• 제목/요약/키워드: Korea standard nuclear power plant

검색결과 177건 처리시간 0.028초

신규원전의 설계특성 기반 정비효과성감시 프로그램 개발 (Development of Maintenance Effectiveness Monitoring Program based on Design Characteristics for New Nuclear Power Plant)

  • 염동운;현진우;송태영
    • 한국압력기기공학회 논문집
    • /
    • 제8권1호
    • /
    • pp.25-32
    • /
    • 2012
  • Korea Hydro & Nuclear Power Co. (KHNP) has developed and implemented the maintenance effectiveness monitoring (MR) programs for the operating nuclear power plants. The MR program is developed by reflecting design characteristics of the operating nuclear power plants to monitor the plant performance for improving the safety and reliability. Recently, KHNP has built a new nuclear power plant, and developed the MR program to establish the advanced maintenance system by reflecting unique design characteristics based on the OPR1000 standard model. So, the MR program developed in this study has another characteristics in comparison with the OPR1000 standard model, and we will verify the suitability of the MR program through evaluating initial performance of the plant. The safety and reliability of the new plant will be improved by developing and implementing the MR program.

한국 표준형 원자력 발전소 증기터빈 보호 및 제어를 위한 운전인자 선정과 운전반 운영 (Selection of Operating Parameters and Management of Operation Console for Protection and Control of Steam Turbine in a Korea Standard Type Nuclear Power Plant)

  • 최인규;김종안;우주희;신만수
    • 조명전기설비학회논문지
    • /
    • 제25권4호
    • /
    • pp.71-78
    • /
    • 2011
  • This paper contains the selection of operation parameters for protection and control of steam turbine in a Korea Standard Type Nuclear Power Plant. The safety of nuclear reactor must be ensured which generates nuclear energy and produces steam. Also, the safety of turbine, which consume the nuclear energy as a core machine, must be ensured. For the purpose of this, we describe how the operating parameters were selected, reviewed, implemented into the operator console and finally put into actual operation of the system.

Loss of a Main Feedwater Pump Test at 100% Power Simulation using Korean Standard Nuclear Plant Analyzer (KSNPA)

  • Jeong, Won-Sang;Kim, Shin-Whan;Sung, Kang-Sik;Seo, Jong-Tae;Lee, Sang-Keun
    • 한국원자력학회:학술대회논문집
    • /
    • 한국원자력학회 1996년도 춘계학술발표회논문집(1)
    • /
    • pp.296-302
    • /
    • 1996
  • The Loss of a Main Feedwater Pump test at 100% Power for YGN 4 was simulated in order to verify and validate the KSNPA. The comparison of the test data with the KSNPA prediction results showed reasonable agreement in the trends of the major plant parameters. All plant control systems including NSSS and T/G control systems are properly actuated and stabilized the plant conditions to a new steady state conditions in the KSNPA. From the comparison results, the KSNPA showed its capability to simulate the LOMFP event for the Korean Standard Nuclear Power Plant.

  • PDF

국내 표준형 원전의 단일 고장 취약성(SPV) 평가 (Evaluation of Single Point Vulnerability on Korean Standard Nuclear Power Plants)

  • 지문구;김명수
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2008년도 제39회 하계학술대회
    • /
    • pp.685-686
    • /
    • 2008
  • For the purpose of reducing the plant trip/transient by the failure of a single component during plant operation or maintenance, the list of critical components with Single Point Vulnerability (SPV) on KSNP (Korean Standard Nuclear Power Plant), the standardized methodology of SPV evaluation and the plan to improve reliability of the equipment have been established. In addition, SPV component lists for the other domestic operating Nuclear Power Plants have been made, and the proper procedure for SPV management will be developed.

  • PDF

RHODIUM SELF-POWERED NEUTRON DETECTOR'S LIFETIME FOR KOREAN STANDARD NUCLEAR POWER PLANTS

  • YOO CHOON SUNG;KIM BYOUNG CHUL;PARK JONG-HO;FERO ARNOLD H.;ANDERSON S. L.
    • Nuclear Engineering and Technology
    • /
    • 제37권6호
    • /
    • pp.605-610
    • /
    • 2005
  • A method to estimate the relative sensitivity of a self-powered rhodium detector for an upcoming cycle is developed by combining the rhodium depletion data from a nuclear design with the site measurement data. This method can be used both by nuclear power plant designers and by site staffs of Korean standard nuclear power plants for determining which rhodium detectors should be replaced during overhauls.

Development of CPC/COLSS Simulation Model for YGN#3,4 Simulator

  • Kim, Dong-Wook
    • 한국원자력학회:학술대회논문집
    • /
    • 한국원자력학회 1997년도 춘계학술발표회논문집(1)
    • /
    • pp.251-256
    • /
    • 1997
  • The safety and reliablity of nuclear power plant operations relies heavily on the plant operators ability to respond to various emergency situations. It has become standard industry practice to utilize simulators to improve the safety and reliability of nuclear power plants operations. The simulators built for Younggwang#3("YGN#3"), which is based on the Korean Standard Nuclear Power Plant ("KSNPP")design, has been developed precisely for this purpose. The YGN#3 simulator is the first simulator in Korea to be developed locally and is now operational on site. A particular attention was placed on the development of CPC/COLLS safety system which is unique to the YGN#3. The effort to develop CPC/COLLS simulation model has been successful and plans exist for applying this model to simulator projects in the future.jects in the future.

  • PDF

Methodology for Developing Standard Schedule Activities for Nuclear Power Plant Construction through Probabilistic Coherence Analysis

  • kim, Woojoong
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.8-13
    • /
    • 2017
  • Nuclear power plant (NPP) constructions are large scale projects that are executed for several years, and schedule control utilizing various schedules is a critically important factor. Recently Korea independently developed the Advanced Power Reactor (APR) 1400 and is building nuclear facilities applying this new reactor type. The construction of Shin-Kori NPP (SKN) Unit 3, which adopted the APR1400, was completed and commercial operation has begun, while, SKN 4, Shin-Hanul NPP (SHN) Units 1&2, and SKN 5&6 are currently under construction. Prior to the development of the APR1400, Korea built 24 reactors and accumulated the schedule data of various reactor types which provided the foundation for schedule reduction to be possible. However, as there is no schedule development and review system established based on the standard schedule data (standard activities, durations, etc.) by reactor type, the process for developing the schedule for new builds is low in efficiency consuming much time and manpower. Also all construction data has been accumulated based on schedule activities. But because the connectivity of activities between projects is low, it is difficult to utilize such accumulated data (causes for schedule delay, causes for design changes, etc.) in new build projects. Due to such reasons, issues continue to arise in the process of developing standard schedule activities and a standard schedule for nuclear power plant construction. In order to develop a standard schedule for NPP construction, i) the development of an NPP standard schedule activity list, ii) development of the connection logic of NPP standard schedule activities, iii) development of NPP standard schedule activity resources and duration, and iv) integration of schedule data need to be performed. In this paper, an analysis was made on the coherence of schedule activity descriptions of existing NPPs by applying the probabilistic methodology on activities with low connectivity due to the utilization of the numbering system of four APR1400 reactors (SHN 1&2 and SKN 3&4).This study also describes the method for developing a standard schedule activity list and connectivity measures by extracting same and/or similar schedule activities.

  • PDF

국내 원전 엔지니어링운영모델 활용성 향상을 위한 시스템 개발 (Development of Electronic Management System for improving the utilization of Engineering Model in Domestic Nuclear Power Plant)

  • 이상대;김정운;김문수
    • 한국안전학회지
    • /
    • 제36권5호
    • /
    • pp.79-85
    • /
    • 2021
  • A standard engineering model that reflects the current organization system and engineering operation process of domestic nuclear power plants was developed based on the Standard Nuclear Performance Model developed by the American Nuclear Energy Association. The level 0 screen, which is the main screen of the engineering model computer system, consisted of an object tree structure, which provided information that is phased down from a higher structure level to a lower structure level (i.e., level 3). The level 1 screen provided information related to the sub-process of the engineering operation, whereas the Level 2 screen provided information related to each engineering operation activity. In addition, the Level 2 screen provided additional functions, such as linking electronic procedures/guidelines, providing electronic performance forms, and connecting legacy computer systems (such as total equipment reliability monitoring system, configuration management systems, technical information systems, risk monitoring systems, regulatory information, and electronic drawing system). This screen level increased the convenience of user's engineering tasks by implementing them. The computerization of an engineering model that connects the entire engineering tasks of an establishment enables the easy understanding of information related to the engineering process before and after the operation, and builds a foundation for the enhancement of the work efficiency and employee capacity. In addition, KHNP developed an online training module, which operates as an e-learning process, on the overview and utilization of a standard engineering model to expand the understanding of standard engineering models by plant employees and to secure competitiveness.

원자력발전소 안전등급 계통 적용을 위한 디지털 상용기기 품질검증 (Commercial Grade Item Dedication of Digital Devices for Safety-related System in Nuclear Power Plant)

  • 홍영희;배병환;박재현
    • 전기학회논문지
    • /
    • 제63권12호
    • /
    • pp.1637-1639
    • /
    • 2014
  • In the past, the analog protection relays have been widely used for the safety-related systems in the nuclear power plants due to their stability and reliability. Meanwhile, as the high performance digital system has been developed, the digital systems have been adopted in the non-safety systems. However, since the digital systems currently used in the non-safety systems were not developed according to Q-class standard, Commercial Grade Item Dedication (CGID) procedure should be performed in order to apply them to the safety-related system. The purpose of this paper is to describe the CGID procedure including the analysis of the hardware architecture as well as the software embedded in protective relay to apply to the emergency diesel generator in the nuclear power plant. The entire CGID procedure was performed strictly according to the international standard and regulations.