• Title/Summary/Keyword: Large Power System

Search Result 2,839, Processing Time 0.026 seconds

A study on aggregation method using relation index of state variables in the power system (상태변수들의 관계지수를 이용한 전력시스템 축약기법 연구)

  • Lee, Byung-Ha;Oh, Min-Hyuk
    • Proceedings of the KIEE Conference
    • /
    • 2006.11a
    • /
    • pp.339-341
    • /
    • 2006
  • Increasing interconnection of power plants in modern large electric power system has made power system dynamic studies much more complex. For effective analysis of the power system, model reduction and aggregation is required. In this paper, a new relation index is presented to identify the coherent generators in the large scale power system. In order to demonstrate the effects of this relation index, it is applied to a small scale power system of IEEE 39-bus test system and the simulation results are presented.

  • PDF

A Study on the Sparse Matrix Method Useful to the Solution of a Large Power System (전력계통 해석에 유용한 "스파스"행렬법에 관한 연구)

  • 한만춘;신명철
    • 전기의세계
    • /
    • v.23 no.3
    • /
    • pp.43-52
    • /
    • 1974
  • The matrix inversion is very inefficient for computing direct solutions of the large spare systems of linear equations that arise in many network problems as a large electrical power system. Optimally ordered triangular factorization of sparse matrices is more efficient and offers the other important computational advantages in some applications with this method. The direct solutions are computed from sparse matrix factors instead of a full inverse matrix, thereby gaining a significant advantage is speed and computer memory requirements. In this paper, it is shown that the sparse matrix method is superior to the inverse matrix method to solve the linear equations of large sparse networks. In addition, it is shown that the sparse matrix method is superior to the inverse matrix method to solve the linear equations of large sparse networks. In addition, it is shown that the solutions may be applied directly to sove the load flow in an electrical power system. The result of this study should lead to many aplications including short circuit, transient stability, network reduction, reactive optimization and others.

  • PDF

EMTP simulation of 345kv Substation in large network using newly developed Thevenin equivalent network (345kv 미금 변전소 외부 계통의 등가축약 기법을 이용한 EMTP 모델링에 관한 연구)

  • Jeong, Ki-Seok;Baek, Young-Sik
    • Proceedings of the KIEE Conference
    • /
    • 2008.11a
    • /
    • pp.244-246
    • /
    • 2008
  • EMTP-RV is the very powerful program to analyze the dynamic operation of the power system. To use this package in the large complex power system, it is very important to simplify the power system to simple equivalent network. In our study the 100 MVA STATCOM is placed at 345kV "MIGUM" which is the one of the 345kV substations of the Korean Electric Power System that is consist of more than 1000 bus. MIGUM substation is connected with 7 separated transmission lines to main Korean Electric power system. We developed a new method to simplify the network except the substation that we want to analysis. The power system outside the 345kV substation is modeled into the equivalent network. The loop network outside the substation can be modeled to simplified Thevenin equivalent network. The proposed method is applied to IEEE-14 Reliability Test System and the results shows the effectiveness of the method.

  • PDF

Large-scale AC/DC EMT Level System Simulations by a Real Time Digital Simulator (RTDS) in KEPRI-KEPCO

  • Park, In Kwon;Lee, Jaegul;Song, Jiyoung;Kim, Yonghak;Kim, Taekyun
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.3 no.1
    • /
    • pp.17-21
    • /
    • 2017
  • Recently, the Korea Enhanced Power system Simulator (KEPS) was upgraded with new processor cards and various peripheral devices. The purpose of the upgrade is for the large-scale AC/DC simulation studies for different purposes such as FACTS, PMU applications, and SPS. The need for such study is now growing in KEPCO network. Frequently, traditional ways of performing the necessary study had been found to be less adequate for guiding the key decisions in the company. Therefore, the growing needs, as well as the revealed inadequacy of the traditional system studies, had been attributing to the momentum for the upgrade project. This paper explains the details of the upgrade project. As an example of presenting the effectiveness of the upgraded RTDS system in KEPRI-KEPCO, a large-scale AC/DC real time simulation case which includes the entire Korean network and a planned MMC-HVDC system is introduced.

Design of online damage images detection system for large-aperture mirrors of high power laser facility based on wavefront coding technology

  • Fang, Wang;Qinxiao, Liu;Dongxia, Hu;Hongjie, Liu;Tianran, Zheng
    • Nuclear Engineering and Technology
    • /
    • v.53 no.9
    • /
    • pp.2899-2908
    • /
    • 2021
  • The laser transport system of the high power laser facility is mainly composed of large-aperture laser transport mirrors (TMs). Obtaining the high-resolution online damage images during the operation, which is of great significance for operating safely of the mirrors and the facility. Based on wavefront coding, pan-tilt scanning and image stitching technologies, an online laser-damage images detection system is designed, and it can achieve high-precision detection of surface characteristics of large-aperture laser transport mirrors. The preliminary simulation proves that the system can solve the depth of field matching problem caused by pan-tilt tilt imaging and achieve higher resolution.

Frequency Stability Enhancement of Power System using BESS (BESS를 활용한 전력계통 주파수 안정도 향상)

  • Yoo, Seong-Soo;Kwak, Eun-Sup;Moon, Chae-Joo
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.17 no.4
    • /
    • pp.595-606
    • /
    • 2022
  • Korea has the characteristics of traditional power system such as large-scale power generation and large-scale power transmission systems, including 20 GW large-scale power generation complexes in several regions with unit generator capacity exceeding 1.4 GW, 2-3 ultra-high-voltage transmission lines that transport power from large-scale power generation complexes, and 6 ultra-high-voltage transmission lines that transport power from non-metropolitan areas to the metropolitan area. Due to the characteristics of the power system, the penetration level for renewable energy is low, but due to frequency stability issue, some generators are reducing the output of generators. In the future, the issue of maintaining the stability of the power system is expected to emerge as the most important issue in accordance with the policy of expanding renewable energy. When non-inertial inverter-based renewable energy, such as solar and wind power, surges rapidly, the means to improve the power system stability in an independent system is to install a natural inertial resource synchronous condenser (SC) and a virtual inertial resource BESS in the system. In this study, we analyzed the effect of renewable energy on power system stability and the BESS effect to maintain the minimum frequency through a power system simulation. It was confirmed that the BESS effect according to the power generation constraint capacity reached a maximum of 122.81 %.

A Study on the Cost Hierarchical System of Nuclaer Power Plant Construction Project for Introcusting Earned Vaule Management System (성과관리시스템(EVMS) 도입을 위한 원전 건설사업비 관리체계 세분화 방안에 관한 연구)

  • Lee, Sang-Hyun;Kim, Woo-Joong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.230-231
    • /
    • 2019
  • The nuclear power plant construction project is large-scale, has various stakeholders and computer system, and is produced and managed a large amount of information. The domestic nuclear power plant construction project has accumulated data based on many years of experience in the system. It has the competitiveness to suggeest alternatives that meet the requirement of the client in the overseas nuclear power plant project. Earned value management, which integrates schedule and cost, is possible to risk management. It was developed the earned value management system considering the the actual data properties and types of the preceding nuclear power plant construction projects. It will be able to increase the nuclaer power plant export competieiveness. Therefore, it was palned to carry out future stuies so that it be able to complement the measure to integrate cost and schedule in consideration of actual data(quantity of activity, etc.).

  • PDF

A Study on the Optimal Design of Large-scale Photovoltaic Array (대용량 PV 어레이의 최적설계에 관한 연구)

  • Hwang, In-Ho;Kim, Eui-Hwan;Ahn, Kyo-Sang
    • Journal of the Korean Solar Energy Society
    • /
    • v.31 no.1
    • /
    • pp.8-14
    • /
    • 2011
  • Recently, a number of large-scale photovoltaic(PV) power generation system has been installed all over the world. Thus, in order to improve the system efficiency, the optimal design of the large-scale PV systems has become an important issue. DC cable loss of PV array is one of the design factors related to the system efficiency. This paper introduces the array design method of a 500kW Photovoltaic power plant. Three types of the PV array are suggested. Also, string cables, sub-array cables and array cables are designed within 1% of voltage drop in the line, and the DC cable losses are analyzed. The results of this paper show that the DC cable loss of large-scale PV array can be reduced by adopting a proper sub-array design method.

Vulnerability Assessment of a Large Sized Power System Using Neural Network Considering Various Feature Extraction Methods

  • Haidar, Ahmed M. A;Mohamed, Azah;Hussian, Aini
    • Journal of Electrical Engineering and Technology
    • /
    • v.3 no.2
    • /
    • pp.167-176
    • /
    • 2008
  • Vulnerability assessment of power systems is important so as to determine their ability to continue to provide service in case of any unforeseen catastrophic contingency such as power system component failures, communication system failures, human operator error, and natural calamity. An approach towards the development of on-line power system vulnerability assessment is by means of using an artificial neural network(ANN), which is being used successfully in many areas of power systems because of its ability to handle the fusion of multiple sources of data and information. An important consideration when applying ANN in power system vulnerability assessment is the proper selection and dimension reduction of training features. This paper aims to investigate the effect of using various feature extraction methods on the performance of ANN as well as to evaluate and compare the efficiency of the proposed feature extraction method named as neural network weight extraction. For assessing vulnerability of power systems, a vulnerability index based on power system loss is used and considered as the ANN output. To illustrate the effectiveness of ANN considering various feature extraction methods for vulnerability assessment on a large sized power system, it is verified on the IEEE 300-bus test system.

Fault Simulation and Analysis of Generator (발전기의 사고 시뮬레이션과 분석)

  • Park, Chul-Won;Oh, Yong-Taek
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.62 no.3
    • /
    • pp.151-158
    • /
    • 2013
  • Large generator of power plant is very important. In order to protect large generator from faults, digital protective relay or IED is required. However, all protective relays for generators of the domestic power plant are operated by foreign products. And now, for technological independence from foreign and improvement of import substitution effect, IEDs using domestic technology are being developed. To evaluate performance of developing next-generation power devices, the study of the dynamic characteristics of the power plant, generator system modeling, fault simulation and analysis, should be considered. Specially, To obtain IEEE Standards COMTRADE format for relay operation test, generator system modeling and fault simulation using PSCAD/EMTDC tools must be preceded. Until now, a complete modeling of generator internal windings and fault simulation techniques dose not exist. In this paper, for evaluation performance of relay elements of developing IED, the generator system modeling and various faults simulation using PSCAD/EMTDC tools were performed. And then, the various transient phenomena through obtained relaying signal of developed modeling were analyzed.