• Title/Summary/Keyword: Kori unit 1

Search Result 184, Processing Time 0.024 seconds

Thermal-Hydraulic Analysis Methodology of Nuclear Power Plant Steam Generator (원전 증기발생기 열유동 해석법)

  • Choi Seok-Ki;Kim Seong-O;Choi Hoon-Ki
    • Journal of computational fluids engineering
    • /
    • v.7 no.2
    • /
    • pp.43-52
    • /
    • 2002
  • This paper presents the numerical methodology of ATHOS3 code for thermal hydraulic analysis of steam generators in nuclear power plant. Topics include porous media approach, governing equations, physical models and correlations for solid-to-fluid interaction and heat transfer, and numerical solution scheme. The ATHOS3 code is applied to the thermal hydraulic analysis of steam generator in the Korea Kori Unit-1 nuclear power plant and the computed results are presented

Pretreatment Process for Performance Improvement of SIES at Kori Unit 2 in Korea

  • Lee, Sang-Jin;Yang, Ho-Yeon;Shin, Sang-Woon;Song, Myung-Jae
    • Proceedings of the Korean Radioactive Waste Society Conference
    • /
    • 2004.02a
    • /
    • pp.12-27
    • /
    • 2004
  • Pretreatment process consisted of submerged hollow-fiber microfiltration(HMF) membrane and spiral-wound nanofiltration(SNF) membrane has been developed by NETEC, KHNP for the purpose of improving the impurities of liquid radioactive waste before entering Selective Ion Exchange System(SIES). The lab-scale combined system was installed at Kori NPP #2 nuclear power plant and demonstration tests using actual liquid radioactive waste were carried out to verify the performance of the combined system. The submerged HMF membrane was adopted for removal of suspended solid in liquid radioactive waste and the SNF membrane was used for removal of particulate radioisotope such as, Ag-l10m and oily waste because ion exchange resin can not remove particulate radioisotopes. The liquid waste in Waste Holdup Tank (WHT) was processed with HMF and SNF membrane, and SIES. The initial SS concentration and total activity of actual waste were 38,000ppb and $1.534{\times}10_{-3}{\mu}Ci/cc$, respectively. The SS concentration and total activity of permeate were 30ppb and lower than LLD(Lower Limit of Detection), respectively.

  • PDF

SIMULATION OF THERMAL STRATIFICATION IN INLET NOZZLE OF STEAM GENERATOR

  • Ji, Joon-Suk;Youn, Bum-Su;Jeong, Hyun-Chul;Kim, Sang-Nyung
    • Nuclear Engineering and Technology
    • /
    • v.41 no.3
    • /
    • pp.287-294
    • /
    • 2009
  • Due to thermal hydraulics phenomena, such as thermal stratification, various events occur to the parts of a nuclear power plant during their lifetimes: e.g. cracked and dislocated pipes and thermally fatigued, bent, and damaged supports. Due to the operational characteristics of the parts of the steam generator feedwater inlet horizontal pipe, thermal stratification takes place particularly frequently. However, the thermal stress due to thermal stratification at the steam generator feedwater inlet horizontal pipe was not reflected in the design stage of old plants(Kori Unit No.1, 2, 3 and 4, Yeonggwang Unit No. 1 and 2, and Uljin Unit No. 1 and 2; referred to as old-style power plants hereinafter). Accordingly, a verification experiment was performed for thermal stratification in the horizontal inlet nozzle steam generator of old-style plants. If thermal stratification occurred in the horizontal pipe of an old-style power plant, numerical analysis of the temperature distribution of the pipes and fluids was conducted. The temperature distributions were compared at the curved part of the pipe and the horizontal pipe before and after the installation of the improved thermal sleeves designed to alleviate thermal stress due to thermal stratification. The thermal stress reduction measure was proven effective at the steam generator inlet horizontal pipe and the curved part of the pipe.

Development of a Real-Time Thermal Performance Diagnostic Monitoring System Using Self-Organizing Neural Network for KORI-2 Nuclear Power Unit (자기학습 신경망을 이용한 원자력발전소 고리 2호기 실시간 열성능 진단 시스템 개발)

  • Kang, Hyun-Gook;Seong, Poong-Hyun
    • Nuclear Engineering and Technology
    • /
    • v.28 no.1
    • /
    • pp.36-43
    • /
    • 1996
  • In this work, a PC-based thermal performance monitoring system is developed for the nuclear power plants. The system performs real-time thermal performance monitoring and diagnosis during plant operation. Specifically, a prototype for the KORI-2 nuclear power unit is developed and examined in this work. The analysis and the fault identification of the thermal cycle of a nuclear power plant is very difficult because the system structure is highly complex and the components are very much inter-related. In this study, some major diagnostic performance parameters are selected in order to represent the thermal cycle effectively and to reduce the computing time. The Fuzzy ARTMAP, a self-organizing neural network, is used to recognize the characteristic pattern change of the performance parameters in abnormal situation. By examination, this algorithm is shown to be able to detect abnormality and to identify the fault component or the change of system operation condition successfully. For the convenience of operators, a graphical user interface is also constructed in this work.

  • PDF

Introduction of Vibration Evaluation for APR 1400 Reactor Coolant Pump Shaft (APR 1400급 원자로냉각재펌프의 회전체 진동평가에 관한 고찰)

  • Kim, Ik Joong;Lim, Do Hyun;Kim, Min Chul;Bang, Sang Youn
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2014.10a
    • /
    • pp.110-115
    • /
    • 2014
  • The nuclear power plant was launched by Kori unit 1 in 1978 years. Currently, 23 nuclear power plants have been operating in Korea since 1978 years. The localization was completed for most of the reactor facility from Hanbit(Youngkwang) unit 3&4. However, RCP(Reactor Coolant Pump) and MMIS(Man Machine Interface System) is an important technology that has been excluded from the scope of the technical transfer has been dependent on a specific overseas vendor. Recent success in RCP development through co-operation with government and industries. Developed RCP will be applied to Shin-Hanul unit 1&2 nuclear power plants. The RCP operates in high speed and high pressure condition and only rotating component in the NSSS(Nuclear Steam Supply System). Therefore, the problem of vibration has arisen caused by the hydraulic forces of the working fluid. These forces can influence on the stability characteristics for entire RCS(Reactor Coolant System) loop, and can act as significant destabilizing forces. In this study, vibration evaluation of the pump shaft of development RCP estimated under normal operation and over speed conditions. In order to predict the vibration characteristics and dynamic behavior, modal analysis, critical speed analysis and unbalance response spectrum analysis were performed.

  • PDF

Development of GIS for the Food Chain Assessment around Kori Nuclear Power Plant Using ArcView (ArcView를 이용한 고리 원전 주변 육상생태계 평가를 위한 GIS 구축)

  • Kang, H.S.;Choi, H.J.;Yu, D.H.;Keum, D.K.;Choi, Y.H.;Lim, K.M.;Lee, H.S.;Lee, C.W.
    • Journal of Radiation Protection and Research
    • /
    • v.30 no.3
    • /
    • pp.121-130
    • /
    • 2005
  • Geographical Information System(GIS) was established to display the calculation results which show the concentration change with time and regions in case of an accidental release of radionuclides from Kori Nuclear Power Plants. GIS included the commercial program, ArcView(ESRI), and a basic digital map of 1:5000 scale lot 20km by 20km around Kori area. The object for the presentation was $^{131}I$ concentration in rice which is one of staple foodstuffs. Provided by deposited $^{131}I$ concentrations, ECOREA-II code computed the $^{131}I$ concentration of the soil and the plant in the area divided by In unit cells in total, in which the concentrations also varied with time. The results were introduced into the attributed data of previously designed polygon cells in ArcView. In order to display the concentration change with time by monotonic color, the RGB value for ArcView color lamp was controlled. This display definitely helped the concentration change around Kori area be acceptable to public.

Material degradation and its management of reactor internals in PWR (원자로 내부구조물 재료열화이력 및 관리방안)

  • Hwnag, Seong Sik;Kim, Sung Woo;Kim, Dong Jin;Choi, Min Jae;Lim, Yun Soo
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.12 no.1
    • /
    • pp.1-10
    • /
    • 2016
  • The number of nuclear power plants operating in Korea was 24 as of year 2015. Nine units out of 24 units have been operated for a period over 20 years. Kori unit 1 has been in operation for 40 years, and an extended operation for Wolsong unit 1 was decided in 2015. There has been reported some crackings in reactor internals in PWR have been reported in Europe, USA, Japan and Korea, and some of them were replaced with new one. Repair and replacement technologies for the reactor internals have been developing in order to meet the regulatory requirements for long term operation in Korea. The technologies will also be used for the exported nuclear units. It is required to review degradation history of the reactor internals worldwide as a part of the degradation management program development. Schematics of reactor internals designed and supplied by Westinghouse, Framatome and Combustion Engineering are described herein. Materials degradation history of reactor internals of PWR plants in USA, Japan and Europe is surveyed and summarized. Some events from Korean plants are also described. Aging management strategy for the internals is suggested.

The Experience and Analysis of Radiological Protection at KoRi Unit #1, Nuclear Power Plant (원자력(原子力) 1 호기(號機)의 방사선관리경험(放射線管理經驗)과 평가(評價))

  • Park, Shin-Woo
    • Journal of Radiation Protection and Research
    • /
    • v.9 no.2
    • /
    • pp.118-128
    • /
    • 1984
  • The analysis of radiological protection at Kori Nuclear Unit #1, which started commercial operation on April 29, 1978, has been carried out in three areas, namely, radiation exposure, radioactive waste disposal and environmental management. The analysis results for radiation exposure and radioactive effluent releases appear to increase gradually with plant operating years. On the other hand, the apex of radiation exposure and radioactive effluent releases was in 1983 and 1982 respectively and then decreased or stabilized. Also, the operation environmental radioactivity seems to be no higher than preoperation environmental radioactivity.

  • PDF

Development of the PRE-MARK and the Core Model for Kori Unit 1 Simulator (고리1호기 시뮬레이터 PRE-MARK 및 노심모델 개발)

  • 홍진혁
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 2003.06a
    • /
    • pp.101-105
    • /
    • 2003
  • 본 논문은 고리 1호기 원자력발전소를 기준발전소로 하여 개발된 PRE-MARK 소개 및 PRE-MARK을 기반으로 개발된 노심모델의 결과를 제시하고자 하는 것을 주된 목적으로 하고 있다. 노심 모델개발에는 REMARK 모델 프로그램을 기반으로 개발된 PRE-MARK를 이용하였으며, PRE-MARK의 주요 특징으로는 노심모델 입력자료를 노심설계코드 및 Lattice 코드로부터 자동으로 생성하며여 GUI 기반으로 변경된 REMARK으로 입력하여 노심모델을 구동함과 동시에 실시간으로 중요 변수의 현재 값들을 그래프로 도시해줌으로 조율 (Tuning) 상수를 용이하게 결정할 수 있도록 하는 것이다. 또한 BOL 및 EOL에서 HFP 평형 Xenon조건에서의 제어봉 위치에 따른 제어봉가(Rod worth)를 고리 1호기 20주기 NDR (Nuclear Design Report)과 비교하고, 원자로정지 이후 BOL, MOL 및 EOL에서의 시간에 따른 Xenon의 반응도 영향을 비교함으로 개발된 모델의 건전성을 입증하였다.

  • PDF

Classification of Radiation Work in Korean Nuclear Power Plants

  • Changju Song;Tae Young Kong;Seongjun Kim;Jinho Son;Hwapyoung Kim;Jiung Kim;Hee Geun Kim
    • Journal of Radiation Industry
    • /
    • v.17 no.3
    • /
    • pp.239-256
    • /
    • 2023
  • The classification of the radiation work performed in Korean nuclear power plants (NPPs) must be understood to provide workers with more comprehensive radiation protection. This study used annual reports on occupational exposure to investigate and analyze the similarities and differences in the radiation work performed in Korean NPPs with pressurized water reactors (PWRs) and pressurized heavy water reactors (PHWRs). The results showed that the radiation work performed in Korean NPPs could be classified into three categories. Category 1 contains work at the highest level. This work can be divided into individual tasks belonging to Category 2, which enables the evaluation of the radiation dose during the work. The work in Category 2 consists of tasks from Category 3, which contains basic detailed tasks that are not further subdivided. This study emphasized the need for the systematic management of the radiation work performed in both Korean PWRs and PHWRs, such as the tasks in Category 3, which are similar, with similar working conditions, for PWRs and PHWRs. It also suggested the need to establish a list of radiation work for decommissioning because Kori Unit 1 and Wolsong Unit 1 are currently in permanent shutdown and preparations are being made for their decommissioning.