• Title/Summary/Keyword: Korean TMDL

Search Result 156, Processing Time 0.029 seconds

Pollutant Load Delivery Ratio for Flow Duration at the Chooryeong-cheon Watershed (추령천 유역의 유황별 유달율 계산)

  • Kim, Young-Joo;Yoon, Kwang-Sik;Son, Jae-Gwon;Choi, Jin-Kyu;Chang, Nam-Ik
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.52 no.4
    • /
    • pp.19-26
    • /
    • 2010
  • To provide the basic information for the water quality management of the Sumjin River Basin, delivery ratios for flow duration were studied. Using the day-interval data set of discharge and water quality observed from the Chooryeong-cheon watershed, the flow-duration and discharge-load relation curves for the watershed were established, then the load-duration curve was constructed. Delivery ratios for flow duration were also developed. Delivery ratios showed wide variation according to flow conditions. In general, delivery ratio of high flow condition showed higher value reflecting nonpoint source pollution contribution from the forest dominating watershed. To resolve this problem, a regression model explaining the relation between flow rate and delivery ratio was suggested. The delivery ratios for different flow regime could be used for pollutant load estimation and TMDL (Total maximum daily load) development.

Total Load Control System(TLCS) and Pollutant Loading Estimates from Watershed using BASINS (새만금 유역에 있어 BASINS 적용가능성 검토 (만경유역 유출량을 중심으로))

  • Jeon, J.H.;Yoon, C.G.
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2001.10a
    • /
    • pp.399-402
    • /
    • 2001
  • After the legal foundation for the Total Load Control System (TLCS) process is embedded in integrated water management counterplan for 4 major river basins (1998), Kyunggido Kwangju City prepared the implementation plan of TLCS at first time. There is little difference between TLCS and TMDL(Total Daily Maxium Loading; U.S.A). TMDL is applied only when mandatory effluent limitations are not stringent enough to attain any water quality standard. But object of TLCS not only attain water quality standard at distributed watershed but also consider development of area at non-distributed watershed. For applying of systematic and consistent TLCS, we need to establish a system integrated watershed and point source, non-point source and assessed massive database easily. Now we are study on applicable possibility of BASINS on Korea, we think that BASINS's tool and many models are more easily apply to TLCS, so we recommend TLCS will be applied using BASINS.

  • PDF

Calculation of Total Maximum Daily Load using Instreamflow Requirement (하천유지유량을 이용한 일최대 오염허용부하량 산정 방안)

  • Chung, Eun-Sung;Kim, Kyung-Tae;Kim, Sang-Ug;Lee, Kil Seong
    • Journal of Korean Society on Water Environment
    • /
    • v.24 no.3
    • /
    • pp.317-327
    • /
    • 2008
  • This study developed the methodology to calculate the total daily maximum load (TMDL) using the instreamflow requirement because the previous TMDLs were too simple to easily achieve. Instreamflow requirement which was the average low flow ($Q_{275}$) in the previous planning cannot consider the seasonal variation of streamflow. Therefore, this study used the instreamflow requirement which is a maximum value among hydrologic drought flow ($Q_{355}$), and environmental flows for ecology and scenery. The environmental flows for ecology were calculated using Physical HABitat SIMulation system (PHABSIM) which can estimate the necessary flow for fish survival by life cycle. Using the proposed method, all monthly TMDLs of streams in the Anyangcheon were calculated for the application.

Characterization on the Pollution Discharge Load at the Unit Watershed for the Management of Total Maximum Daily Loads - in Guem River Basin (수질오염총량관리 단위유역별 오염물질 배출부하량 특성분석 - 금강수계를 대상으로)

  • Park, Jun Dae;Choi, Ok Youn;Oh, Seung Young
    • Journal of Korean Society on Water Environment
    • /
    • v.28 no.6
    • /
    • pp.786-795
    • /
    • 2012
  • Water quality management should be focused on the pollution concentrated area so that the improvement of water quality can be achieved effectively for the management of Total Maximum Daily Loads (TMDLs). It is necessary to consider discharge characteristics in the TMDL plan. This study analysed discharge characteristics such as pollution generation and discharge load density, and reduction potential by each unit watershed, and categorized the unit watershed into four groups according to its discharge load characteristics. This analysis can be used as helpful information for the prioritization of pollution reduction area and selection of pollution reduction measures in the development of TMDL plans.

Empirical Equation for Pollutant Loads Delivery Ratio in Nakdong River TMDL Unit Watersheds (낙동강 오염총량관리 단위유역 유달율 경험공식)

  • Kim, Mun Sung;Shin, Hyun Suk;Park, Ju Hyun;Kim, Sangdan
    • Journal of Korean Society on Water Environment
    • /
    • v.25 no.4
    • /
    • pp.580-588
    • /
    • 2009
  • In this study daily flow rates and delivered pollutant loads of Nakdong river basin are simulated with modified TANK model and minimum variance unbiased estimator. Based on the simulation results, flow duration curves, load duration curves, and delivery ratio duration curves have been established. Then GIS analysis is performed to obtain several hydrological geomorphic characteristics such as watershed area, stream length, watershed slope and runoff curve number. Finally, multiple regression analysis is carried out to estimate empirical equations for pollutants delivery ratio. The results show that there is positive relation between the flow rates and delivery ratios, and the proposed empirical formulas for delivery ratio can predict well river pollutant loads.

Enhancement and Application of SWAT Auto-Calibration using Korean Ministry of Environment 8-Day Interval Flow/Water Quality data (환경부 8일 유량.수질 자료를 이용한 SWAT 자동보정 모듈 개선 및 적용 평가)

  • Kang, Hyunwoo;Ryu, Jichul;Kang, Hyungsik;Choi, Jaewan;Moon, Jongpil;Choi, Joongdae;Lim, Kyoung Jae
    • Journal of Korean Society on Water Environment
    • /
    • v.28 no.2
    • /
    • pp.247-254
    • /
    • 2012
  • Soil and Water Assessment Tool (SWAT) model has been widely used in estimation of flow and water quality at various watersheds worldwide, and it has an auto-calibration tool that could calibrate the flow and water quality data automatically from thousands of simulations. However, only continuous measured day flow/water quality data could be used in the current SWAT auto-calibration tool. Therefore, 8-day interval flow and water quality data measured nationwide by Korean Ministry of Environment (MOE) could not be used in SWAT auto-calibration even though long-term flow and water quality data in the Korean Total Maximum Daily Load (TMDL) watersheds available. In this study, current SWAT auto-calibration was modified to calibrate flow and water quality using 8-day interval flow and water quality data. As a result of this study, the Nash and Sutcliffe Efficiency (NSE) values for flow estimation using auto-calibration are 0.77 (calibration period) and 0.68 (validation period), and NSE value for water quality (T-P load) estimation (using the 8-day interval water quality data) is 0.80. The enhanced SWAT auto-calibration could be used in the estimation of continuous flow and water quality data at the outlet of TMDL watersheds and ungaged point of watersheds. In the next study, the enhanced SWAT auto-calibration will be integrated with Web based Load Duration Curve (LDC) system, and it could be suggested as methods of appraisal of TMDL in South Korea.

LIDMOD2 Development for Evaluation of LID/BMPs (LID/BMPs 효과분석을 위한 LIDMOD2 개발)

  • Jeon, Ji-Hong;Choi, Donghyuk;Na, Eun Hye;Park, Chan-Gi;Kim, Tae-Dong
    • Journal of Korean Society on Water Environment
    • /
    • v.26 no.3
    • /
    • pp.432-438
    • /
    • 2010
  • LIDMOD2 was developed for evaluation of low impact development (LID) and best management practice (BMP) by modification of Site Evaluation Tool (SET). The modification includes employment of SCS-CN method for annual runoff simulation, unit load method for annual pollutant loads simulation, and the method proposed by Korean TMDL for calculating pollutant reduction by BMPs. The CN values were updated with regionalized parameters within Nack-Dong River basin because these are important parameters for simulating hydrology. LIDMOD2 was tested by applying to Andong Bus terminal. As a simulation results, pollutant loads and surface runoff will be significantly increased by post-development without LID compared with those from pre-development. LID technique was simulated to efficiently reduce surface runoff and pollutant load and increase infiltration. LIDMOD2 is screening level tool and easy to use because LIDMOD2 is based on spread sheet and most of parameters are regionalized. LIDMOD2 was illustrate that it could evaluate LID well by summarizing and graphing annual hydrology, annual pollutant loading, and hydrograph for event storm. The calculation methods related with pollutant loads are employed from the guideline of Korean TMDL and it can be useful tool for Korean TMDL to evaluate the effect of LID/BMP on developing area.

Streamflow Estimation for Subbasins of Gap Stream Watershed by Using SWAT2000 Model (SWAT2000 모형을 이용한 갑천수계의 소유역별 유출량 추정)

  • Moon, Jong-Pil;Kim, Tai-Cheol
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.48 no.5
    • /
    • pp.29-38
    • /
    • 2006
  • Geographic Information System has extended to higher assessment of water resources. GIS linking with hydrological model becomes a trend in water resource assessment modeling. One of the most popular models is SWAT2000 which have effectiveness in multi-purpose processes for predicting the impact of land management practices on water, sediments and chemicals yields in large complex watershed with varying soils, land uses, and management conditions over long period of time. In this study, SWAT2000 model was applied to Gap stream watershed in Daejeon city where TMDL (Total Maximum Daily Load) Regulation would be implanted. The Gap Stream watershed was partitioned into 8 subbasins, however, only 3 out of 8 subbaisns were observed for having practical gauged data on the basis of streamflow from the year of 2002 to 2005. Gauged streamflow data of Indong, Boksu and Hoeduck stations were used for calibration and validation of the SWAT Streamflow simulation. Estimation Efficiency Analysis (COE), Regression Analysis ($R^{2}$), Relative Error (R.E.) were used for comparing observed streamflow data of the 3 subbasins on the daily and monthly basis with estimated streamflow data in order to fix optimized parameters for the best fitted results. COE value for the daily and monthly streamflow was ranged from 0.45 to 0.96. $R^{2}$ values for daily and monthly streamflow ranged from 0.51 to 0.97. R.E. values for total streamflow volume ranged from 3 % to 22.5 %. The accuracy of the model results shows that the SWAT2000 model can be applicable to Korean watersheds like the Gap Stream watershed that needs to be partitioned into a number of subbasins for TMDL regulation.

Application Load Duration Curve for Evaluation of Impaired Watershed at TMDL Unit Watershed in Korea (수질오염총량 단위유역의 유량조건별 수체 손상 평가를 위한 부하지속곡선 적용성 연구)

  • Hwang, Ha-Sun;Yoon, Chun-Gyeong;Kim, Ji-Tae
    • Journal of Korean Society on Water Environment
    • /
    • v.26 no.6
    • /
    • pp.903-909
    • /
    • 2010
  • The purpose of this study was evaluated on the applicability of Load Duration Curve Method (LDC Method) using HSPF watershed model and sampling data for efficient TMDLs in Korea. The LDC Method was used for assessment pollutant characteristics in watershed and water quality variation in each water flow level. Load Duration Curve is applied for judge the level of impaired water-body and can be estimated the impaired level by pollutant, such as BOD, T-N, and T-P in this study depending on variation of stream flow. As a result, BOD, T-P was usually exceed the standard value at low flow and dry hydrologic period. Improvement of effluent concentration from WWTP and riparian buffer protection zone are effective to improve the water quality. T-N showed the worst condition at mid-range hydrologic period and moist hydrologic period. Therefore, soil erosion control program and BMPs for non-point source pollution control is effective for recovery the water quality, which can be useful method for management of water quality in the plan of recovery water quality spontaneously. Applicability of LDC Method was evaluated in the Nakbon A watershed. However, we need to consider more detailed and accumulated data set such as accurate GIS data and detail pollution data, and WWTP discharge water quality data for accurate evaluation of watershed. Overall, The LDC Method is adequate for evaluation of watersheds characteristics, and its application is recommended for watershed management and TMDL Implementation.

Water Quality Management Measures for TMDL Unit Watershed Using Load Duration Curve (수질오염총량 단위유역별 LDC(Load Duration Curve, 부하지속곡선) 적용을 통한 수질관리 대안 모색 - 금호강 유역 대상)

  • Yun, Soyoung;Ryu, Jaena;Oh, Jeill
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.27 no.4
    • /
    • pp.429-438
    • /
    • 2013
  • This study was to develop effective water quality management measures using LDC (Load Duration Curve) curves for TMDL (Total Maximum Daily Loads) unit watershed. Using LDC curves, major factors for BOD and T-P concentration loads generation (i.e. point source or non-point source) in the case study area (Geumho river basin) were found for different hydrologic conditions. Different measures to deal with the pollutant loads were suggested to establish BMPs (Best Management Practices). It was found that the target area has urgent T-P management methods especially at moist and midrange hydrologic conditions because of point source pollutants occurred in developed areas. One example measure for this could be establishment of advanced treatment facility. This study proved that the use of LDC was a useful way to achieve TWQ (Target Water Quality) on the target watershed considered. It was also expected that the methodology applied in this study could have a wider application on the establishment of watershed water management measures.