Periodic safety review on Kori Unit 1 has been successfully done for the first time in Korea. 11 safety factors of the review were fully evaluated in accordance with the domestic legal system. Although it is the oldest nuclear power plant in Korea, Kori Unit 1 was found to have maintained good operating conditions and continuously enhanced its safety by implementing post-TMI action plans and other safety issues, such as replacing steam generators and process/control system. It can be therefore confirmed that safe operation of Kori Unit 1 is guaranteed until next periodic safety review. Nevertheless, some corrective action items were recommended to enhance further its safety level, such as equipment qualification, additional ageing management program, strengthening of some procedures related to administration and human factor. The results of PSR can be utilized for the continued operation beyond the design life as long as the plant safety is maintained and improved. Experiences of the PSR on Kori Unit 1 can be also applied to PSR on other plants.
Proceedings of the Korean Radioactive Waste Society Conference
/
2018.11a
/
pp.104-104
/
2018
Kori Unit 1 is the first permanent shutdown nuclear power plant in Korea and it is on June 18th, 2017. Spent fuel assemblies began to be discharged from the reactor core to the spent fuel pool(SFP) within one week after shutdown of Kori unit 1 and the campaign was completed on June 27th, 2017. The total number of spent nuclear fuel assemblies in SFP of Kori Unit-1 is 485 and their discharging date is different respectively. So, decay heat was evaluated considering the actual enrichment, operation history and cooling time of the spent fuel assemblies stored in SFP of the Kori Unit-1. The code used in the evaluation is the ORIGEN-based CAREPOOL system developed by KHNP. Decay heat calculation of PWR fuel is based on ANSI/ANS 5.1-2005, "Decay heat power in light water reactors" and ISO-10645, "Nuclear energy - Light water reactors - Calculation of the decay heat power in nuclear fuels. Also, we considered the contribution of fission products, actinide nuclides, neutron capture and radioactive material in decay heat calculation. CAREPOOL system calculates the individual and total decay heat of all of the spent fuel assemblies in SFP of Kori Unit-1. As a result, the total decay heat generated in SFP on June 28th, 2017 when the spent fuel assemblies were discharged from the reactor core, is estimated to be about 4,185.8 kw and to be about 609.5 kw on September 1st, 2018. It was also estimated that 119.6 kw is generated in 2050 when it is 32 years after the permanent shutdown. Figure 1 shows the trend of total decay heat in SFP of Kori Unit-1.
Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
/
v.14
no.3
/
pp.289-295
/
2016
Kori Unit 1, the first PWR (Pressurized Water Reactor) plant in Korea, began its commercial operation in 1978 and will permanently shut down on June 18, 2017. After moving the spent fuels to SFP (Spent Fuel Pool) system, Kori Unit 1 will perform a full system chemical decontamination to reduce radiation levels inside the various plant systems. This paper will describe the operation concept of the full system chemical decontamination for Kori Unit 1 based on experiences overseas.
Proceedings of the Korean Nuclear Society Conference
/
1997.05b
/
pp.515-519
/
1997
The purpose of this study is to reduce the fast neutron fluence at the reactor pressure vessel(RPV) and to provide a basis for plant-life extension. In this study, different neutron absorbers were employed in the core outer assemblies of Kori Unit 1 Cycle 14. The modified assemblies were used to calculate fast neutron fluence at the RPV and to evaluate reduction of outer assembly power and total power in core. By comparison with the case of no suppression fixture, the fast neutron fluence of a case with two rows stainless steel around the assembly with natural uranium pins is decreased by 85.8%. It is noted that the modification of outer assembly is more efficient than the previous low leakage loading pattern (LLLP) applied to Kori Unit 1. Also, compared fast neutron fluence in Cycle 1 with Cycle 14, fast neutron fluence at the RPV between Cycle 1 and Cycle 14 is not significantly different. It is found that LLLP applied to the Kori Unit 1 has not contributed to fast neutron fluence reduction at the RPV.
Relative power density distributions of the Kori Unit 1 pressurized water reactor are calculated by Monte Carlo modeling with the MCNP code. The Kori Unit 1 core is modeled on a three-dimensional representation of the one-eighth of the reactor in-vessel component with reflective boundaries at 0 and 45 degrees. The axial core model is based on half core symmetry and is divided into four axial segments. Fission reaction density in each rod is calculated by following 100 cycles with 5,000 test neutrons in each cycle after starling with a localized neutron source and ten noncontributing settle cycles. Relative assembly power distributions are calculated from fission reaction densities of rods in assembly. After 100 cycle calculations, the system converges to a k value of 1.00039 $\geq$ 0.00084. Relative assembly power distribution is nearly the same with that of the Kori Unit 1 FSAR. Applicability of the full-scope Monte Carlo simulation in the power distribution calculation is examined by the relative root moan square error of 2.159%.
Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
/
v.18
no.3
/
pp.347-354
/
2020
Site characterization for decommissioning Kori Unit 1 is ongoing in South Korea after 40 years of successful operation. Kori Unit 1's containment building is assumed to be mostly radioactively contaminated, and therefore radiation exposure management and detailed contamination investigation are required for decommissioning and dismantling it safely. In this study, site-specific Derived Concentration Guideline Levels (DCGLs) were derived using the residual radioactivity risk evaluation tool, RESRAD-BUILD code. A conceptual model of containment building for Kori Unit 1 was set up and limited occupational worker building inspection scenario was applied. Depending on the source location, the maximum contribution source and exposure pathway of each radionuclide were analyzed. The contribution of radionuclides to dose and exposure pathways, by source location, is expected to serve as basic data in the assessment criteria of survey areas and classification of impact areas during further decommissioning and decontamination of sites.
Three-dimensional neutron flux and fluence of Kori Unit 3 were evaluated using the synthesis technique described in Regulatory Guide 1.190 for all reactor geometry. For this purpose DORT neutron transport calculations from Cycle 1 to Cycle 15 were performed using BUGLE-96 cross-section library. The calculated flux and fluence were validated by comparing the calculated reaction rates to the measurement data from the dosimetry sensor set of the $5^{th}$ surveillance capsule withdrawn at the end of cycle 15 of Kori Unit 3. And then the best estimation of the neutron exposures for the reactor vessel beltline region was performed using the least square evaluation. These results can be used in the assessment of the state of embrittlement of Kori Unit 3 pressure vessel.
Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
/
v.14
no.2
/
pp.123-134
/
2016
Decommissioning of nuclear power plants has become a big issue in South Korea as some of the nuclear power plants in operation including Kori unit 1 and Wolsung unit 1 are getting old. Recently, Wolsung unit 1 received permission to continue operation while Kori unit 1 will shut down permanently in June 2017. With the consideration of segmentation method and disposal containers, this paper evaluated final disposal amount of radioactive waste generated from decommissioning of the reactor pressure vessel in Kori unit 1 which will be decommissioned as the first in South Korea. The evaluation results indicated that the final disposal amount from the top and bottom heads of the reactor pressure vessel with hemisphere shape decreased as they were cut in smaller more effectively than the cylindrical part of the reactor pressure vessel. It was also investigated that 200 L and 320 L radioactive waste disposal containers used in Kyung-Ju disposal facility had low payload efficiency because of loading weight limitation.
A SGTR accident postulated at Kori unit 1 is simulated with Mihama unit experience, which occurred on February 1991, to evaluate the capability of plant to cope with the transient. The system design and plant conditions of Kori Unit 1 are much similar with those of Mihama Unit 2. Therefore, special concern has been given to evaluate the sequence and the resulting consequence of the postulated SGTR accident at the Kori unit 1 An analysis is peformed as realistically as possible, with following the EOP of Kori unit 1. The result indicates that the leak through tube break terminates within about forty minutes, and the Kori unit 1 may be sufficient to cope with SGTR accident with same type of sequence. However, the reconsideration may be required for the design of Kori unit 1 which disconnects non-safety AC power from off-site power on SI signal generation. It may be pointed out that the content of EOP for SGTR accident is not enough to require operator's proper judgements. An analysis of SGTR accident tested in the LSTF which simulated the SGTR accident at the Mihama Unit 2 is peformed using the RELAP5/MOD3. The results indicates that the code yields in general good agreement with the test, except the break flowrate at the early stage of the event.
Joo, Han Young;Kim, Jae Wook;Jeong, So Yun;Moon, Joo Hyun
Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
/
v.18
no.2_spc
/
pp.247-260
/
2020
A multi-regression model was developed to estimate the decommissioning cost for Kori unit 1 using foreign nuclear power plant (NPP) decommissioning cost data. First, the decommissioning cost data were collected for 13 boiling water reactors and 16 pressurized water reactors and converted into the values as of November 2019. Then, for the regression model, the decommissioning cost was chosen as the dependent variable, and two variables were selected as independent variables: a contamination factor that was designed to reflect the operational characteristics of the decommissioned NPP and the decommissioning period. A statistical package in the R language was used to derive the regression model. Finally, the regression model was applied to estimate the decommissioning cost for Kori unit 1. The estimated decommissioning cost for Kori unit 1 was 663.40~928.32 million US dollars (782,812~1,095,418 million Korean won).
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.