• Title/Summary/Keyword: LNG Plant

Search Result 179, Processing Time 0.028 seconds

Experimental Study on Floating LNG Bunkering Terminal for Assessment of Loading and Offloading Performance (FLBT의 적하역 안정성 평가를 위한 실험적 연구)

  • Jung, Dong-Woo;Kim, Yun-Ho;Cho, Seok-Kyu;Jung, Dong-Ho;Sung, Hong-Gun;Kwon, Sun-Hong
    • Journal of Ocean Engineering and Technology
    • /
    • v.32 no.1
    • /
    • pp.51-61
    • /
    • 2018
  • In this study, the operability of an FLBT (floating LNG bunkering terminal) was evaluated experimentally. Model tests were conducted in the KRISO (Korea Research Institute of Ships and Ocean Engineering) ocean engineering basin. An FLBT, an LNG carrier, and two LNG bunkering shuttles were moored side by side with mooring ropes and fenders. Two white-noise wave cases, one irregular wave case, and various regular wave cases were generated. The relative local motions between each LNG loading arm and its corresponding manifold in the initial design configuration were calculated from measured 6-DOF motions at the center of gravity of each of the four vessels. Furthermore, the locations of the LNG loading arms and manifolds were varied to minimize the relative local motions.

Development of a Decision Making Model for Construction Management in LNG Plant Construction - Focused on Construction Stage - (LNG 공사의 건설사업관리 의사결정지원모델 개발 - 시공단계 중심 -)

  • Park, Hwan Pyo;Han, Jae Goo;Chin, Kyung Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.47-57
    • /
    • 2014
  • LNG plant projects tend to be implemented in overseas owing to its characteristics, so their project management scheme is somewhat different from those of general projects. Value chain in a LNG plant project includes exploration/production of gases, physical liquefaction/chemical conversion processes, transportation and storage. Key factors in the chain include liquefaction process (including ultra-low temperature liquefaction) to convert natural gas into liquid materials or fuel, and Front End Engineering Design (FEED) package, as well as Engineering, Procurement and Construction (EPC) technology comprising control, operation and construction. Success of a complex LNG plant project implemented in overseas depends on decision-making process in project management. Accordingly, to develop a decision-making model in of plant construction, the study extracted none factors in project management by EPC stage and assessed importance of each factor. The result showed that items in both project management and project risk management are important. Especially, the study developed a decision-making model in the construction stage of a LNG plant project based on the project management factors and importance assessment. The developed decision-making model would lay groundwork in building a decision-making system in construction stage of project management.

On the Social Acceptance of Site Selection for a LNG Power Plant (LNG발전소 입지선정에 관한 주민 수용성 제고연구)

  • Park, Dongkyu;Lee, Jae-Heon
    • Plant Journal
    • /
    • v.18 no.3
    • /
    • pp.41-51
    • /
    • 2022
  • Recently, LNG power plants are increasing drastically and the desire of an improvement in the quality of life is growing. The delay of power plant construction can hinder the stability of power supply and increase the cost. So this study was conducted to help power plant construction progressing from now on by studying on the social acceptance of a LNG power plant. On this study I limited the scope of the study to the stage of Site Selection which is the most conflict stage and can interrupt the project. To conduct this study I researched the recently constructed power plants which have been delayed, in particular Eumseong Natural Power Plant and Daegu LNG Power Plant which are under bitter conflicts with local residents and have difficulty in construction progressing. So I found out that it is very important to collect the opinions of the residents in the stage of Site Selection and it is necessary to change ACT ON ASSISTANCE TO ELECTRIC POWER PLANTS- NEIGHBORING AREAS. Lastly it is very important to adapt the state-of-the-art facilities to increase the social acceptance of a LNG power plant.

  • PDF

Decision Methodology for LNG Plant FEED Evaluation using Analytic Hierarchy Process (LNG 플랜트 프로젝트의 기본설계 평가방법에 관한 연구)

  • Park, Jong-Hwa;Cho, Dae-Myeong
    • Journal of the Korean Institute of Gas
    • /
    • v.20 no.3
    • /
    • pp.52-58
    • /
    • 2016
  • In this study, evaluation method for LNG plant FEED is suggested and its validity is confirmed using a well-known decision making technique of Analytic Hierarchy Process (AHP). It is a pairwise comparison technique which can be used when multiple options must be considered for a single decision making problem. In order to develop an objective decision methodology, various decision parameters, sub-parameters as well as the concept of scale of assessment were introduced, and its consistency among these parameters was also checked by calculating the consistency index (C.I.). The methodology suggested in this article will contribute in evaluation of LNG plant FEED with less bias and subjectivity associated with the decision making procedure.

Development of Risk-Based Inspection(RBI) Technology for LNG Plant Based on API RP581 Code (API RP 581 Code를 기반으로한 LNG 플랜트의 Risk-Based Inspection(RBI) 기술 개발)

  • Choi, Song-Chun;Choi, Jae-Boong;Hawang, In-Ju
    • Corrosion Science and Technology
    • /
    • v.11 no.5
    • /
    • pp.179-183
    • /
    • 2012
  • As one of promising solutions to overcome high oil price and energy crisis, the construction market of high value-added LNG plants is spotlighted world widely. The purpose of this study is to introduce LNG-RBI system to develop risk assessment technology with RAM(Reliability, Availability, Maintainability) modules against overseas monopolization. After analyzing relevant specific features and their technical levels, risk assessment program, non-destructive reliability evaluation strategy and safety criteria unification class are derived as core technologies. These IT-based convergence technologies can be used for enhancement of LNG plant efficiency, in which the modular parts are related to a system with artificial optimized algorithms as well as diverse databases of facility inspection and diagnosis fields.

LNG시장과 LNG Offshore Terminal 개발 동향

  • 김재신
    • Bulletin of the Society of Naval Architects of Korea
    • /
    • v.41 no.2
    • /
    • pp.94-99
    • /
    • 2004
  • 전 세계적으로 천연가스의 수요가 급격하게 증가함에 따라 천연가스의 생산 및 공급이 활발하게 이루어지고 있고, 향후 10년 간 천연가스의 사용량이 현재의 2배 이상이 될 것이라는 추측도 나오고 있다. 이에 따라 천연가스 생산지에서는 천연가스 액화 플랜트(Liquefaction Plant)와 저장 탱크(LNG Storage Tank), 수입하는 곳에서는 재기화 플랜트(Regasification Plant)와 저장 탱크, 그리고 LNG를 운송할 LNG 운반선의 신조프로젝트가 활발하게 진행되고 있다. 미국의 경우 911테러와 NIMBY 사고의 확대로 인하여 LNG 수입기지의 육상건설을 주민들의 반대하자 해상에 건조하려는 경향을 보이고 있으며, 이에 따라 여러 가지 형태의 LNG Offshore 터미널이 설계되고 있다. 향후 LNG의 급격한 수입이 예상되는 나라로는 미국, 중국, 인도 등이 있으며 수출국으로는 카타르가 급격하게 부상하고 있다. (중략)

  • PDF

Calculation of Breakeven Point for LNG-Heavy Oil Transfer of D Thermal Power Plant Considering $CO_2$ Emission Cost ($CO_2$ 배출비용을 감안한 D 발전소의 LNG-중유 연료교제 손익분기점 계산)

  • Jeong, Yeong-Ho;Lee, Sang-Joong;Lee, Gene-Kyu;Yang, Seong-Deog
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2008.10a
    • /
    • pp.65-67
    • /
    • 2008
  • Kyoto Protocol against global warming came into effect in Feb 2005. This paper presents a calculation $CO_2$ emission of D power plant for combusting LNG and heavy oil using the a, b, c coefficients obtained by the performance test. The authors also calculate the breakeven point of the fuel transfer from LNG to Oil considering recent $CO_2$ emission cost.

  • PDF

Third Wave of Gas Management System in LNG Carrier - VaCo System (LNG 운반선에서의 신개념 증발 가스 처리 시스템 - VaCo 시스템)

  • Choi, Jung-Ho;Yoo, Hong-Sung;Yoo, Kyung-Nam;Heo, An;Lee, Dou-Yeong;Lyy, Sung-Kak
    • Special Issue of the Society of Naval Architects of Korea
    • /
    • 2007.09a
    • /
    • pp.89-93
    • /
    • 2007
  • The Boil-off gas (BOG) generation during the voyage is inevitable since Natural Gas (NG) in normally liquefied below -160 degree C in atmosphere condition and small heat ingress due to relatively hot outside keeps evaporating continuously. The one of major issue in LNG carriers is to handle generated BOG from cargo tank. The generated BOG affects to increase the cargo tank pressure and Gas Management System (GMS) for LNG carriers is closely related to cargo tank pressure maintenance. Economically, BOG is generally used as fuel in LNG carrier. Newly developed GMS for LNG carrier in boiler propulsion system, VaCo System, not only accomplish automatic control in GMS but also ensure safer operation.

  • PDF

Motion and Sloshing Analysis for New Concept of Offshore Storage Unit

  • Ha, Mun-Keun;Kim, Mun-Sung;Paik, Bu-Keun;Park, Chung-Hum
    • Journal of Ocean Engineering and Technology
    • /
    • v.16 no.1
    • /
    • pp.1-7
    • /
    • 2002
  • 본 논문에서는 선체 하부에 moonpool과 bilge step을 장착한 새로운 개념으의 LNG-FPSO를 운동감소와 cargo, operation tank의 슬로싱 현상의 관점에서 기술하였다. LNG-FPSO의 주요제원은$L\times B\times D\times t(design)=270.0\times51.0\times32.32\times13.7(m)$ 이고 적용조건은 total corgo capacity of 161KT at 98% loading condition 이다. LNG-FPSO의 운동감소의 목적으로 2개의 moonpool과 선체하부 bilge 부분에 사각 step을 장착하였다. LNG-FPSO의 운동해석을 위해 단순화된 경계조건을 만족하는 선형화된 3차원 diffraction theory를 사용하였고 LNG-FPSO의 연성된 6-자유도 운동응답을 계산하였다. LNG-FPSO의 정확한 Roll 운동을 추정하기 위해 점성효과는 Himeno(1981)가 제안한 경험식을 사용하였다. Moonpool의 크기에 따른 운동감소의 경향을 파악하기 위해 이론적 계산과 실험적 방법으로 수행하였다. Moonpool 크기와 bilge step의 효과를 최적화하기 위해 총9가지의 case를 설정하였다. 이론 및 실험 결과로부터 본 LNG-FPSO는 moonpool과 bilge step의 장착으로 인한 감쇠력의 증가로 운동성능이 우수하다. 본 LNG-FPSO의 운동 응답중, 특별히 roll 운동이 다른 drillship, shuttle tanker등의 선박과 비교하여 상당히 작았고 이는 moonpool과 blige step의 장착으로 인한 효과로 판단된다. Cargo tank와 operation tank 크기를 검토 하기 위해 불규칙 해상중 sloshing 해석을 chamfer를 갖는 LNG-FPSO의 No.2, No.5 tank 벽면의 압력 분포와 자유표면의 time history에 초점을 맞추어 수행하였다. 최종적으로 tank 크기를 최적화 하였고 최적화된 tank는 선수사파와 횡파상태의 모든 filling에서 공진현상과 충격압력이 발생하지 않음을 확인하였다.