• Title/Summary/Keyword: LNG 하역 플랜트

Search Result 5, Processing Time 0.018 seconds

Establishment of Construction Procedure on the Off Shore Piping Work of a LNG Unloading Project (LNG 하역 플랜트의 Off Shore 배관시공절차 확립에 관한 연구)

  • Kim, Yong-Tan;Moon, Seung-Jae;Yoo, Hoseon
    • Plant Journal
    • /
    • v.5 no.4
    • /
    • pp.80-85
    • /
    • 2009
  • LNG stevedoring plant offshore pipelines requires human power and the longest construction period in constructing LNG storing terminal and influences on the success of the project absolutely. In this paper, the constructing procedures of LNG stevedoring plant offshore pipeline was established. Establishment of constructing procedures of LNG stevedoring plant offshore pipeline includes procurement of main equipments, iron frame and pipelines. To predict any expectable problems, that may occur by the stage of construction the application to the field works with a base of theoretical and practical contents for the constructing procedures of LNG stevedoring plant offshore pipelines can be established.

  • PDF

Numerical Assessment of LNGC Berthing Operation to FLBT (FLBT를 향해 접안하는 LNGC의 수치해석 및 안정성 평가)

  • Jung, Sung-Jun;Jung, Dong-Woo;Oh, Seung-Hoon;Kim, Yun-Ho;Jung, Dong-Ho
    • Journal of Navigation and Port Research
    • /
    • v.45 no.3
    • /
    • pp.87-94
    • /
    • 2021
  • The IMO has adopted emission standards that strictly restrict the use of bunker C oil for vessels. Accordingly, research and bunkering pilot projects for LNG fueled ships are being actively carried out, which is expected to substantially reduce environmental pollution. In this study, we have adopted the turret moored Floating LNG Bunkering Terminal (FLBT) designed to receive the LNG from LNGCs and to transfer LNG to LNG bunkering shuttles in ship to ship moored condition. Numerical simulations have been performed with a 1-year return period of wind, wave, and current. Damping values of numerical model were adjusted from the results of model tests to obtain accurate simulation results. The results confirm safe berthing operation during the 1-year return period of environmental condition. Safety depends on the direction of environment, with increasingly stable operation facilitated by the application of heading-control function of FLBT to avoid beam-sea conditions.

Development of the Pre-treatment Technology for LNG-FPSO (LNG-FPSO용 천연가스 전처리 기술 개발)

  • Jee, Hyun-Woo;Lee, Sun-Keun;Jung, Je-Ho;Min, Kwang-Joon;Kim, Mi-Jin
    • Plant Journal
    • /
    • v.9 no.3
    • /
    • pp.38-42
    • /
    • 2013
  • Submarine gas fields have focused because of the increasing fuel cost, the environmental regulations, and the safety & NIMBY problems. LNG-FPSO which is available for acid gas removal, recovery of the condensate & LPG and Liquefaction in topside process is one of high technology offshore structures. On the other hands, it is necessary to verify the pre-treatment efficiency by the ship motion and to apply to the design for LNG-FPSO. This study is to develop the pre-treatment technology for LNG-FPSO as taking account to the process efficiency by ship motion effects and the area optimization. Based on the simulation results, it founds that hybrid process shows the low circulate rate, the low heat duty and the small size of column dimensions compared to typical amine process. It will be verified the process efficiency in the various conditions by sea states as performing the 6-DOF motion test and CFD simulation.

  • PDF

A Comparative Study on Power System Harmonics for Offshore Plants (해양플랜트 전력시스템의 고조파 비교분석에 관한 연구)

  • Kim, Deok-Ki;Lee, Won-Ju;Kim, Jong-Su
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.22 no.7
    • /
    • pp.900-905
    • /
    • 2016
  • The field of power system harmonics has been receiving a great deal of attention recently. This is primarily due to the fact that non-linear (or harmonic-producing) loads comprise an ever-increasing portion of what is handled at a typical industrial plant. The incidence rate of harmonic-related problems is low, but awareness of harmonic issues can still help increase offshore power plant system reliability. On the rare occasion that harmonics become a problem, this is either due to the magnitude of harmonics produced or power system resonance. This harmonic study used an electrical configuration for the offloading scenario of a Floating LNG (FLNG) unit, considering power load. This electrical network configuration is visible in the electrical network load flow study part of the project. This study has been carried out to evaluate the performance of an electric power system, focusing on the harmonic efficiency of an electrically driven motor system to ensure offshore plant safety. In addition, the design part of this study analyzed the electric power system of an FLNG unit to improve the safety of operation and maintenance.

시선집중, 선진안전사업장 - 열정과 참여의 자율안전관리 적극 전개, HSG 중공업(주)

  • Jeong, Tae-Yeong
    • The Safety technology
    • /
    • no.182
    • /
    • pp.19-21
    • /
    • 2013
  • 우리나라 경제발전 역사에서 제철, 조선, 기계제조업 등의 중공업은 따로 떼어 놓고 생각할 수 없을 정도로 막대한 영향을 미쳤다. 중공업이 발전하면서 다른 여타 산업의 기반이 조성된 것은 물론이고, 중공업 제품들이 수출의 일등 공신 역할을 하면서 경제성장에 크게 이바지한 것이다. 이처럼 남다른 위치에 있는 중공업 기업 가운데 특히 눈에 띄는 회사가 있다. 바로 46회에 이어 47회 무역의 날에서 '2천만 불 수출탑'을 달성한 HSG 중공업(주)이 그곳이다. 지난 1989년 금광기업사로 출범한 이곳은 LNG 운반선의 펌프타워를 비롯한 대형 조선기자재와 해양플랜트, 하역운반설비 등을 전문적으로 제작하는 기업이다. 그 명성에 걸맞게 HSG 중공업(주)에서는 자재 구매에서부터 설계, 제작까지 모든 공정이 이뤄지고 있다. 단순하게 제품만을 생산하고 있다고 판단하면 큰 오산이다. 이곳은 삼성중공업, 현대중공업, 대우조선해양 등 국내 유수의 기업은 물론 샌드빅, 지멘스 등 외국기업으로부터 많은 물량을 수주받고 있을 정도로 기술력과 품질 모두를 인정받고 있다. 그렇다면 무엇이 이처럼 회사를 성장 발전시켜나갔을까. 이곳 관계자들은 이 같은 물음의 답으로 하나같이 '안전'을 꼽고 있다. 근로자들의 안전을 위해 매진한 것이 곧 고품질의 제품을 생산해 낼 수 있는 밑거름이 됐다는 것이다. 무재해 일터를 구축하기 위해 빈틈없는 안전관리를 전개해 나가고 있는 HSG 중공업(주)을 찾아가봤다.

  • PDF