• Title/Summary/Keyword: Large diameter pile

Search Result 109, Processing Time 0.03 seconds

A Case Study on the Dynamic Loading Tests of Large Diameter - Long Drilled Shafts into Weathered Rock (풍화암에 근입된 장대 현장타설말뚝의 동재하시험 사례연구)

  • Seok, Jeong-Woo;Cho, Chun-Whan;Ji, Wan-Goo;Park, Min-Cheul;Yoon, Jeoung-Seob
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.486-493
    • /
    • 2006
  • This paper deals with the procedure and the results on the dynamic loading tests of two large diameter - long drilled shafts (diameter=2.0m, length=75m) which were embedded into weathered rocks through thick soft marine clays and sandy gravels. Prior to the real dynamic loading test, the numerical simulation for the test procedure was performed to check the structural stability of the main pile body using equivalent static elastic analysis and the application of the hammer system using WEAP (Wave Equation Analysis of Pile Driving). Through these preliminary analyses the dynamic loading tests on large diameter - long drilled shafts have been successfully achieved.

  • PDF

Axial Load Transfer Behavior of a Large Diameter Drilled Shaft by Osterberg Type Load Test (오스트버그식 재하시험을 이용한 대구경 현장타설말뚝의 축하중전이거동)

  • 임태경;정창규;정성민;최용규
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2003.03a
    • /
    • pp.447-454
    • /
    • 2003
  • In this test, two separated oil jacks were placed at bottom of drilled shaft(D = 1,500mm, L = 33m), and maximum upward and downward load of 1,250 tonf was applied. Also, the deformable rod sensors were placed on each level, and axial strains at each level were measured. Because the side skin friction and the end bearing could be measured separately in the Osterberg type pile load test, this test might be more economical and more applicable than a conventional static pile load test. Thus, if this Osterberg type pile load test could be established during design stage, construction cost might be reduced and its application for large diameter pile could be enhance greatly.

  • PDF

A Study on Static Lateral Loading Test for Large Diameter Drilled Shaft Pile Considering the Pile Lead Fixity Conditions (말뚝두부구속조건을 고려한 대구경 현장타설말뚝에 대한 수평정재하시험 연구)

  • Lee, Min-Hee;Hwang, Geun-Bae;Jung, Sung-Min;Choi, Yong-Kyu
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.36-43
    • /
    • 2004
  • Most of pile foundations are fixed head condition, but lateral loading test for pile is performed under free head condition generally In this study, a lateral loading test for a large diameter drilled shaft was performed under the fixed pile head and the free pile head condition, where lateral displacement along the pile depth was measure. Test results and theoretical values were compared and analyzed.

  • PDF

Effect of slope with overburden layer on the bearing behavior of large-diameter rock-socketed piles

  • Xing, Haofeng;Zhang, Hao;Liu, Liangliang;Luo, Yong
    • Geomechanics and Engineering
    • /
    • v.24 no.4
    • /
    • pp.389-397
    • /
    • 2021
  • Pile foundation is a typical form of bridge foundation and viaduct, and large-diameter rock-socketed piles are typically adopted in bridges with long span or high piers. To investigate the effect of a mountain slope with a deep overburden layer on the bearing characteristics of large-diameter rock-socketed piles, four centrifuge model tests of single piles on different slopes (0°, 15°, 30° and 45°) were carried out to investigate the effect of slope on the bearing characteristics of piles. In addition, three pile group tests with different slope (0°, 30° and 45°) were also performed to explore the effect of slope on the bearing characteristics of the pile group. The results of the single pile tests indicate that the slope with a deep overburden layer not only accelerates the drag force of the pile with the increasing slope, but also causes the bending moment to move down owing to the increase in the unsymmetrical pressure around the pile. As the slope increases from 0° to 45°, the drag force of the pile is significantly enlarged and the axial force of the pile reduces to beyond 12%. The position of the maximum bending moment of the pile shifts downward, while the magnitude becomes larger. Meanwhile, the slope results in the reduction in the shaft resistance of the pile, and the maximum value at the front side of the pile is 3.98% less than at its rear side at a 45° slope. The load-sharing ratio of the tip resistance of the pile is increased from 5.49% to 12.02%. The results of the pile group tests show that the increase in the slope enhances the uneven distribution of the pile top reaction and yields a larger bending moment and different settlements on the pile cap, which might cause safety issues to bridge structures.

A Case Study on the Measurement and Estimation of Bearing Capacity of Large Diameter Bored Pile (대구경 현장타설말뚝의 지지력 측정 사례연구)

  • 이원제;정훈준;이우진;장기수
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.11a
    • /
    • pp.285-292
    • /
    • 2000
  • Though there has been increasing use of large diameter drilled shaft as a foundation structure of bridges, current practice for quality control is to confirm the minimum required load carrying capacity during construction stage. For economic and appropriate design of drilled shaft, it is necessary to evaluate the load transfer mechanism by pile load tests during initial stage of construction and to use the test results as a feedback to a revision of initial design. In this paper, results of load tests peformed at several domestic sites are presented to investigate the load transfer characteristics of large diameter drilled shaft. It was found that most of the load on piles is sustained by shaft friction and that only small portion of the load reaches the bottom of the drilled shaft. Some test results of drilled shaft by Pile Driving Analyzer performed at same sites are also presented to compare the load transfer characteristics interpreted from static pile load tests.

  • PDF

Prediction For Lateral Behavior of Group file Using P - Multiplier (P - multiplier 방법을 적용한 군말뚝의 수평거동 예측)

  • 김병탁;김영수
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.11a
    • /
    • pp.253-260
    • /
    • 2000
  • Pile foundations have been widely used in civil engineering construction for many years. Structures subjected to large lateral loads usually have pile foundations as shallow foundations cannot sometimes support the moments on these structure. The purpose of this paper is to propose the p - multiplier factor (P$\sub$M/) based on the characteristics of behavior of laterally loaded group pile in homogeneous sand. For this, a series of model tests are performed and the composite analytical method proposed by author is used to the propose P$\sub$M/. Based on the model test results of the large number of laterally loaded group piles, p - multiplier factors for homogeneous sand are proposed by back analysis under various condition of soil density, spacing-to-diameter ratio of pile, number of pile, and spacing-to-diameter of pile. P - multiplier approach provides a simple but sufficient tool for characterizing the shadowing group effects of laterally loaded group pile.

  • PDF

A Case Study of large diameter steel pipe pile Foundation for Offshore LNG Facility (해상 LNG 인수시설 대구경 강관말뚝 시공 사례 연구)

  • You, Dae-Young;Kim, Hyung-Wook;Jang, Woo-Young;Choi, Ki-Byung;Cho, Sung-Han
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.70-77
    • /
    • 2010
  • In this paper, a case study of drivability and bearing capacity of large diameter steel pipe piles at PTT LNG site in Thailand is introduced. The LNG facilities were designed to be founded on steel pipe pile foundations driven into the weathered rock formation overlaid by sand layers. The drivability analyses of open ended pipe piles were carried out using GRL WEAP program and the bearing capacities of the piles were estimated. Dynamic load tests were performed to evaluate end bearing resistance, and it is shown that the measured end bearing resistance is smaller than the calculated end bearing because the plugging does not develop sufficiently in case of large diameter pipe piles.

  • PDF

Drivability Monitoring of Large Diameter Underwater Steel Pipe Pile Using Pile Driving Analyzer. (수중 대구경강관말뚝의 항타관입성 모니터링을 위한 PDA 적용 사례)

  • Kim, Dae-Hak;Park, Min-Chul;Kang, Hyung-Sun;Lee, Won-Je
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.11-19
    • /
    • 2004
  • When pile foundation constructed by driving method, it is desirable to perform monitoring and estimation of pile drivability and bearing capacity using some suitable tools. Dynamic Pile Monitoring yields information regarding the hammer, driving system, and pile and soil behaviour that can be used to confirm the assumptions of wave equation analysis. Dynamic Pile Monitoring is performed with the Pile Driving Analyser. The Pile Driving Analyser (PDA) uses wave propagation theory to compute numerous variables that fully describe the condition of the hammer-pile-soil system in real time, following each hammer impact. This approach allows immediate field verification of hammer performance, driving efficiency, and an estimate of pile capacity. The PDA has been used widely as a most effective control method of pile installations. A set of PDA test was performed at the site of Donghea-1 Gas Platform Jacket which is located east of Ulsan. The drilling core sediments of location of jacket subsoil are composed of mud and sand, silt. In this case study, the results of PDA test which was applied to measurement and estimation of large diameter open ended steel pipe pile driven by underwater hydraulic hammer, MHU-800S, at the marine sediments were summarized.

  • PDF

Analysis of Plugging Effect for Large Diameter Steel Pipe Piles Considering Driveability (CEL Method) (항타시공성을 고려한 대구경 항타강관말뚝의 폐색효과 분석(CEL해석))

  • Jeong, Sang-Seom;Song, Su-Min;Ko, Jun-Young
    • Journal of the Korean Geotechnical Society
    • /
    • v.33 no.12
    • /
    • pp.21-33
    • /
    • 2017
  • This paper presents the analysis of plugging effect especially when the large diameter steel pipe pile was installed by considering driveability (BPM, blow per meter). The Coupled Eulerian-Lagrangian (CEL) technique was used to simulate the driving of open-ended piles into soil. To consider the driveability, the applied driving energy for each pile was obtained from the analysis results by using the wave equation. The parametric studies were performed for different pile diameters, penetration depths of pile, soil elastic modulus and BPM. It was found that the SPI is almost constant with increasing both the pile diameter and the required driving energy. It is also found that the plugging effect increases with increasing the pile length, resulting in the increase of lateral earth pressure. Based on this study the apparent magnitude and distribution of the lateral earth pressure is proposed for inside portion mobilizing soil plug.

Case study on the prediction of vertical and horizontal pile capacity using pressuremter test results (PMT결과를 이용한 말뚝의 연직 및 수평지지력 산정 사례 연구)

  • 김동철;최용규;정성기;정창규;이광욱
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.10a
    • /
    • pp.431-438
    • /
    • 1999
  • Vertical congressive and horizontal pile load tests were performed to a instrumented large diameter (D : 1,000 mm) drilled shaft. A drilled shaft was penetrated into the weathered soil and weathered rock. PMT was done for evaluation of properties for these strata. It was expected to be difficult to get undisturbed samples of weathered soils and rocks. Thus. PMT was done at the several selected depths. In those strata, to prevent the test bore hole from collapsing, bentonite slurry was used for making the test bore hole. In this study. soil properties was evaluated by means of PMT results and estimating method (direct method, the Memard method) of vertical pile capacity and horizontal pile behaviors were summarized. Also, vertical and horizontal pile capacity were calculated using PMT and pile load test results.

  • PDF