• Title/Summary/Keyword: Landscape Architecture Construction Project Management

Search Result 45, Processing Time 0.031 seconds

The Residents' Perceptions on the Revitalization Project of Rural Centers Utilizing IPA - The Case of Janggye-myeon of Jangsu-gun - (IPA를 활용한 농촌중심지 활성화 사업에 대한 거주민 인식 - 장수군 장계면을 중심으로 -)

  • Kim, Young-Jin;Son, Yong-hoon
    • Journal of Korean Society of Rural Planning
    • /
    • v.23 no.3
    • /
    • pp.133-145
    • /
    • 2017
  • The purpose of this study is to assess residents' perception of the revitalization projects of the rural center and to evaluate their views of the projects' importance and their levels of satisfaction with how they have been carried out. In this study, we measured the residents' perceptions and preferences regarding these projects by using Importance-Performance Analysis (IPA). Results showed that residents' perceptions and satisfaction were the highest for the projects providing welfare facilities, even though this project has little relevance to the overall project goal. Residents were dissatisfied with construction projects such as the building of cultural facilities and urban parks, even while recognizing their importance. It is necessary to establish what problem the people perceive and to manage them appropriately. Next, the residents did not appreciate the community empowerment projects, nor did they evaluate the contents of the program positively. It can therefore be seen that the community empowerment projects have not been carried out well. Finally, the street landscape improvement project was not successfully implemented compared to other projects. The residents have negatively perceived the installation of facilities that they do not want, rarely use, or are poorly operated. this shows that the evaluation of residents is significant. They become the users of the revitalization project for the rural center. It is necessary to overcome problems such as project items chosen by professionals without local consultation and obvious design in the revitalization project of the local center. There is a need to ascertain the residents' opinion of each project and to encourage them to participate directly in the management operation.

A Study on the Improvement of Laws Related to the Safety Management of Children's Play Facilities (어린이놀이시설 안전관리법규의 개선방향)

  • Lee, Sang-Suk
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.37 no.2
    • /
    • pp.47-61
    • /
    • 2009
  • The purpose of this study was to understand the laws related to the safety management of children's play facilities(LRSMCPF) including the "Safety Supervision Law of Children's Play Facilities(SSLCPF)" and the "Quality Management and Industrial Products Safety Management Law(QMIPSAL)", in order to analyze the problems by 4 phases-development of products, landscape design, landscape construction and maintenance considering landscape project procedure-and to propose a revision of the laws. The results are as follows: 1. The various LRSMCPF, SSLCPF and QMIPSAL, as basic laws for the safety management of children's play facilities, were insufficient regarding the features of children's play facilities and play spaces, which are both comparatively varied and complex. 2. In development of products, the one-year duration of safety certification based on QMIPSAL was too short and the procedure for safety certification were redundant in both products and plants inspection, and export and import product inspection. 3. The field inspection of construction sites based on SSLCPF was repeated with quality control and a consultation of rules based on "Construction Technology Management Law". 4. There are not enough safety inspection organizations regarding children's play facilities to meet the demand of safety certification, safety inspection, and safety education in the near future. 5. For children's play safety, the establishment of a general safety management system for children's play connected with the phases is needed to ensure safe play equipment, to construct safe playgrounds, and to manage play facilities. The criteria, regulations, and procedure regarding safety certification and safety inspection of play facilities must be revised efficiently and standardized to a global level as well. To improve the system and contents of safety certification and inspection, authorization of safety inspection organizations based on landscape architecture is needed. Further study will be required to concretely analyze in detail the laws, enforcement decrees and rules, and ordinances that consider the practical experience of professional landscape architects, inspectors, and lawyers.

Community Participatory Neighborhood Park Design -In the Case of Yangi Park in Sadang-dong, Seoul- (주민참여에 의한 마을마당설계 -서울 동작구 사당동 양지공원-)

  • 김성균
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.29 no.3
    • /
    • pp.61-69
    • /
    • 2001
  • This paper presents a case of community participatory neighborhood park design. The site, Yangji park, is located in Sandang-dong, Dongjak-gu, Seoul and the area is about 1,870m. Neighborhood park is defined as an outdoor space which is close to people´s home and is considered to be their own, because of the residents´ collective responsibility, family association, and frequent shared use. It is a place for pleasant rest area for community, sharing a sense of nature and retaining a sense of tradition and culture which is disappearing in a city. It is related to the daily life of the people near the site and becomes a place to let the community increase dialogue and understanding between people. On the other hand, participatory design is a design in which people participate in the design process. Thus people can understand the project well, present their opinions better, and reconcile conflicts between the different interests of people. This design applied a community participatory design method to design a neighborhood park. The major strategies for participatory design were ´workshop´, ´card game´, ´walking site´, ´interview´, and ´questionnaire´. Eight workshops were performed for the participation design. The major spaces and facilities elected by participants were the ´main entrance plaza´, ´entrance symbol space´, ´children´s ´playground´, ´multipurpose sport ground´, ´grass land´, ´foot-pressure area´, ´spaces symbolizing a rock mountain and an old well´, ´space for youth´, ´a pavilion´, etc. From this selection, design concept alternatives were generated by participants. The aster plan was developed from these design alternatives with the help of landscape architects. It was revised by ist visits and community discussions. People were also involved in the construction process and left their own works, such as hand prints, on the site. After construction, residents continued to maintain the park by themselves. As a result, It was found that participatory design was very effective for people´s satisfaction and sustainable park management. By involving people more in the process they developed a sense of community, a sense of ownership, and attachment to the place. In conclusion, it is suggested that we need to develop an effective people´s participation method to Korean society.

  • PDF

A Theoretical Study on the Wildlife Passage for Connecting Fragmented Habitat(I)- In the case of Wildlife Passage Types and Design Process (분절된 서식처의 연결을 위한 생태이동통로에 관한 이론적 연구(I) - 유형구분 및 조성절차를 중심으로 -)

  • 김귀곤;최준영
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.26 no.2
    • /
    • pp.293-307
    • /
    • 1998
  • This study has been divided into two parts, 1) literature review and 2) a case study. Based on literature review and case studies found in Korea and abroad, this study aimed at classifying wildlife passages and establishing their development procedures in order to establish a theoretical ground for the development of wildlife passage as a way to link habitats that have been fragmented by the construction of roads and other developments. The results of the literature review are as follows : 1) Impact of road construction on surrounding ecological environment is found in various aspects. Along with damage of habitats as direct impact, decrease of biodiversity and simplification of species due to limited breeding and movement are cited as possible indirect impact. 2) In order to lessen the impact generated from fragmented habitats, various types of wildlife passage are being developed in Europe and are showing positive results. 3) In Korea, interests on animal passages have been rising recently. The ministry of Environment and local authorities are establishing development plans for the passages. However, practical materials on the usefulness of adoped methods are not available.4) In order to create an effective wildlife passage, decisions have to be made first on basic factors of planning and designing such as ecosystem rehabilitation methods and surveys on wildlife movement routes and habitat environment. Based on this, in a planning and designing stage, the location and type of a passage, size and measures to attract animals and prevent a collision need to be finalized. This should be followed by a series of process of maintenance, management and monitoring after the development. Based on the results of a theoretical study to develop an wildlife passage, Part 2 of this study deals with the results of an experiment through a specific planning and design that includes a process of ecological surveys, site selection, type selection, ecosystem infrastructure, planting design and construction details on an actual study area and presents them as a model project.

  • PDF

The Actual Conditions and Improvement of the Eco-Forests Mater Plan, South Korea (우리나라 생태숲조성 기본계획 실태 및 개선방향)

  • Heo, Jae-Yong;Kim, Do-Gyun;Jeong, Jeong-Chae;Lee, Jeong
    • Korean Journal of Environment and Ecology
    • /
    • v.24 no.3
    • /
    • pp.235-248
    • /
    • 2010
  • This study was carried out to the actual conditions and improvement of the eco-forests master plan in South Korea, and suggested its problems and improvement direction. Results from survey and analysis of limiting factors or constraints in the construction plans of eco-forests in Korea revealed that there were highly frequent problems involving site feasibility, topographic aspect, and existing vegetation. The results of survey on the status of land use indicated that the average ratio of the use of private estate was 29.7%, so then it was estimated that a great amount of investment in purchase of eco-forest site would be required. Results from survey on major introduced facilities showed that there was high frequency of introduction of infrastructure, building facility, recreational facility, convenience facility, and information facility, and that there was low frequency of introduction of plant culture system, ecological facility, structural symbol and sculpture, and the likes. There was just one eco-forest park where more than 500 species of plants grew, and the result of investigation indicated that the diversity of plant species in 11 eco-forest parks was lower than the standards for construction of eco-forest. Results from analysis of the projects costs revealed that investment cost in facilities was higher than planting costs, and that a large amount of investment was made in the initial stage of the project. There was no planned budget for the purpose of cultivating and maintaining the plants and vegetation after construction of eco-forest. The basic concepts in construction of eco-forests were established according to the guidelines presented by the Korea Forest Service; however, the detailed work of the project was planned with its user-oriented approach. Then the construction of eco-forest was being planned following the directions, which would lead to development of a plant garden similar to arboretum or botanical garden. Therefore, it is required that the architect who designs eco-forest as well as the public officer concerned firmly establish the concepts of eco-forest, and that, through close analysis of development conditions, a candidate site to fit the purpose of constructing eco-forest be selected, and also a substantive management plan be established upon completion of construction of eco-forest.

A Study on Intervention of the Tomb's System in Joseon Royal Tombs, the World Cultural Heritage of UNESCO (세계문화유산 조선 왕릉의 능제조정에 관한 연구)

  • Lee, Chang-Hwan;Kim, Kyu-Yeon;Kim, Du-Gyu;Choi, Jong-Hee
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.32 no.4
    • /
    • pp.94-104
    • /
    • 2014
  • This contribution studied knowledges, informations and main project issues for systematic conservation management utilize of Joseon Royal Tombs guaranteeing their Outstanding Universal Value, Authenticity and Integrity, and the outcomes are as follows. The first, regarding the tomb's system, it should be planned to enhance authenticity and integrity of Joseon Royal Tombs through historical facts, measurement, diagnosis and intervention according to international and national charters, statements and general standards. The second, regarding prevention against disasters, the anti-fire system including construction of GIS materials and the Risk Map following investigation the present condition, premising improvement of relevant laws and regulations, should be planned. The third, we should consider, regarding utilize, educational application by the each tomb's story and royal ancestral rite, tourism by the local area of each tomb and industrial application by science and IT technologies.

Analysis of Growth Condition and Some Suggestions for Its Maintenance of Legally Protected Trees Grown in Pyungtack City, Kunggi Province, Korea (경기도 평택시 보호수의 생육실태와 관리방안 연구)

  • Lee, Jong-Bum;Doo, Chul-Eon;Lee, Jae-Keun
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.15 no.3
    • /
    • pp.45-54
    • /
    • 2012
  • This study intended to analyze growth condition of each object by protected tree's ground for 45 places registered to Pyeongtaek protected tree list in locational characteristics, conduct exchange analysis for impediment extent rate in crown area and tree type to the result and suggest the measures to manage artificial impediment which is an effect on protected tree condition. In this study, the tree whose area of impediment for crown area is less than 21% is tree condition of grade 1~2, less than 21~50% is grade 2~3 and more than 50% is grade 3~5. The more impediment is, the more inconvenience causes on growth and development. So, it verified that the area rate must maintain less than 21% for the root system management of protected tree. For the standard of managing artificial impediment which is an effect on the tree condition of protected trees, the below matters intend to be suggested. The first, the impediment in crown area should be less than 21%. But, if there is not artificial impediment out of crown area, the rate of impediment area is considered to increase somewhat. The second, growth space of protected tree should be maintained by crown area at least and impediment should be established out of the crown area. The third, during the national project and land development, surroundings of protected tree must be applied as park, resting place, etc. and the establishment area of impediment (artificial impediment and natural impediment) in crown area must be limited. The forth, publicity for regional people (especially, land owner) is necessary for the protection of natural inheritance and the value of dependence on local government and village which are the subject of management must be announced widely through the internet media, etc, so its importance must be recognized. The fifth, the matters related to protected tree management must be able to limit artificial damage which is for surroundings of protected tree through the mutual connection among the local governments; construction, civil engineering, architecture, water and sewage, agriculture and forest and others. Also, following studies on the effects of kinds, thickness, etc. of impediment around the protected tree on trees should be continued.

A Study on the Business Plan Changes of Housing Complex evaluated by the "Housing Performance Grading Indication System" (주택성능등급표시제도의 개선을 위한 인정 단지의 사업계획변경 현황에 대한 실태조사 연구)

  • Lee, Sung-Ok;Bae, Cheol-Hak
    • KIEAE Journal
    • /
    • v.11 no.6
    • /
    • pp.43-51
    • /
    • 2011
  • This study aims to analyze on the change status in the project plan of the housing complex as evaluated through the Housing Performance Grading Indication System. This a a system for assessing quantitatively the comprehensive, unified performance of housing by an objective standard from the design stage since January 9, 2006. As housing is a composite with various performances, it is required necessary to objectively assess the various performances from the design stage for building better housing. Thus, this study analyzed the change status and objectively described objectively it centering on the construction and structure drawings for 12 items posted in the Facility Management System_(FMS) out of examples recognized by 2011 since the implementation of the system. The changes were analyzed though observing each performance item-specific characteristics and confirming the books approved for use. In various parts, such as the site area, landscape plan, plane plan for unit, supplementary welfare facility plan, finishing materials, window size and location, the project plan was changed. These changes may result in a grading change in of the performance items of the system. This study purpose is for it to be used as a basic resource required for future system development by supplementing the limitation of the design phase and then through playing a basic role for the assessment after completion.

Research on the Importance-Satisfaction Perception of Users of Private-Initiated Park Development Project - Focused on Jikdong Neighborhood Parks in Uijeongbu City - (민간공원 특례사업 추진 대상지 이용객의 중요도-만족도 인식에 관한 연구 - 의정부 직동근린공원을 대상으로 -)

  • Kim, Jong-Ho;Kim, Gun-Woo
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.50 no.4
    • /
    • pp.63-76
    • /
    • 2022
  • This study was conducted to compare the perceptions of the park use status, importance, and satisfaction of users in the first implemented and completed Uijeongbu Jikdong Neighborhood Park among the private park special projects carried out as a countermeasure for long-term non-execution of urban parks. To this end, in the initiated project, apartment residents and non-residents were classified according to the promotion plan, and a questionnaire research on importance and satisfaction was conducted to analyze the park use status and IPA(importance-performance analysis). First, as a result of the analysis of the current situation in terms of locational characteristics that occur during the promotion of special projects for private parks, unlike the mountainous areas, the targeted site was close to flat land, indicating that users' satisfaction with the landscape was high. Second, the access of the apartment residents in the initiated project site was easy. Thus, the use rate of residents was relatively higher than that of the non-residents. Third, differences in perception by item were identified through the analysis of IPA and the establishment of strategies. In quadrant I, among the facilities and services, installing restrooms was the priority for residents, and parking facilities and rest facilities were the priority than installing restrooms for non-residents. In quadrant II, overall scores for residents and non-residents were similar, but the distance to the park was in quadrant III due to the low level of satisfaction among non-residents. In this study, the difference in perception between residents and non-residents may cause problems in access and facilities in managing the park in the future. Therefore, it would be necessary to find a way to improve it by establishing a management strategy that takes into account the difference in the perception of residents after construction. In addition, through the results of this study, it was judged that the purpose of park development, the selection of types of parks, and the selection of plans and management indicators for each kind would be significant in the promotion of initiated projects in the planning of park development.

Improvement Strategy & Current Bidding Situation on Apartment Management of Landscape Architecture (공동주택 조경관리 입찰 실태와 개선방안)

  • Hong, Jong-Hyun;Park, Hyun-Bin;Yoon, Jong-Myeone;Kim, Dong-Pil
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.48 no.4
    • /
    • pp.41-54
    • /
    • 2020
  • This study was conducted to provide basic data for a transparent and fair bidding system by identifying problems and suggesting improvement measures through an analysis of the bidding status for construction projects and service-related landscaping of multi-family housing. To this end, we used the data from the "Multi-Family Housing Management Information System (K-apt)" that provides the history of apartment maintenance, bidding information, and the electronic bidding system to examine the winning bid status and amount, along with the size and trends of the winning bids by year, and the results of the selection of operators by construction type. As a result, it was found that out of the total number of successful bids (36,831), 4.4% (16,631) were in the landscaping business, and the average winning bid value was found to be about 24 million won. According to the data, 73% of the landscaping cases were valued between 3 million won and 30 million won, and 58.6% of the cases were in the field of "pest prevention and maintenance". 36% of the total number of bids were awarded from February to April, with "general competitive bidding" accounting for 59.8% of the bidding methods. As for the method of selecting the winning bidder, 55% adopted the "lowest bid" and "electronic bidding method," and 45% adopted the "qualification screening system" and "direct bidding method." As an improvement to the problems derived from the bidding status data, the following are recommended: First, the exception clause to the current 'electronic bidding method' application regulations must be minimized to activate the electronic bidding method so that a fair bidding system can be operated. Second, landscaping management standards for green area environmental quality of multi-family housing must be prepared. Third, the provisions for preparing design books, such as detailed statements and drawings before the bidding announcement, and calculating the basic amount shall be prepared so that fair bidding can be made by specifying the details of the project concretely and objectively must be made. Fourth, for various bidding conditions in the 'business operator selection guidelines', detailed guidelines for each condition, not the selection, need to be prepared to maintain fairness and consistency. These measures are believed to beuseful in the fair selection of landscaping operators for multi-family housing projects and to prepare objective and reasonable standards for the maintenance of landscaping facilities and a green environment.