Browse > Article
http://dx.doi.org/10.7733/jnfcwt.2016.14.3.289

Full System Chemical Decontamination Concept for Kori Unit 1 Decommissioning  

Lee, Doo Ho (KHNP Central Research Institute)
Kwon, Hyuk Chul (KHNP Central Research Institute)
Kim, Deok Ki (KHNP Central Research Institute)
Publication Information
Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT) / v.14, no.3, 2016 , pp. 289-295 More about this Journal
Abstract
Kori Unit 1, the first PWR (Pressurized Water Reactor) plant in Korea, began its commercial operation in 1978 and will permanently shut down on June 18, 2017. After moving the spent fuels to SFP (Spent Fuel Pool) system, Kori Unit 1 will perform a full system chemical decontamination to reduce radiation levels inside the various plant systems. This paper will describe the operation concept of the full system chemical decontamination for Kori Unit 1 based on experiences overseas.
Keywords
Kori Unit 1; Full system chemical decontamination; Radiation level;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 T.A. Beaman and J.L. Smee, Evaluation of the Decontamination of the Reactor Coolant Systems at Maine Yankee and Connecticut Yankee, EPRI Report, 23-71, TR-112092 (1999).
2 R. McGrath, Jose Cabrera Nuclear Power Plant Full System Chemical Decontamination Experience Report, EPRI Report, 21-43, TR-1019230 (2009).
3 G.Y. Park and C.L. Kim, "Chemical Decontamination Design for NPP Decommissioning and Considerations on its Methodology", Journal of Nuclear Fuel Cycle and Waste Technology, 13(3), 187-199 (2015).   DOI
4 D.H. Lee, "Analysis of Basic Requirements for Kori-1 Full System Decontamination", KHNPCRI Report, 26-38, 2015-50003339-0488TC (2015).