• Title/Summary/Keyword: LNG발전소

Search Result 45, Processing Time 0.031 seconds

Deactivation of SCR Catalysts Applied in Power Plants (화력발전소 SCR 촉매의 활성저하 특성)

  • Lee, Jung-Bin;Kim, Dong Wha;Lee, Chang-Yong
    • Applied Chemistry for Engineering
    • /
    • v.21 no.1
    • /
    • pp.104-110
    • /
    • 2010
  • Deactivation of SCR catalysts applied in coal, orimulsion, and LNG power plants in Korea were studied for the regeneration of the deactivated catalyst. The catalysts were characterized by XRD, ICP-AES, BET and SEM, and were examined for ammonia SCR. Deactivation of SCR catalyst applied in coal power plant was mainly caused by the blockade of the pore due to the deposition of sulfate and particulate related to the ingredients of the fuel. The surface area of SCR catalyst applied in orimulsion power plant decreased considerably by the accumulation of the compounds of vanadium, sulfur, and magnesium on the surface of the catalyst. The compounds of vanadium and sulfur were related to the ingredients of the fuel, and the compound of magnesium was related to the additive of the fuel. The activity of the deactivated catalyst for ammonia SCR, however, decreased slightly. Despite the long use for more than two-year, deactivation of SCR catalyst applied in LNG power plants hardly occurred.

An Advanced Design Procedure for Dome and Ring Beam of Concrete Containment Structures (콘크리트 격납구조물 돔과 링빔의 개선된 설계기법)

  • Jeon, Se-Jin;Kim, Young-Jin
    • Journal of the Korea Concrete Institute
    • /
    • v.22 no.6
    • /
    • pp.817-824
    • /
    • 2010
  • The concrete containment structures have been widely used in nuclear power plants, LNG storage tanks, etc., due to their high safety and economic efficiency. The containment structure consists of a bottom slab, wall, ring beam and dome. The shape of the roof dome has a very significant effect on structural safety, the quantity of materials, and constructability; the thickness and curvature of the dome should therefore be determined to give the optimum design. The ring beam plays the role as supports for the dome, resulting in a minimized deformation of the wall. The main issues in designing the ring beam are the correct dimensions of the section and the prestress level. In this study, an efficient design procedure is proposed that can be used to determine an optimal shape and prestress level of the dome and ring beam. In the preliminary design stage of the procedure, the membrane theory of shells of revolution is adopted to determine several plausible alternatives which can be obtained even by hand calculation. Based on the proposed procedures, domes and ring beams of the existing domestic containment structures are analyzed and some improvements are discussed.

Small Hydraulic Power Generation using the Discharging Seawater from LNG Receiving Terminal (LNG 인수기지의 방류해수를 이용한 소수력발전 개발방안)

  • Ha, Jongmann;Chae, Jeongmin;Son, Whaseong
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.06a
    • /
    • pp.192.2-192.2
    • /
    • 2010
  • 일반적 의미의 소수력발전은 계곡이나 저낙차의 하천에서 시도되었으나, 한국의 지형과 강수패턴등은 소수력발전을 활성화하기에 어려운 점들이 있었다. 이에 최근에는 정수장, 하수처리장등과 같은 인공구조물에 소수력발전을 설치 운영하는 방향으로 가고 있으며, 특히 화력발전소 냉각공정에 사용되는 해수를 이용한 소수력발전이 크게 성공하였고 확대설치 되어가고 있다. 해안에 위치하는 LNG인수기지에서는 LNG의 기화에 해수를 열원으로 사용하며, 기화공정에서 열교환 후 바다에 배출된다. 이 때 기화해수와 공기와의 접촉으로 생성된 거품은 해양미생물과의 복합작용으로 쉽게 깨어지지 않고 바다로 떠내려가게 된다. 이러한 거품은 시각적 거부감으로 인하여 인근어민들의 불편함을 야기하고 있으며, 또한 배출해수와 일반해수와의 온도차로 인한 인근 어장이나 양식장의 어획고에 미칠 수 있는 부작용의 가능성에 대한 우려는 더욱 방류해수의 적절한 처리를 필요로 하고 있다. 이러한 방류해수의 거품생성을 해결하는 데 있어 근본적인 해결방법은 심층배수법인데, 심층배수 구조물에 발전수차를 추가 설치만 하면 수력발전이 가능하다. 방류해수의 거품관련 환경문제를 해결하면서 동시에 청정전력을 생산할 수 있는 해양소수력발전에 대하여 KOGAS에서는 LNG 인수기지에의 적용가능성을 분석하고 있으며, 방류해수의 낙차와 조수간만의 차를 이용하는 해양소수력발전을 LNG 인수기지에의 적용하는 것으로는 세계최초의 시도이다. 주변지형에 따른 입지여건을 분석하고, 해수계통분석, 소수력발전방법, 수차종류, 수차용량, 수차개수, pond의 크기등을 결정하고, 수리해석 및 경제성분석을 수행할 것이며 소수력발전의 타당성여부에 대한 가늠을 잡고자 한다.

  • PDF

Applying the PEST-SWOT-AHP methodology Development of Korean Gas Turbines and Development of Promotion Strategies for Expansion of Supply (PEST-SWOT-AHP 방법론을 적용한 한국형 가스터빈 개발 및 보급 확대 추진전략 도출)

  • Lee Choong Soon;Kim Yeon Tae;Park Hyung Jun
    • Journal of Technology Innovation
    • /
    • v.32 no.1
    • /
    • pp.1-25
    • /
    • 2024
  • Countries around the world are making active efforts to reduce greenhouse gas emissions. Korea is also pursuing a policy of abolishing aging coal power and converting it to LNG power generation. However, in Korea, gas turbine manufacturing technology has not been localized, so all of it is imported and installed from overseas manufacturers. Therefore, this paper examines the domestic and foreign environment of the gas turbine power generation industry and proposes a strategy to develop and expand the supply of Korean gas turbine technology by applying the PEST-SWOT-AHP methodology. As a result of the research, the strategy to develop and expand the supply of Korean gas turbine technology can be summarized as 1) strengthening the role of power generation public enterprises to develop and promote commercialization of gas turbine technology, 2) expanding the proportion of LNG power generation to reduce greenhouse gases, 3) the government's active efforts to create an ecosystem for the gas turbine industry, and 4) forming a public consensus on the construction of LNG power plants.

F-V Analysis and STATCOM Installation Method to Replace Constrained Generation (F-V 해석을 이용한 수도권 제약발전 대체를 위한 STATCOM 투입 위치 선정 방안)

  • Noh, Hyeok-Jin;Oh, Seung-Chan;Park, Bohyun;Choi, Jin-San;Lee, Byong-Jun
    • Proceedings of the KIEE Conference
    • /
    • 2015.07a
    • /
    • pp.163-164
    • /
    • 2015
  • LNG복합발전은 수요지 인근에 건설이 가능한 장점이 있어 수도권 인근 발전소 중 상당한 부분을 차지하고 있다. 이러한 LNG 복합발전은 수도권 부하비율 감소에 따라 발전량이 줄어들게 된다. 2018년 계통데이터를 기반으로 수도권의 부하수준이 70%까지 떨어졌을 때, 거의 모든 수도권 복합발전이 정지함을 확인할 수 있다. 이 때, 신가평과 강원을 잇는 765kV급 융통선로의 2회선 상정사고 발생 시 수도권 무효전력 공급원이 줄어들어 전압이 불안정해진다. 이와 같은 상정사고를 대비해 수도권 복합발전 중 일부는 제약운전을 시행해야 한다. 본 논문에서는 제약운전을 하는 수도권 LNG복합발전의 발전량을 대체할 수 있는 대안으로 적절한 위치에 FACTS설비를 투입하고자 한다. FACTS설비를 효율적으로 운전시키기 위해 LNG복합발전의 발전량 감소에 따른 전압변화에 대해 Tangent Vector Component가 가장 큰 수도권 345kV 모선을 선정해 STATCOM을 투입하고 그 결과를 확인한다. 이를 확인하기 위한 방안으로 제약운전을 하는 복합발전의 발전량을 감소시키고 관찰하고자 하는 모선과 거리가 먼 비수도권 발전량을 증가시켜 수급을 맞춘 뒤 전압의 변화를 관찰한다. 이 때, 하나의 계통을 2개의 지역으로 구역화하여 전압을 확인할 수 있는 F-V 해석을 이용한다.

  • PDF

Comparison of the CO2 Emission Estimation Methods in a LNG Power Plant Based on the Mass Balance Approach (물질수지 방법을 고려한 액화천연가스 발전소에서의 온실기체 배출량 산정 방법 비교)

  • Kim, Hee-Jin;Yeo, Min Ju;Kim, Yong Pyo;Jang, Geon Woo;Shin, Won Geun;Lee, Myung Hwoon;Choi, Hyung Wook
    • Journal of Climate Change Research
    • /
    • v.4 no.3
    • /
    • pp.235-244
    • /
    • 2013
  • Carbon dioxide emission estimation methods consist of four tiers according to the IPCC guideline. In this study, estimated results by tier 3 and tier 4 were compared with the theoretically calculated $CO_2$ emissions based on the mass balance approach for a gas fired power plant between March and May 2011. It was found that the relative differences were upto 17% between the measured emissions by tier 4 and theoretically estimated emissions, while the results of tier 3 were similar to those from theoretically estimated ones. The comparisons suggested the possibility of misestimation due to replacing missing, abnormal, or invalid data in continuous emissions monitoring system. When using only the data without those missing, abnormal, or invalid data, the relative differences decreased somewhat but still showed consistent differences depending on the stack. It is suggested that this differences might be due to the accuracy of the measurement instruments for the tier 4, especially, for the flow rate measurement instrument.

An analysis on the characteristics of regasification system for LNG-FSRU depending on the changes in performance with vaporization and temperature of the heat source (LNG-FSRU용 재기화 시스템의 열원 온도 및 기화성능의 변동에 따른 시스템 특성분석)

  • Lee, Yoon-Ho;Kim, You-Taek;Kang, Ho-Keun
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.38 no.6
    • /
    • pp.625-631
    • /
    • 2014
  • In this study, according to increase of thermoelectric power plants that use LNG, LNG-FSRU(Floating-Storage and Regasification Unit) appeared and it is installed on the Topside in order to deliver in a gaseous state to consumers who are in the shore. This study about the study on the characteristics analysis of the system depending on changes in performance with the vaporization and temperature of the heat source. For the characteristics analysis of the system, we devided vaporization method into Ethylene glycol water vaporization method and sea water as a heat source. Then the system that can vaporize 200ton per hour of LNG of $-157.9^{\circ}C$ and 10,400kPa was configured, and according to the temperature of supplied sea water, required minimum flow rate value was calculated. Also in case of using Ethylene glycol Water as a vaporization method, providing for regional and seasonal factors such as decrease of temperature of water. The system is configured by adding a steam boiler of $174.5^{\circ}C$, 775kPa as heat source. The generation amount of the steam required according to the performance of the vaporizer compared to the water temperature changes in the steam boiler and the amount of required evaporative performance due to changes in the quantity of steam and Ethylene glycol Water was confirmed.

Experimental Evaluation of Developed Ultra-low NOx Coal Burner Using Gas in a Bench-scale Single Burner Furnace (Bench-scale 연소로에서 가스 혼소를 통한 초 저 NOx 석탄 버너 개발 연구)

  • Chae, Taeyoung;Lee, Jaewook;Lee, Youngjae;Yang, Won
    • Clean Technology
    • /
    • v.28 no.2
    • /
    • pp.117-122
    • /
    • 2022
  • This study developed and tested an ultra-low NOx burner in an 80 kW combustion furnace. The experiment was conducted in an 80 kW single burner combustion furnace with changing the swirl numbers, total equivalence ratios, and primary/secondary oxidizer ratios. In this study, liquefied natural gas (LNG) was used as an auxiliary fuel to significantly reduce NOx production. In a thermal power plant, the amount of NOx generated during coal combustion is about 300 ppm. However, using the burner tested in this study, it was possible to reduce the amount of NOx generated via LNG co-firing to 40 ppm. If the input amount of the primary oxidizer is enough for the gas to be completely combusted and the gas and coal are added simultaneously, the combusted gas forms a high-temperature region at the burner outlet and volatilizes the coal. As a result, the N contained in the devolatilized coal is discharged. Therefore, when the coal is subsequently burned, the amount of NOx produced decreases because there is almost no N remaining in the coal. If a thermal power plant burner is developed based on the results of this study, it is expected that the NOx generation will be significantly lower in the early stage of combustion.

1'st stage Emission Trading Simulation Analysis (발전부문 배출권 모의거래 시행결과 분석 및 고찰)

  • Kim, Yong-Wan;Kwak, Wang-Shin;Ok, Ki-Youl;Cho, Se-Cheol
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.561_562
    • /
    • 2009
  • 발전부문 배출권 모의거래는 배출권 거래제 도입시 발전부부문에 미치는 영향 분석을 통해 발전부문의 대응전략을 수립하기 위한 목적으로 2008년에 전력거래소가 주관하여 발전5사(남동, 중부, 서부, 동서, 남부)가 주요 참여사로 하여 국내최초로 국내실정에 맞는 배출권 모의거래를 시행하였다. 모의거래에서는 2가지의 시나리오를 설정하였다. 시나리오 I은 최소발전량 발전, 시나리오 II는 총발전운영계획량과 발전실적량을 일치토록하는 전제조건을 설정하였다. 그 결과 시나리오 I에서 모든 참여사는 최소 조건을 충족하도록 발전하는 전략적 행위로 인하여 전력공급지장이 발생하였고, 시나리오 II는 온실가스 배출량이 적은 LNG발전소의 발전량은 증가시키고, 온실가스량이 많은 석탄화력은 증가 운전토록하는 전략적 행위를 취함으로써 발전원가의 상승으로 인하여 전력가격이 상승하는 결과를 초래하였다. 따라서 향후 우리나라에 배출권 거래제 도입될 경우에 대비하여 전력시장과 연계한 배출권 거래제의 다양한 시뮬레이션이 필요하다.

  • PDF

Mid-long term analysis and prospect on jeju island's power generation sector (중장기적 제주지역 발전사업 진단 및 전망)

  • Kim, Woo-Gon;Choi, Byung-Ki;Kim, Wook
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.380-381
    • /
    • 2006
  • 정부는 제3차 전력수급기본계획 수립에 대비하고, 고가로 공급되는 LPG 수요를 대체하기 위한 제주도청의 LNG 공급요청과 제주지역에서 LNG사업을 희망하는 한국가스공사의 의향 그리고 한국전력공사의 전력연계선 추가건설 추진 등을 종합적으로 감안하여 이에 관한 세부 연구를 한국전기연구원에 위탁한 바 있다. 분석을 위한 전제 자료는 유관 사업자와 중립적 입장에 있는 한국전력거래소의 세밀한 검토와 합의를 거쳐 정해졌으며, 전력과 가스부문은 물론 이와 관련된 사회적 비용(Social Cost)이 모두 고려되었다. 아직까지 최종 결론은 확정되지 않았지만 연계선을 추가로 건설하는 방안이 가장 우세한 것으로 전해지고 있다. 따라서 본 논문은 추가 전력연계선 건설과 제3차 전력수급기본계획시 발전사업자가 제출한 제주지역에서의 발전소 건설 의향 등을 반영하여 2010년 이후 제주지역에서의 발전사업을 분석하고 전망하였으며, 예상되는 문제점을 중심으로 발전사업자 입장에서 개선방안을 제시하고자 하였다.

  • PDF