• Title/Summary/Keyword: Landscape planning and construction

Search Result 251, Processing Time 0.032 seconds

Suzhou Historical Gardens and City′s Sustainable Development

  • Huang, We
    • Journal of the Korean Institute of Landscape Architecture International Edition
    • /
    • no.1
    • /
    • pp.127-130
    • /
    • 2001
  • Suzhou historic gardens include classical gardens, places of interest and palaces built by hills and waters. They are geographically distributed in the ancient city and the suburbs. Considered as both chinese and world class historic cultural heritage, these precious tourist resources have been included in the systematic urban planning of Suzhou and they are an integral part of the urban green plan and symbol and characteristic of the urban view. These gardens are also important for tourist industry-one of the pillar industries Suzhou. Therefore, historic gardens play an especially important role in the city's continuous development and it becomes an important task to make good protection, planning, construction and management of these historic gardens.

  • PDF

The Sustainable Management of Historic Landscape about Historic City in China - Centering around the Case of Beijing - (중국 역사도시의 지속가능한 역사경관 관리 - 북경시를 중심으로 -)

  • Kang, Tai-Ho;Xu, Huan
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.29 no.4
    • /
    • pp.87-97
    • /
    • 2011
  • The main objective of this study is to analyze the sustainable development of the landscape management system for the historic city of China, and to find out the implications to historic city in our country. Firstly, this study introduces the karrimor of historic city in China and the evolution of historic landscape management policy, and then analyses the main content of the historic landscape management system with Beijing, for example: "the protection planning of historic city", "the protection and construction planning of historic city in twelfth five-year plan", "the comprehensive planning of Beijing", and lastly suggests the way of sustainable development for historic landscape management of Beijing. In Beijing, three are three different levels of landscape management system, cultural properties(individual), historic districts(area), and historic city(as a whole) on the basis of the landscape management for historic city. The sustainable development of the historic landscape management system in Beijing gives meaningful implications to historic cities in Korea.

A Survey on the Traditional Walls and Roofs Maintenance and the Rural Residents' Attitudes toward the Direct Payment Program for Traditional Walls and Roofs (전통담, 전통지붕 관리실태 및 경관보전직접지불제 적용에 대한 주민의식 조사 연구)

  • Chae, Hye-Sung;Min, So-Young;Ryu, Sun-Jung;Ahn, Tong-Mahn
    • Journal of Korean Society of Rural Planning
    • /
    • v.14 no.4
    • /
    • pp.57-67
    • /
    • 2008
  • The Direct Payment Program for Rural Landscape Conservation (DPPRLC), introduced by the Korean government, currently offers subsidies to rural villages to encourage the growing of flower crops or wild flowers instead of common grain. However, in many of these villages, major landscape elements like walls and roofs of houses are built with cheap, urban materials, and kept in poor condition. This is a poor reflection of the DPPRLC goal to improve the aesthetic of korean rural landscape. This study surveyed and analyzed traditional style walls and roofs in ten selected villages taking part in the DPPRLC program. Villagers were interviewed for a proposed direct payment program for building and maintaining traditional walls and roofs. Major findings are: First, more than 86% of residents are willing to build and maintain traditional walls if subsidies are given. They would like to be reimbursed 75% to 100% of construction and maintenance costs. Second, about 64% of residents would be willing to build and maintain traditional roofs with the subsidies. They also would like to receive 75% to 100% of construction and maintenance costs. The policy implication of this study is that extending the DPPRLC program to include walls and roofs in rural villages will make rural landscape more attractive.

Master Plan for Jeju Sanghyo Botanical Garden using local landscape resources (지역경관자원을 활용한 제주상효식물원 계획)

  • Park, Eun-Yeong;Yoo, Byung-Rim
    • Journal of Korean Society of Rural Planning
    • /
    • v.15 no.4
    • /
    • pp.173-182
    • /
    • 2009
  • This study is a plan for the Jeju Sanghyo Botanical Garden construction, and it is prepared to maintain the identity of the local landscape by composing the garden using the local landscape resources. The goals of becoming one of world's best, garden centered botanical garden and at the same time one that represents culture of Jeju. Unusual species are included in the collection and with the general collection, special collection and exhibition by different kinds are planned to be offered to the public. The garden will demonstrate the world's various types of gardens in a compressed way. It is our endeavor to become center of culture beyond plant education and exhibition, drawing a large number of people to our garden. Moreover, conservation of Jeju's unique botanic resources will be carried out and the garden will show the garden culture. Due to the size of the site, different themes will be exhibited in one zone in a parallel. Unique combination of each local landscape resource will create own theme. The display will be divided into three different stages: the 1st stage is an educational exhibition, assisting more understanding of distinguishing different locations, the second is exhibition by various species and the final stage will show an ideal way to develop a garden with harmony of various plant species.

Growth Degree of Quercus Community Plantations for Effective Vegetation Restoration (효과적인 식생복원을 위한 참나무류 군락 식재의 생장량에 관한 연구)

  • Mi-Jin Kim;Eun-Suk Cho;Hee-Jeong Jeong;Dong-gil Cho
    • Journal of Environmental Science International
    • /
    • v.32 no.3
    • /
    • pp.161-171
    • /
    • 2023
  • The present study evaluated growth factors affecting oak community plantations through literature review and a field survey. Specifically, 41 related literature sources were analyzed and field surveys were conducted to collect growth data. Previous studies were analyzed to identify variables with high frequency of use. The frequency of use was in the order of tree size > environment > planting density > forest age. Analysis of factors impacting height and diameter growth revealed that the growth rate of species other than Quercus variabilis was negative in the field survey. This may be because of differences between the actual trees planted and specifications in the construction drawings, which may be attributed to the site conditions and decisions made by the project subject during construction. Furthermore, simple linear regression analysis was conducted with time, height at planting, density, and species code as the independent variables and growth rate as the dependent variable. A strong positive linear correlation was noted between height and diameter. This work builds a foundation for developing a forest restoration model and simulation program based on a regression model derived from the four variables tested.

Lessons Learned during the Early Phases of a Modular Project: A Case Study of UNLV's Solar Decathlon 2020 Project

  • Choi, Jin Ouk;Lee, Seungtaek;Weber, Eric
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.543-550
    • /
    • 2022
  • The U.S. Department of Energy conducts the Solar Decathlon competition as a student-based achievement that encourages sustainable design with energy efficiency and solar energy technologies. In the 2020 competition, the University of Nevada, Las Vegas (UNLV) team designed, fabricated, and constructed a net-zero modular house that applies innovative and highly efficient building technologies. This paper focused on the lessons learned during the early phases of this ongoing modular project. The research methodology included obtaining feedback from key project participants using a well-structured questionnaire. The results showed that the major items/challenges in the project's planning phase included selecting the modular size, planning the construction system, planning the materials and procurement, estimating costs and duration, selecting a fabricator, collaboration and communication, safety, and planning module transportation. These findings will help modular practitioners and future Solar Decathlon competition participants better understand how and what factors they should consider most during the early phases through the lessons learned.

  • PDF

A Study on the Establishment of Visual Landscape Impact Factors for Natural Landscape Management (자연경관관리를 위한 시각적 경관영향 요소 설정에 관한 연구)

  • Shin, Min-Ji;Shin, Ji-Hoo
    • Journal of Korean Society of Rural Planning
    • /
    • v.24 no.4
    • /
    • pp.135-146
    • /
    • 2018
  • A Visual landscape planning and management system has been introduced and implemented by each ministry so as to solve the problems of visual landscape destruction due to recognition on the value of natural landscape of beautiful territory and various development projects. At present, this system emphasizes the importance of the visual and perceptual aspect of the landscape however, there is a lack of techniques required for comprehensively predicting, evaluating, and managing it. Furthermore, sustainable landscape management after the completion of development projects has been inadequately carried out, as the focus has been only on consultation in the planning process of the development project in institutional performance. To this end, we presented objective and standardized criteria to predict and judge the effects of development projects on landscapes before project implementation. During the implementation of the development project, the influence of the visual landscape becomes accumulated in the construction progress stage. There is a need to identify the main viewpoints and to examine the continuous changes in the landscape-influencing factors, owing to the remarkable influences on the landscape, such as the change in the topography and the change caused by the artificial structure. During the stage of managing the influence on the visual landscape after the completion of the project, the influence on landscape should be monitored by measuring the change in the continuous landscape-influencing factors and determining the extent to which the actual reduction plan has been implemented. These processes should be performed continuously to maintain the quality of the visual landscape. The change in the landscape caused by the development project is shown to cause relatively greater visual damage than other factors composing the landscape owing to the influence of the artificial factors including the structure or the building. This shows that not only detailed examination of the visual impact before the development project but also continuous management is required during and after the development project. For this purpose, we derived eight landscape-influencing factors including form/shape, line, color, texture, scale/volume, height, skyline, and landscape control point. The proposed considering to be of high utilization in that it has a clear target of the landscape influencing factors.

Comparative Studies of Standard of Estimated Unit Manpower and Material of Landscape Architecture Construction in Korea and Japan (조경공사 표준품셈의 한·일간 비교 연구)

  • Yun, Ju-Cheul;Lee, Kwan-Hee
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.29 no.3
    • /
    • pp.154-158
    • /
    • 2011
  • This research was carried out to compare the standard of estimated unit power and material in landscape architecture construction between Korea and Japan. It has also been done to offer a practical and reasonable information to Korea landscape architecture industry. The research results are as follows. First, both Korea and Japan's standard of estimated unit power and material in landscape architecture construction are part of civil construction. Second, Korea's detailed type of construction is centered on plant's type and size while Japan's centered on architectural construction. Third, Korea's standard of estimated unit power and material are composed of workforce construction, mechanical construction and addition of soil. On the other hand, Japan's estimated unit power and material are composed of workforce construction, time of transportation, date of transportation. Fourth, the planting specification of Korea seems to be more in detail than that of Japan, Japan's showing a wider implication. Fifth, when comparing the information regarding standard of estimated unit power and material between Japan and Korea, transportation, independent stalking for plant, soil for landscape architecture is difference between the two countries. On the base of this research results, Korea's standard of estimated unit power and material in planning construction should be more elastic in its implication and independent standard of estimated unit power and material in landscape architecture construction. Also, examination of transportation, independent skating for plant and soil for landscape architecture should be done in order for better improvements.

Analysis of Students' Perception of Landscape Construction Education (조경시공과목 교육에 대한 학생들의 인식 분석)

  • Park, Jae-Young;Kwon, Jin-Wook
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.45 no.4
    • /
    • pp.92-103
    • /
    • 2017
  • As a professional occupation, landscape education focuses on fostering professional human resources and is one of the major axes of the landscape industry. In this study, a survey of landscape students on their learning and pedagogics was conducted with the aim to present basic information for the improvement of teaching on landscape construction. A total of 348 people answered 14 questions in the category of the impression of landscape construction classes included in the questionnaire. The results showed that the students found landscape construction classes academically important and recognized the necessity for completing these classes, but they were not satisfied with the learning environments and pedagogics used in these classes. They found what they learned not readily applicable to actual practice and saw these classes as part of their preparations for the landscape engineer qualification test. Their demands in relation to the classes included field practice-oriented teaching and participation in various programs for field practice, which highlights the necessity for human resource management-oriented classes that cover planning, design, construction, and management. Challenges in relation to field practice included the provision of environment, for example offering a variety of opportunities and improving treatment in practice. This study has significance in that it analyzed the views of students and discussed directions for future improvement since there is a lack of studies and discussions about education in the field of landscape construction. This study also has a limitation that only four-year universities were included in the study. Comprehensive studies including investigating junior college and graduate school curricula and case studies of landscape construction curricula overseas are needed in the future.

A Study on the Over-layered Landscape Characteristics of Ipsan Village, Uiryeong Area (의령 입산마을의 중층적 경관 특성)

  • Lim, Eui-Je;So, Hyun-Su;Bae, Su-Hyun
    • Journal of Korean Society of Rural Planning
    • /
    • v.24 no.1
    • /
    • pp.113-127
    • /
    • 2018
  • This study comprehends that the landscape of Ipsan Village is the accumulated output of the landscape management and social behavior by the historic personages through the reference research and field surveys. And the study sorted out the over-layered landscape characteristics of Ipsan Village by analyzing the dispersed landscape elements as follows. First, right before the start of Japanese invasions to Korea(1592-98), Tamjin(耽津) An(安) Family moved into Ipsan and started establishing the a single clan village. At a site with mountain background and facing the water(背山臨水), the village used to be a typical farming one with an organically planned road-system and housing area following the traditional order. However, the landscape has changed drastically since the 20th century with the construction of banks, roads and readjustment of arable land etc. Second, the original landscape, which can be figured out through the 'Gosanjaesibyukgyeong(高山齋十六景)' in the 18th century, shows its harmony with natural landscape: mountain & valley, stream & field, traditional trees, etc, cultural landscape: village, well, spring, etc, and momentary landscape: seasons, time, weather phenomena, sound, behavior, etc. Third, based on the second, 16 natural landscape elements: mountain & stream, planting, etc. and 25 cultural landscape elements: housing spaces, self-cultivation & ceremony spaces, community spaces and modern education & enlightenment spaces were selected and interpreted as landscaping meanings. Fourth, the over-layered landscape which stems from the compositive functions and inter-connectivity of landscape elements which consists Ipsan Village is regarded as 'Natural geographical and Fungsu landscape', 'Rural production and livelihood landscape', 'Confucian ceremony and symbolic landscape' and 'Modern education and enlightenment landscape.'