References
- National Institute of Environmental Research (2008). Guidelines for watershed total maximum daily load management methods in Korea (Phase II) (수계오염총량관리기술지침(제2단계)).
- Korea Environment Corporation (2011). Water quality management methods for urban river basin (도시하천유역별(Urban River Basin) 수질관리체계 구축 타당성 검토 연구).
- Ministry of Environment (2009a). Master plan for TMDL in Nakdong river basin (Phase II) (제2단계 경상북도 낙동강수계 수질오염총량관리 기본계획).
- Ministry of Environment (2009b). Master plan for TMDL in Daegu river basin (Phase II) (제 2단계 대구광역시 낙동강수계 수질오염총량관리 기본계획).
- Babbar-Sebens, M. and Karthikeyan, R.(2009). Consideration of sample size of estimating contaminant load reductions using load duration curves. Journal of Hydrology. 372(1-4), pp. 118-123. https://doi.org/10.1016/j.jhydrol.2009.04.008
- Cleland, B. R.(2003). TMDL Development from the "Bottom up"-Part III: Duration Curve and Wet Weather Assessment. National TMDL Science and Policy 2003-WEF Specialty Conference, Chicago, IL.
- Hwang, H.S., Park, B.K., Kim, Y.S., Park, K.J., Cheon, S.U., and Lee, S.J. (2011). Research on the Application of the Load Duration Curve to Evaluate the Achievement of Target Water Quality in the Unit Watershed for a TMDL, Journal of Korean Society on Water Quality, 27(6), pp. 885-895.
- Hwang, H.S., Yoon, C.G., and Kim, J.T. (2010). Application Load Duration Curve for Evaluation of Impaired Watershed at TMDL Unit Watershed in Korea. Journal of Korean Society on Water Quality, 26(6), pp. 903-909.
- Jang, J.H., and Ahn, J.H. (2012). Load Duration Curve, LDC, Nakdong River Basin, Pollutant Loads, SWAT model, Water quality management, Journal of Korean Society on Water Quality, 28(3), pp. 409-417.
- Kim, J .G., Engel, B.A., Park, Y.S., Theller, L., Chaubey, I., Kong, D.S., and Lim, K.J.(2012). Development of Web-based Load Duration Curve system for analysis of total maximum daily load and water quality characteristics in a waterbody, Journal of Environmental Management, 97, pp. 46-55. https://doi.org/10.1016/j.jenvman.2011.11.012
- Lee, A .Y., Choi, D.G., Kim, T.W., and Kim S.D. (2010). The Hydrologic Fux of SS, TN and TP in Nakdong River Basin, Korean Society of Civil Engineers, 30(6B), pp. 551-560.
- Park. W.H. (2008). Decentralized wastewater treatment system. Journal of Korea Water Resources Association, 41(10), pp. 59-64.
- Park, J.D., Kim, J.L., Rhew, D.H., and Jung, D.I. (2010). A Study on the Water Quality Patterns of Unit Watersheds for the Management of TMDLs - in Nakdong River Basin -. Journal of Korean Society on Water Quality, 26(2), pp. 279-288.
- U.S.EPA(2007). An Approach for Using Load Duration Curves in the Development of TMDLs. 841-B-07-006, USA.
- U.S.EPA(2008). TMDLs to Stormwater Permits Handbook.
Cited by
- Development of Desktop-Based LDC Evaluation System for Effectiveness TMDLs vol.58, pp.4, 2016, https://doi.org/10.5389/KSAE.2016.58.4.067
- A Study on Development of Management Targets and Evaluation of Target Achievement for Non-point Source Pollution Management in Saemangeum Watershed vol.37, pp.8, 2015, https://doi.org/10.4491/KSEE.2015.37.8.480
- Water Pollution Source Tracing Using FDC and Correlation Analysis in Geumho River Basin vol.18, pp.3, 2016, https://doi.org/10.17663/JWR.2016.18.3.232
- Pollutant Load Characterization with Flow Conditions in Heukcheon Stream vol.29, pp.5, 2015, https://doi.org/10.11001/jksww.2015.29.5.551
- Application of the Load Duration Curve (LDC) to Evaluate the Achievement Rate of Target Water Quality in the Han-River Watersheds vol.31, pp.6, 2015, https://doi.org/10.15681/KSWE.2015.31.6.732
- 시계열 부하 곡선을 이용한 수체손상 평가 및 다변량 분석 -지석천 유역을 대상으로- vol.33, pp.6, 2013, https://doi.org/10.15681/kswe.2017.33.6.650
- 부하지속곡선을 이용한 비점오염원 우선관리 지역 선정 및 관리목표 설정 연구 vol.60, pp.5, 2018, https://doi.org/10.5389/ksae.2018.60.5.17
- 서화천 유역 비점오염원 관리를 위한 부하지속곡선 적용성 연구 vol.23, pp.3, 2020, https://doi.org/10.11108/kagis.2020.23.3.174