• 제목/요약/키워드: LCC최적설계

검색결과 50건 처리시간 0.028초

설계의 경제성 분석을 통한 최적노선 선정방안 연구 - OO경전철 민간투자사업 사례연구 - (The Study for Selection of the Optimum Route by Economic Analyses)

  • 권석현;서성한;이동우
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.128-138
    • /
    • 2008
  • VE of the scripture season enterprises and it respected LCC analyzes from the research which it sees and to use AHP techniques and definite LCC techniques and probabilistic LCC techniques selects the optimum route the case study which it executed. It presented the quality rating model in about the resultant most route lascivious at the time of VE evaluation, in order to select the alternative of optimum AHP techniques which are one in decision-making technique and an evaluation item by weight and a grade it applied the mountaintop it did. Also the definite LCC analyzer law departments of existing together it applied the probabilistic LCC techniques which use Monte Carlo Simulation in about analytical prices and reliability height boil. The economical efficiency was excellent with VE/LCC analytical resultant route and facility size abridgment, the rivers most it will be able to minimize an environmental effect with short distance traverse, the selection this hit preparation LCC which separates from the land use side decreased, the value (V) above 22.0% with the fact that it improves. And, the reliability of the probabilistic LCC analytical resultant analytical results in compliance with Monte Carlo Simulation with 90.3% was very analyzed with the fact that it is a high level.

  • PDF

교육시설 BTL 사업에서 LCC 분석의 문제점도출 및 해결방안 (Problems and Solutions of LCC Analysis in BTL Project for Education Facilities)

  • 김청융;홍태훈;현창택;이현종
    • 한국건설관리학회논문집
    • /
    • 제9권4호
    • /
    • pp.182-192
    • /
    • 2008
  • BTL 사업은 공공시설물에서 민간의 자본과 기술력을 통해 높은 성과를 낼 것으로 기대되고 있지만, VE의 최적 설계안을 선정하고 건물의 유지관리 비용 예측에 사용되는 LCC 분석은 다수의 복잡한 문제점을 가지고 있어 제한적으로 적용되고 있다. 본 연구의 목적은 국내의 BTL 사업에서 LCC 분석의 문제점을 분석하고 그 해결방안을 제안하는 것이다. 이를 위해 BTL 사업에서 주요 사업대상인 교육시설을 중심으로 LCC 분석을 두 가지 수준(대안선정 LCC와 건축 LCC)으로 구분하고, 이들의 주요 특징을 고찰하였다. 그리고 6가지 측면(비용분류체계, 수선정보, 생애주기, 비용의 시간적 가치, 수선정보 데이터베이스, LCC 분석모델)에서 사례연구를 통해 4가지 주요 문제점과 해결방안을 도출하였다. 이 연구의 결과는 민간과 공공분야 참여주체들의 중장기적인 계획과 실행에 의해 해결될 수 있을 것이다.

교량의 생애주기비용 효율적인 최적 내진보강과 유지관리전략 - (II) 생애주기비용해석 방법론 (Life-Cycle Cost Effective Optimal Seismic Retrofit and Maintenance Strategy of Bridge Structures - (II) Methodology for Life-Cycle Cost Analysis)

  • 이광민;조효남;정지승;안형준
    • 대한토목학회논문집
    • /
    • 제26권6A호
    • /
    • pp.977-988
    • /
    • 2006
  • 본 연구에서는 열화하는 교량의 생애주기비용(Life-Cycle Cost: 이하 LCC)-효율적인 최적 내진보강과 유지관리전략의 선정문제의 의사결정을 위한 현실적인 방법론을 제안하고자 한다. 제안된 방법론은 설계규준과 같은 제약조건하에서 내진보강비용, 기대 유지관리비용, 그리고 기대 경제손실비용의 합으로 표현되는 총 기대 LCC의 최소화 개념에 기초하고 있다. 본 연구에서 제안된 방법론은 동반논문에서 고려된 예제교량의 최적 내진보강과 유지관리전략의 선정을 위한 문제에 적용되었고, 부식환경과 교통조건에 따른 LCC-효율성에 대하여 고찰해 보았다. 또한, 개발된 방법론의 타당성을 검증해보기 위해 고려된 조건에 따른 LCC분석결과를 기존 연구에서 제안된 방법론과 비교 및 고찰을 수행하였다. 적용 예를 통해 제안된 방법론은 LCC-효율적인 내진보강과 유지관리전략의 선정을 위한 의사결정에 있어서 매우 효율적인 도구로 활용될 수 있을 것으로 기대된다.

장대 PC교량의 최적 내진설계 및 성능개선을 위한 최소 기대 Life Cycle Cost 모델 (Minimum Expected Life Cycle Cost Model for Optimal Seismic Design and Upgrading of Long Span PC Bridges)

  • 조효남;임종권
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 1999년도 봄 학술발표회 논문집
    • /
    • pp.305-312
    • /
    • 1999
  • This study is intended to propose a systematic and practical life cycle cost(LCC) model for the development of the reliability-based seismic safety and cost-effective performance criteria for design and upgrading of long-span PC bridges. The LCC models consist of five cost functions such as initial cost, repair/replacement cost, human losses, road user cost, and indirect losses of regional economy. The proposed model Is successfully expressed in temrs of Park-Ang damage indices and life cycle damage probability obtained from SMART-DRAIN-2DX which is an existing algorithm for nonlinear time history analysis. The proposed LCC model is successfully applied to a viaduct constructed by PSM, in Seoul. Based on the observations, the proposed systematic procedure for the formulation of LCC model may be useful for the development of the reliability-based seismic safety and cost-effective performance criteria for design and upgrading of long-span PC bridges.

  • PDF

협동 최적화 방법을 이용한 강상자형교의 생애주기비용 최적설계 (Optimum Life-Cycle Cost Design of Steel Box Girder Bridges Using Collaborative Optimization)

  • 조효남;민대홍;권우성
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2001년도 가을 학술발표회 논문집
    • /
    • pp.201-210
    • /
    • 2001
  • In this study, large-scale distributed design approach for a life cycle cost (LCC) optimization of steel box girder bridges was implemented. A collaborative optimization approach is one of the multidisciplinary design optimization approaches and it has been proven to be best suited for distributed design environment. The problem of optimum LCC design of steel box girder bridges is formulated as that of minimization of the expected total LCC that consists of initial cost maintenance cost expected retrofit costs for strength, deflection and crack. To discuss the possibility of the application for the collaborative optimization of steel box girder bridges, the results of this algorithm are compared with those of single level algorithm. From the numerical investigations, the collaborative optimization approach proposed in this study may be expected to be new concepts and design methodologies associated with the LCC approach.

  • PDF

교각 및 지진격리장치의 비선형성을 고려한 지진격리교량의 손상평가 및 LCC 최적설계 (Damage Estimation and LCC Optimal Design of Seismic Isolated Bridges considering nonlinearities of Pier and Isolator)

  • 고현무;함대기;신정환
    • 한국지진공학회:학술대회논문집
    • /
    • 한국지진공학회 2003년도 추계 학술발표회논문집
    • /
    • pp.344-351
    • /
    • 2003
  • In order to consider the characteristics of nonlinear dynamic responses of seismic isolated bridges reasonably, piers and isolators are modeled as a 2-DOF bilinear system. Then nonlinear time-history earthquake response analysis is accomplished many artificial input ground motions which were generated to reflect the characteristics of earthquakes. Damage probabilities and failure probabilities of each structural elements of the brides are calculated by using Monte-Carlo simulation method. Based on LCC evaluation considering various cost items of direct/indirect damage costs, the optimal design method of seismic isolated bridges is proposed. By using a sensitivity analysis about the design variables and a cost effectiveness evaluation in the viewpoint of LCC, the validity and the adequacy of proposed optimal design method are verified.

  • PDF

설계수명 및 경제성을 고려한 유도상 아스팔트 궤도의 최적 단면 산정 (Optimal Section of Ballasted Asphalt Track Considering Design Lifetime and Economic Feasibility)

  • 이성혁;이진욱;이현민
    • 한국철도학회논문집
    • /
    • 제18권3호
    • /
    • pp.241-251
    • /
    • 2015
  • 유도상 아스팔트 콘크리트 궤도(이하, 유도상 AC궤도)는 아스팔트 콘크리트 노반(이하, AC노반)의 존재에 의해 유도상 궤도에 비해 열차하중 분산효과에 의한 강화노반 두께 감소가 가능하며 누적 소성 변위도 작을 뿐만 아니라 유지관리 측면에서도 유리한 궤도 구조이기 때문에 국외에서 적용 사례가 증가하고 있다. 그러므로 유도상 AC궤도의 국내 도입을 검토하기 위해 선행 연구를 통해 수행한 AC노반 유무에 따른 거동 특성을 분석하여 현재 설계기준에 명시된 유도상 궤도의 단면과 유사한 성능을 보이는 유도상 AC궤도의 단면을 분석한 바 있으며, 실대형 정 동적 열차하중 재하 실험 결과와의 비교를 통해 해석 결과의 신뢰성을 검증하였다. 본 연구에서는 선행 연구를 바탕으로 AC노반의 두께를 일정하게 하고 강화노반 두께를 변화시켰을 때에 획득된 AC노반 하면에서의 변형률을 이용하여 설계 수명을 산정하였고 각각의 단면에 대한 확률론적 LCC분석을 통해 기대 설계 수명을 만족하면서 기존 유도상 궤도와 비교하여 동등 또는 동등이상의 성능을 갖는 유도상 AC궤도의 설계 단면을 제시하였다.

공동주택 단위세대의 생애 비용 최적화 방법론 연구 (The Life Cycle Cost Optimization Methodology as a Tool for Designing Apartment Units)

  • 박태근
    • 한국건설관리학회논문집
    • /
    • 제1권1호
    • /
    • pp.80-86
    • /
    • 2000
  • 최근 공동주택의 유지관리를 위한 인건비, 에너지비가 급속하게 증가하고 있다. 이에 따라 설계단계에서 이 비용을 절감할 수 있는 기법의 필요성이 제기되고 있다. 공동주택에 있어서는 대부분의 경우 세대당 동일한 내외벽, 창호 등이 반복적으로 사용되므로 단위평면의 LCC 최적화가 전체 건물의 LCC 최적화에 있어서 가장 중요하다. 이를 위하여 본 연구에서는 LCC 비용항목 중 공동주택의 물리적 시스템에 탄력성있게 변화하는 LCC 비용항목을 파악하였고, 초기건축비, 보수교체비, 에너지비를 종합적으로 최적화시킬 수 있도록 LCC 부위단가 개념을 도입하여 공동주택 적정치수 산정방법을 제시하였다. 여기에서 보수교체비산정은 보수교체비용 최소화에 의한 최적 보수교체주기법에 근거하였으며, 에너지 소비량 추정은 DOE-2에 의한 동적 에너지 부하량을 추정하여 LCC 부위단가 개념에 접목하였다. 보수교체비 최적화 기법과 동적에너지 분석에 의한 LCC 부위단가 개념은 기존의 개념과는 다른 독창적인 개념이다.

  • PDF

생애주기비용을 이용한 잔교식 안벽의 신뢰도지수 최적화 (Reliability Index Optimization for Pier Type Quay Walls Using Life Cycle Cost)

  • 김동현;윤길림
    • 한국해안·해양공학회논문집
    • /
    • 제23권6호
    • /
    • pp.422-428
    • /
    • 2011
  • 잔교식 안벽의 생애주기비용(Life Cycle Cost, LCC)을 이용하여 신뢰도지수의 최적값을 구하였다. 응답면 기법을 이용한 신뢰성해석을 통해 횡잔교와 돌제식 잔교의 파괴확률을 산정하였다. 파괴확률은 잔교의 파괴 시 복구비용을 산출하는데 활용하였으며 초기공사비와 유지관리비를 모두 고려한 LCC를 최소화시킬 수 있는 신뢰도지수를 찾았다. 지진하중과 접안하중에 대한 다양한 조건에서의 최적 신뢰도지수를 구하였고 이를 통해 신뢰성설계에 사용할 수 있는 목표신뢰도지수를 제안하였다.

HID 램프를 위한 전자식 안정기의 LCC 공진 인버터의 최적 설계 (An Optimal Design of LCC Resonant Inverter for Electronic Ballast to Drive HID Lamp)

  • 박종연;장목순;임병노
    • 전기학회논문지
    • /
    • 제56권3호
    • /
    • pp.531-537
    • /
    • 2007
  • This paper presents a new method for determining L, Cs, and Cp in a series parallel resonant inverter. This inverter is suitable for driving high-intensity discharge (HID) lamps. The operating frequency is selected to avoid acoustic resonances which are governed by the size and shape of the arc tube. L, Cs and Cp, are chosen to satisfy the ignition and steady state requirements of the lamp. Equations are developed to analyze the starting condition and steady state operating condition of the lamp. For the prototype ballast for a 250W Metal Halide Lamp, experimental results are presented in order to validate the proposed method.