• Title/Summary/Keyword: Large Construction Company

Search Result 157, Processing Time 0.027 seconds

Establishing the Education Strategy in strengthening Construction Management's ability in Large-scaled Construction Company (대형시공사의 사업관리 역량 강화를 위한 교육 전략 수립에 관한 연구)

  • Kim, Sang-Chul;Park, Chan-Jeong;Lee, Sang-Youb;Son, Jae-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.5
    • /
    • pp.109-118
    • /
    • 2007
  • It is related to launch the CM market and to increase the profit and entire ability in company that is enforcing the ability of construction management in large-scaled construction company. According to the CM market in U.S, CM market is increased with competing to the companies, that is E&C, general contractor, design firm, specialized CM firm. Also domestic market is similar to US market. In this situation, large-scaled construction companies are filled with construction management ability for competing with foreign companies and domestic CM firms. This paper suggests how to enforce the construction management ability through education, and shows the detailed education strategy considered the fields, divisions and positions.

A Study on the Risk Management Strategy of the Large Scale Construction Company According to the Change of Real Estate Market (부동산시장 변화에 따른 대형건설사 리스크관리 방안에 관한 연구)

  • Lee, Yun-Hong;Ji, Kyu-Hyun
    • Land and Housing Review
    • /
    • v.9 no.1
    • /
    • pp.1-9
    • /
    • 2018
  • As the government announced Real Estate Policies on August 02, most areas except for Seoul cities face increasing business risks. Moreover, the government control over financial sectors' loan leads to the highly possible contraction of new distribution markets. The market trend could bring about the reduction of new demand in PF (Private Financing) business that large construction companies mainly concentrate on, and even the business already obtained has a high risk of being distributed, which could result in substantially low profitability. The currently unstable financial structure of most construction companies is caused by the hike of the prime cost of foreign plants except for that of a few construction companies. If PF (Private Financing) business also faces a difficult situation in such a financial condition, even large construction companies come to have the high possibility of a deficiency in credit rating. Accordingly, the major business that large construction companies concentrate on needs the sufficient business review. It is desirable to make a bid for business guaranteeing stability rather than business solely in consideration of profitability, when participating in a competition for a new construction contract.

A Relation between Financing Conditions and Business Operation of a Construction Company (자금조달환경과 건설업체 경영상태 간의 관계성 분석 연구)

  • Seo, Jeong-Bum;Lee, Sang-Hyo;Kim, Jae-Jun
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.12 no.1
    • /
    • pp.61-70
    • /
    • 2012
  • A construction project is very costly and takes a long time to make investment and yield profit. For this reason, financial institutions are cautious about financing construction projects. Meanwhile, a construction company needs financing from financial institutions to cover a large expense of a construction project. Thus, there is likely to be a close correlation between financing conditions and business operation of a construction company. To examine the relationship, variables were identified that are related to insolvency of a construction company and changes in financing conditions. The analysis period is between the second quarter of 2001 and the fourth quarter of 2010. Data was retrieved from TS2000 established by Korea Listed Companies Association (KLCA), Statistics Office, and Construction Economy Research Institute of Korea (CERIK). In terms of methodology, VECM (Vector Error Correction Model) was used to analyze dynamic relationship between changes in financing conditions and insolvency of a construction company based on the identified variables. The hypothesis was that changes in financing conditions would significantly affect business of a construction company, but, the analysis did not find a close relation between the two factors. However, it was shown that poor business of a construction company affects financing conditions adversely.

A Research Study on the Architectural Characteristics of old Samcheok Construction Company Housing in Donghae City -focused on A and No. 2·3 Houses as Registered Cultural Properties- (동해 구 삼척개발 사택의 건립과 건축적 특징에 관한 조사연구 -등록문화재 A호와 2·3호 사택을 중심으로-)

  • Kim, Tai-Young
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.17 no.1
    • /
    • pp.19-26
    • /
    • 2015
  • The old Samcheok construction company housing in Donghae City was built for employees of Nitrogenous lime factory with railway construction in 1939. The 31 company houses are arranged in a rows including a House A, two No. 2 and 3 Houses, a dormitory, 12 row houses of two households, and 15 row houses of four households. At present, they are preserved with prototype at that time of building as a private company. Researching the architectural characteristics from A and No. $2{\cdot}3$ detached houses of them, the results are as follows. The tea room, living room, and kitchen are centralized and connected with toilet, bathroom, and maid's room by corridor. The exterior wall was finished with paintwork on cement mortar on stud wall framing plastered. The key exterior elements such as diamond shaped asbestos slate, large openings, corner bay window, lintel cornice are in accordance with drawings that they were first designed. The wooden roof structure is based on the structure that supports transverse load with a beam and beam plate instead of thrust. The kitchen and toilet are remodelled and only seem to be a mere shadow of their former self, but the position of sink and toilet bowl is the same as before.

The Improvement Plan of Organization Management Through the Survey of Actual Condition in Construction Work (건설공사(建設工事) 실무분석(實務分析)을 통한 조직관리(組織管理) 개선방안(改善方案))

  • Choi, Byung-Ju;Cui, Xian;Choi, Suk-Woo;Kim, Ok-Kyue
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.2
    • /
    • pp.121-129
    • /
    • 2008
  • Domestic exoteric construction market by opening of world construction market with recent FTA of rapidly change. On these time, need quality increase of construction to possess government official and international competitiveness of customer satisfaction by offering consumer building of good quality. Therefore, must establish direction to inspects and must advance forward formation government official's present actual conditions for building company's QI. This study is as following if summarize studying result of formation government official to improve quality in construction spot. First, formation's CEO will for QI need side improvement the formation government official enemy by important thing. Second, at checking activity and systematic action that participate of responsible persons cooperation enterprise space-time by complete charge department organization should be achieved. Third, complete charge department for quality control operation large size construction firm substantially formation Organizational well operate, but heavy hydrogen building company was construed by greatly unprepared misgovernment. AHP analysis result complete charge department is serious necessity, and the CEO under direct control organizational structure was construed by thing which can bring excellent effect in operation management side of quality business side and formation. Therefore, heavy hydrogen building company should does to occupy competitive power high position with tissue at active quality complete charge deputy.

Effect of Welding Sequence on the Residual Stresses of Plate with Longitudinal Stiffeners

  • Kim, N.I.;Lee, J.S.;Choe, W.H.
    • International Journal of Korean Welding Society
    • /
    • v.4 no.1
    • /
    • pp.10-14
    • /
    • 2004
  • In this paper, a study on the residual stress of plate with longitudinal stiffeners is explained in terms of the welding sequences. In order to verify the results of numerical analysis, the hole drilling method (HDM) is performed, to measuring the residual stresses of the test plates in $CO_2$ Flux Cored Arc Welding (FCAW) under various welding conditions. The non-linear transient analysis technique for the numerical analysis in a large and complicate structure is considered. The residual stress of plate in consideration of the welding sequences and directions is evaluated by some numerical simulations and also by experiments. Comparison of numerical analysis results with experimental data shows the accuracy and validity of the proposed method.

  • PDF

Necessity to Install Integrated Control Tower for Overseas Energy Resources Acquisition and Securing Funds (해외에너지자원획득과 소요자금 확보를 위한 통합 컨트롤 타워 설치 필요성에 관한 연구)

  • Kang, Ji-Kwang;Lee, Jae-Heon
    • Plant Journal
    • /
    • v.6 no.3
    • /
    • pp.40-45
    • /
    • 2010
  • Necessity to install control towers has been studied to acquire overseas energy resources and to secure funds. At present, domestic energy companies do business independently. Institutions which support plant EPC companies as partners of package deal are separated. This causes the low records at package deal for overseas resources acquisition. Except UK and USA, nations which have major companies developed overseas energy resources early by promoting a large national company. Consequently, they currently have good records. This study suggests the necessities to install integrated control tower for overseas energy resources acquisition and securing funds and the following are the ways ; 1) promote a large national company by consolidation of separate energy companies, 2) install plant EPC promotion department which support private plant EPC companies, 3) make a integrated control tower in high level government office to connect between a large national company and plant EPC promotion department.

  • PDF

Impact of Fluctuations in Construction Business on Insolvency of Construction Company by Size (건설경기 변동이 규모별 건설기업 부실화에 미치는 영향 분석)

  • Lee, Sanghyo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.8
    • /
    • pp.147-156
    • /
    • 2016
  • This study analyzed the impact of changes in the construction business on construction company insolvency according to their size using the vector error correction model. First, this study applied EDF (Expected Default Frequency), which was calculated by KMV (Kealhofer, McQuown and Vasicek) model, as a variable to indicate the insolvency of construction companies. This study set 30 construction companies listed to KOSPI/KOSDAQ for estimating the EDF by size and construction companies were divided into two groups according to their size. To examine the construction business cycles, the amount of construction orders according to the type-residential, non-residential, and civil work- was used as a variable. The serial data was retrieved from TS2000 established by the Korea Listed Companies Association (KLCA), Statistics Korea. The analysis period was between the second quarter of 2001 and fourth quarter of 2015. As a result of calculating the EDF of construction companies by size, as it is generally known, the large-sized construction companies showed lower levels of insolvency than relatively smaller-sized construction companies. On the other hand, impulse response analysis based on VECM confirmed that the level of insolvency of large-scaled companies is more sensitive to business fluctuations than relatively smaller-sized construction companies, particularly changes in the residential construction market. Hence it is a major factor affecting the changes in insolvency of large-sized construction companies.

Assessing the Safety Performance of Domestic Small-Sized Construction Companies (국내 소규모 건설회사의 안전관리활동 평가)

  • Son, Chang-Baek;Hong, Sung-Ho
    • Journal of the Korean Society of Safety
    • /
    • v.24 no.4
    • /
    • pp.59-65
    • /
    • 2009
  • This paper presents the safety performance of domestic small-sized construction companies including the characteristic and current status of safety management actions of the firms. Safety performance both at the head office and job sites of each construction companies, which are divided two groups by construction capacity ranking, are investigated. The investigation results on the small-sized construction companies in this study was compared with those of on the large and medium-sized construction companies studied in existing papers. General recognition that there is a wide difference of safety performance among domestic construction companies by construction capacity ranking was companies by this study. Especially, Data analysis shows that the safety performance of the small-sized companies has the larger difference than large and midium-sized companies.

The Study on Problems in Bidding Guideline and Suggestion for Improvement in Architectural Turnkey project in Construction - Focused on Preventing Claim- (건축턴키공사 입찰안내서의 문제점과 개선방안에 관한 연구 - 클레임예방을 중심으로 -)

  • Yoon Jun-Seon
    • Journal of Arbitration Studies
    • /
    • v.15 no.3
    • /
    • pp.303-324
    • /
    • 2005
  • Turnkey project in construction which accounts for about $10\%$ of the total annual construction orders in the nation is expected to grow in size as an effort to strengthen international competitiveness and improve quality of construction work. However, problems of turnkey project in construction raise concern for many possible cases of possible claims. Based on the understanding that bidding guidelines which plays a critical role in turnkey project in construction actually contain some unequal clauses and causes for problems which undermine development of turnkey construction and further create possible cases of claims, the paper aims to identify and analyze the unequal clauses and problems contained in the guidelines in order to make suggestions for improvement. Among all the turnkey construction orders that has been placed since 2000 when domestic turnkey project in construction became relatively formulated, 13 constructions costing more than 50 billion won were selected for this study since their construction scale were large enough that the bidding guidelines for them were regarded as containing little difference among one another. In order to enhance construction technology and to prevent claims while trying to achieve the original purpose of Turnkey system, the parties involved in or schedule to take part in Turnkey project including ordering institution, Construction Company and Design Company should make an effort to have more reasonable bidding guidelines drawn up.

  • PDF