확대 굴착 방안 및 Q 시스템을 이용한 확폭 구간의 임시 보강 방안이 검토되었다. 확폭이 완료된 이후 대단면 터널은 현장의 암반조건을 확인하고, 전산해석을 이용한 터널의 안정성 검토 등을 통해 암반등급에 따라 굴진장을 일부 조정하고, 터널 상부 굴착을 분할 없이 전단면 굴착으로 변경하여 시공성을 향상시켰다. 본 사례연구에서 소개한 시공 사례가 향후 유사한 조건의 지하환기소 또는 4차로 도로 등의 대단면 터널의 설계 및 시공에 유용한 참고 자료가 될 수 있기를 기대한다.

Estimation of the excavation damage zone in TBM tunnel using large deformation FE analysis

  • Kim, Dohyun;Jeong, Sangseom
    • Geomechanics and Engineering
    • /
    • 제24권4호
    • /
    • pp.323-335
    • /
    • 2021
  • This paper aims to estimate the range of the excavation damaged zone (EDZ) formation caused by the tunnel boring machine (TBM) advancement through dynamic three-dimensional large deformation finite element analysis. Large deformation analysis based on Coupled Eulerian-Lagrangian (CEL) analysis is used to accurately simulate the behavior during TBM excavation. The analysis model is verified based on numerous test results reported in the literature. The range of the formed EDZ will be suggested as a boundary under various conditions - different tunnel diameter, tunnel depth, and rock type. Moreover, evaluation of the integrity of the tunnel structure during excavation has been carried out. Based on the numerical results, the apparent boundary of the EDZ is shown to within the range of 0.7D (D: tunnel diameter) around the excavation surface. Through series of numerical computation, it is clear that for the rock of with higher rock mass rating (RMR) grade (close to 1st grade), the EDZ around the tunnel tends to increase. The size of the EDZ is found to be direct proportional to the tunnel diameter, whereas the depth of the tunnel is inversely proportional to the magnitude of the EDZ. However, the relationship between the formation of the EDZ and the stability of the tunnel was not found to be consistent. In case where the TBM excavation is carried out in hard rock or rock under high confinement (excavation under greater depth), large range of the EDZ may be formed, but less strain occurs along the excavation surface during excavation and is found to be more stable.

벌크폭약을 이용한 대단면 장대터널 시공 사례 (The Construction of large and Long Tunnel Using Bulk Explosives)

  • 노상림;문상호;조영천;이상필;유지영
    • 화약ㆍ발파
    • /
    • 제22권3호
    • /
    • pp.65-70
    • /
    • 2004
  • 최근 신설되는 도로의 경우 고속화/직선화로 인하여 터널의 연장 및 평균터널 길이, 3차선이상의 대 단면 터널이 날로 증가하고 있어 이에 따른 굴착 효율 극대화가 필요한 시점에 있다. 사패산 터널은 약 4km의 4차선 대단면 도로터널로, 환경문제로 인해 늦춰진 공기를 단축시키기 위하여 터널 굴착 시 굴진효율에 가장 큰 영향요소인 굴진장과 여굴관리, 발파효율의 개선을 위한 다양한 신 공법이 적용되고 있다. 본 논문은 당 현장에서 시도되고 있는 신 공법 중, 새로운 형태의 폭약인 Bulk 폭약에 대하여 소개하고, Bulk 폭약의 대 단면 터널 적용에 대한 효율을 검증하고자 하였다.

Use of large-scale shake table tests to assess the seismic response of a tunnel embedded in compacted sand

  • Zhou, Hao;Qin, Xiaoyang;Wang, Xinghua;Liang, Yan
    • Earthquakes and Structures
    • /
    • 제15권6호
    • /
    • pp.655-665
    • /
    • 2018
  • Shield tunnels are widely used throughout the world. However, their seismic performance has not been well studied. This paper focuses on the seismic response of a large scale model tunnel in compacted sand. A 9.3 m long, 3.7 m wide and 2.5 m high rigid box was filled with sand so as to simulate the sandy soil surrounding the tunnel. The setup was excited on a large-scale shake table. The model tunnel used was a 1:8 scaled model with a cross-sectional diameter of 900 mm. The effective shock absorbing layer (SAL) on the seismic response of the model tunnel was also investigated. The thickness of the tunnel lining is 60 mm. The earthquake motion recorded from the Kobe earthquake waves was used. The ground motions were scaled to have the same peak accelerations. A total of three peak accelerations were considered (i.e., 0.1 g, 0.2 g and 0.4 g). During the tests, the strain, acceleration and soil pressure on the surface of the tunnel were measured. In order to investigate the effect of shock absorbing layer on the dynamic response of the sand- tunnel system, two tunnel models were set up, one with and one without the shock absorbing layer of foam board were used. The results shows the longitudinal direction acceleration of the model tunnel with a shock absorbing layer were lower than those of model tunnel without the shock absorbing layer, Which indicates that the shock absorbing layer has a beneficial effect on the acceleration reduction. In addition, the shock absorbing layer has influence on the hoop strain and earth pressure of the model tunnel, this the effect of shock absorbing layer to the model tunnel will be discussed in the paper.

지보공법에 따른 토사터널의 거동에 관한 수치해석 (Numerical Analysis on the Behavior of the Earth Tunnel due to Supporting Methods)

  • 김진태;박병수;정길수;유남재
    • 산업기술연구
    • /
    • 제24권A호
    • /
    • pp.239-250
    • /
    • 2004
  • Numerical analysis were performed to investigate the stability and internal movement of tunnel located beneath the base of abutment of bridge according to the method of supporting tunnel. Two supporting methods of the multi-staged grouting method with steel pipes and the large diameter of pipe supporting method were used in the centrifuge model tests. The slip form of model lining, specially built to simulate the process of tunnel excavating under the condition of accelerated g-level, was used in the centrifuge model tests. Four centrifuge model tests were performed, changing the supporting methods of the multi-staged grouting method with steel pipes and the large diameter of pipe supporting method and the location of model abutment base of bridge. For internal displacement of tunnel, movements of the crown. The left and the right sides of spring line were measured during the proceeds of excavating tunnel in centrifuge model tests. Test results were compared with numerically estimated values of internal displacement of tunnel by using the commercially available FEM software of PENTAGON-3D. It was found that they were in good agreements and the large diameter of pipe supporting method was more stable than the multi-staged grouting method with steel pipes with respect to the internal movement of tunnel.

  • PDF

Ray-Launching 기법을 이용한 2.6 GHz 대역의 터널 내 경로손실 특성 분석 (Path Loss Characterization in Tunnel Using Ray Launching Method at 2.6 GHz)

  • 김도윤;조한신;육종관;박한규
    • 한국전자파학회:학술대회논문집
    • /
    • 한국전자파학회 2003년도 종합학술발표회 논문집 Vol.13 No.1
    • /
    • pp.33-37
    • /
    • 2003
  • This paper presents the characteristics of large-scale fading in a tunnel environment. The Ray-Launching Method has been used to analyze the characteristics of the tunnel. For a curved tunnel, The concept of RDN (Ray Density Normalization) is introduced in order to obtain more accurate results. For our purposes, the structure of tunnel is assumed to be either a straight or curved tunnel having rectangular cross-section. A large scale fading has been presented shown in several tunnel cases.

  • PDF

대단면 터널 보강을 위한 운모편암 단층대 특성 분석에 관한 연구 (A Study on Analysis for the Characteristics of Fault Zone at Mica-schist for Reinforcement of Large-Span Tunnel)

  • 정회용;김영근;박연준;유광호
    • 터널과지하공간
    • /
    • 제19권2호
    • /
    • pp.132-145
    • /
    • 2009
  • 암반내 존재하는 단층은 암반의 거동에 미치는 영향이 매우 크기 때문에 암반사면, 터널과 같은 암반구조물의 설계 및 시공에 있어서 단층특성에 대한 조사는 무엇보다 중요하다 할 수 있다. 그러나 설계단계에서 이러한 특성을 파악하기에 한계가 있기 때문에 시공중 막장관찰과 추가지반조사를 통하여 터널주변에 존재하는 단층의 분포 및 공학적 특성에 대하여 조사하여야 한다. 본 연구에서는 운모편암지역에서의 대단면 터널 공사중 설계시 파악되지 않은 대규모 스러스트 단층대가 확인됨에 따라, 단층대의 특성을 규명하기 위하여 다양한 지질조사 및 현장시험을 실시하였다. 이러한 지반조사결과를 바탕으로 단층의 성인, 구조지질적 분포특성 및 단층암의 공학적 특성을 파악하였으며, 단층대 통과구간에서 안전하게 터널을 굴착할 수 있도록 합리적인 지보 및 보강대책을 수립하였다.

3아치터널의 지표면 침하에 관한 연구 (Study on Ground Surface settlement of a 3-Arch-shaped Tunnel)

  • 신강호;박두성;박오성;김재권
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 춘계학술대회 논문집
    • /
    • pp.1007-1013
    • /
    • 2004
  • A three-arch NATM tunnel with a total length of 53.5m has been constructed for a metropolitan subway station in Daejon, Korea. The tunnel, whose crown is located 22m below the ground, crosses the old Daejon station underneath. Since the tunnel comprises a very large section (10${\times}$28 m; largest in Korea), it shows complicated mechanical behaviors, especially near portal, due to its short length relative to width. As far as its construction step is concerned, the center tunnel is excavated with pre-excavated pilot tunnel, which is a unique feature of this tunnel (first in Korea) to secure safety during construction and prevent excessive settlements. The both side tunnels are then excavated along with the center tunnel. Since significant amount of settlement was predictable from the design stage, extensive monitoring was performed during construction. During excavation of the side tunnels, unexpected large settlements up to ${\~}$140mm (estimated 41.8 mm at design stage) was measured at the center tunnel. In this paper, we study the causes of this unusually large ground settlement. We believe that the extra-wide tunnel excavation increases the stress influence zone of portal in longitudinal direction and consequently add more settlements to the existing due to excavation and consolidation.

  • PDF

서울지하철 7호선연장 703공구 대구경 쉴드터널 설계 (Design of a large shield tunnel in Seoul subway line No.7 extension project(703 section))

  • 김용일;임종윤;정두석;이상한;황낙연;박광준
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2005년도 추계학술대회 논문집
    • /
    • pp.424-442
    • /
    • 2005
  • In this paper a design of a large shield Tunnel through weathered soil and weathered rock in 703 section of seoul subway line No.7 extension project is presented. The geological investigation results show that the projecet region consists mostly of weathered soil with some local weathered rock in the tunnel excavation level. A EPB shield TBM is selected as a optimal excavation machine for the large shield Tunnel considering the geological and site conditions. Also, the shield machine head and cutter for the large shield tunnel type are designed considering site geological conditions and average advance rate in similar projects.

  • PDF