• 제목/요약/키워드: Korean engineering

검색결과 240,869건 처리시간 0.133초

각광받는 한국의 기술용역업 (Spotlighting Engineering Service Business in Korea)

  • Cho Kyu Shim
    • 한국기술사회:학술대회논문집
    • /
    • 한국기술사회 1987년도 제17회 한일기술사 합동 심포지움
    • /
    • pp.65-71
    • /
    • 1987
  • All Korean professional engineer′s great joy Is to welcome the Japanese professional engineers and relevant guests to the 1987 Japan-Korea Professional Engineers Joint Convention organized by the Korean Professional Engineers Association. As there exists an effort of blood, sweat and tear behind a succeeded theatrical stage, so an exquisite devotion with drawing up a master plan, investigation, supervision and etc by engineering firms is soaked through every part of huge construction projects and large unit factory buildings. It is over 14 years that the Engineering Service Promotion Law has been enacted by the Ministry of Science and Technology. In the meantime, the domestic engineering (engineering service) have reached a remarkable higher level while the number of engineering firms participating in overseas market has gradually been increasing. From a small scale of under water investigation to a large scale planning of atomic reactor or petrochemical plant, engineering service business can be said "The Software of Total Industry." Engineering service is what is called a higher business which offers specialized engineering know-how and experience. Engineering service compaines offer Its specialized knowledge and experience to government, industry and commerce. Whether the task is to modernize plant equipment, to design a building or to manage construction, an engineering company will develop and implement the most appropriate and cost effective solution. Clients use the engineering service of firm knowing that the engineer′s professional judgement is not influenced or biased by other commercial affiliations. While benefiting from the diverse experience that professional engineers can apply to a specific problem, government and industry also reduce the need for permanent in-house engineering staff. Engineering firms may be specialized or multi-disciplinary.

  • PDF

The Anti-oxidation of Ulva lactuca Fucoidan in Ovariectomy

  • Nam, Chun-Suk;Park, Eun-Kyung;Kang, Kum-Suk;Shim, Ju-A;Kim, Hee-Jin;Lee, Jin-Young;Ok, Hyoung-Soo;Lee, Sang-Hun;Kim, Jin-Wook;Kim, Nam-Young;Lee, Eo-Jin;Ha, Bae-Jin
    • 한국생명과학회:학술대회논문집
    • /
    • 한국생명과학회 2005년도 제45회 학술심포지움 및 추계학술대회
    • /
    • pp.55-55
    • /
    • 2005
  • PDF

An Efficient Engineering Design Education Framework in Information Network Engineering

  • Lee, Sang-Gon;Koh, Kyeong-Uk
    • 공학교육연구
    • /
    • 제15권5호
    • /
    • pp.64-68
    • /
    • 2012
  • Design factors such as design objects establishment, analysis, synthesis, production, test and evaluation should be educated in a systematic way. Also design ability to reflect practical restrictive conditions such as industrial standards, economic feasibility, environmental impact, aesthetics, safety and reliability, ethical impacts and social impacts should be cultivated. In this paper, we explain the meaning of these terms and propose a systematic engineering design education framework satisfying Korean engineering education accreditation criteria. We also present a simple implementation in information network engineering.

정부지원 과제의 시스템엔지니어링 적용 교훈 : 사례 연구 (Lessons Learned from Application of Systems Engineering to Government Funded Project : Case Study)

  • 김진일;염충섭;신중욱
    • 시스템엔지니어링학술지
    • /
    • 제15권2호
    • /
    • pp.31-38
    • /
    • 2019
  • The systems engineering standard process is intended to be customized for a given project environment and system characteristics. This study describes the experience gained by applying systems engineering to government-funded projects. The characteristics of government funded project are lack of common development process among the participating organizations and mechanism to determine system requirements. This study describes the contents of the systems engineering activities, including development of operational concept, system requirements, verification requirements (test cases), test verification plan, and implementation of system test and lessons learned from these activities.