• Title/Summary/Keyword: KTX Passenger

Search Result 98, Processing Time 0.027 seconds

Design of A/V Communication System for Passenger and Attendant in Train (열차 내 승무원과의 원격대화 시스템 설계에 관한 연구)

  • Chang, Duk-Jin;Kang, Song-Hee;Park, Hyun-Hue;Kang, Dae-Ho;Heo, Jae-Seok;Song, Dahl-Ho
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.448-454
    • /
    • 2010
  • Currently a KTX train of 20-car formation is 388m long and carries 931 passengers including one captain and three crews which is quite a few to cover the lengthy service area and many customers. On the other hand, if a passenger wants to talk to an attendant, he has to wait for an attendant passing by his/her seat or walk to an intercom which is placed at every other car. Any of these choices is inconvenient. So, in this paper, we presented a system design for developing an audio/visual communication system for a passenger and an attendant. The system was analyzed and designed according to the Object-Oriented methodology with UML (Unified Modeling Language). Based on a problem statement, a Use-case Diagram, Sequence Diagrams, Class Diagram, State Charts, collaboration Diagram were generated. The design will be used in system implementation to a HEMU-400X test train and to be tested.

  • PDF

Study on correlation between general inspection and failure of railway passenger car (객차의 중정비 검수와 고장발생과의 상관관계 연구)

  • Kim, Ju-Won;Kim, Ho-Soon;Yu, Yang-Ha;Jo, Jae-Hoon
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1636-1641
    • /
    • 2011
  • Typically Korea Railroad is executing the limited inspection and general inspection about passenger car by mileage and the time elapsed.(ex. one year, two years) These types of inspection system continue from the beginning of the railroad operation of the steam locomotive age to present. According to the rolling stocks modernized and improved, mileage and the time elapsed for periodical inspection has been expanded but the basic maintainability system of rolling stocks is not that different from the past. This fact needs verification that modern inspection method is right from various fields. In this paper, we analyze the data that we get the maintenance record from Korea railroad company about periodical inspection and failure. Next to considering the correlation of periodical inspection with failure based on analyzed data for watching periodical inspection effects. And we desire to need efficient rolling stock maintenance system better than fixed periodical inspection.

  • PDF

Study on Reliability Analysis of Passenger Car Equipments and Maintenance Connection Plan (일반객차의 장치별 신뢰도 분석과 유지보수 연계방안 연구)

  • Kim, Ju-Won;Kim, Ho-Soon;Yu, Yang-Ha;Jo, Jae-Hoon
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1357-1365
    • /
    • 2011
  • Reliability analysis-based maintenance system has the merit than elapsed time-based preventive maintenance system. First, it is possible to active handling of rolling stocks failures. In the past, Failure handling activities began when after increase failures rapidly. But if we can continuous manage of reliability than changing of failure tendency can know more quickly. Second, It is possible to using maintenance resources effectively. We can look forward to cost reduction to distributing of much less failures parts's maintenance resources. KORAIL builds reliability system called KTX-RCM for operating high-speed rolling stocks. But existing rolling stocks have not reliability system from the past. Fortunately, KORAIL started ERP system called KOVIS at 2007. KOVIS includes maintenance data for reliability analysis. So in this study analysis failure data for getting reliability number about existing passenger car. And we desire to maintenance connection plan.

  • PDF

Defining Rail Transit Level of Service and Analysis of it's Affection According to Rapid Transit Railway(KTX) (고속철도(KTX) 수요에 따른 dwelling time예측 모형개발)

  • Suh, Sun-Duck;Shin, Young-Ho;Shim, Hyun-Jin;Kim, Hwan-Su
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1612-1627
    • /
    • 2008
  • Dwelling time is one of the factors that influence in rail. Current research in dwelling time has been focusing on railways, the state of the research in high-speed rail's dwelling time is not complete. Dwelling time is consisted of time to open door, time to get into and out of vehicle and time of the departure it takes after the passenger's door was closed, it was affected by various factors such as congestion's degree in vehicle, the number of persons that get into and out of vehicle, congestion's degree in station. In order to analyze theses, we need data analysis such as the number of persons that get into and out of vehicle, congestion's degree in station, congestion's degree in vehicle, but the congestion's degree and passenger's distribution chart in vehicle is excluded in this research due to difficulty of gathering data, and thus we will develop forecasting models through high-speed rail's demand most affected by the dwelling time.

  • PDF

A study of the railroad vehicles cycle and method (철도차량 검수주기 및 방법에 관한 연구)

  • Yu, Yang-Ha
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.158-166
    • /
    • 2007
  • After constructing the high-speed railroad, KORAIL acquired advanced maintenance techniques about Rolling-stocks. Also RCM theory is applied to maintenance field like as inspection period and method. In the meantime, the development of the maintenance methode for Rolling-stock is slow when it compares to the components and system technology. For this reason KORAIL tries to build the optimal maintenance system which can lead the Rolling-stock maintenance technique. The existing vehicle except High Speed train KTX are separated to electric motor car, electric locomotive, diesel locomotive, diesel car, passenger car and freight car. The inspection period and methode for existing vehicles which mentioned above will be examined and the optimal Rolling-stock maintenance technique will be applied.

  • PDF

Reducing the Interior Noise of the Korean High-speed Train Using Geometric Acoustic Method (기하음향 기법을 적용한 한국형 고속철도 실내소음 저감 방안)

  • Kim, Kwan-Ju;Park, Jin-Kyu
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.12 no.6
    • /
    • pp.431-436
    • /
    • 2002
  • The interior sound pressure level of the Korean high-speed train(KHST) is predicted by geometrical acoustic method. For the Purpose of assuring the prediction of Interior noise of KHST by the geometrical acoustic scheme, calculated sound level values of the Korean train express(KTX) by Identical geometrical method are compared with measured values of KTX prototype vehicle by experiment. Contribution of individual sound source of KHST vehicle Into the interior response positions is calculated and sound sources are classified in influential order. Hence, it is reasonable approach to reduce sound power of most contributing noise source first. Sensitivity of the interior response position's sound pressure level (SPL) with respect to train wall sections' transmission loss are carried on and acoustically sensitive spot is identified, for example window area for passenger cabin case. Those contribution and sensitivity analysis results are suggested to design quieter train efficiently.

The Service Evaluation of Connection and Transfer Facilities in the High-speed Railway Stations (고속철도역의 연계환승시설 서비스 수준 평가)

  • Han, Sung-Yoeb;Kim, Kang-Seob;Park, Min-Kyu;Kim, Si-Gon
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.761-772
    • /
    • 2009
  • The introduction of KTX (Korea Train eXpress) provided passengers with a much faster mode of transport, and KTX has become a model railway system. Express railway stations are emphasized as public transit transfer centers, but their service evaluations were not performed appropriately so far. It is possible to know the level of service by developing valuation criteria for their evaluations. The evaluation of transfer centers mainly consists of two parts; connective service with other travel m odes, and transfer service inside transfer stations. Connection is defined as the inter-connection of multi-transportation vehicles, and transfer means that a passenger changes his travel mode to another. Such connective service and transfer service are evaluated by the level of service in terms of transfer facilities, the appropriateness of station layout and the quality of information throughout the facilities. We developed the service evaluation indicators of connective facilities and referred to the indicators of transfer facilities. We examined the 7 stations in Korea that are currently in operation and standardized the methodology of the evaluation process by applying the indicators suggested in this study.

  • PDF

Cross-Sectional Imaging of Elastic Modulus for Railway Trackbed under Ballast for Identification of Potential Settlement (침하가능성 확인을 위한 자갈도상 철도노반의 탄성계수 단층영상화)

  • Joh, Sung-Ho;Hwang, Seon-Keun;Hassanul, Raja;Abd Rahman, Norinah
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.3
    • /
    • pp.256-261
    • /
    • 2011
  • Recently a limited section of trackbed with ballast at KTX railway were reported to have settled down and led to problems such as reduced speed and passenger discomfort. Therefore, an urgent remedy for the settled trackbed is required to recover normal operation of KTX trains. In this paper, a new technique is proposed to visualize the elastic modulus of cross sections at railway trackbeds under ballast for practical identification of potential settlement. The proposed technique is based on ICSW technique, enabling use of impact source and overcoming inherent limitations of CSW method. To verify validity and feasibility of the proposed method, the method was employed to construct cross-sectional images of elastic modulus of two railway trackbeds and compared with other tests such as SASW, PBT, DCP and portable FWD tests.

Analytical Study to Check Safety of Folding-type Staircase in High Speed Rolling Stock (접이식 고속열차 승강문 스텝의 안전성 확인을 위한 해석적 연구)

  • Lee, Weon-Dae;Park, Sang-Kyu;Lee, Kyung-Kyu;Lee, Jeong-Hun
    • Journal of the Korean Society for Railway
    • /
    • v.17 no.2
    • /
    • pp.87-93
    • /
    • 2014
  • The KTX, running in Korea but imported from Alstom Co. in France, has folding type staircases complying with European standard EN 4752. However, when operating, the step size is only 200mm, while the Korean standard step size is 253mm, a standard reflecting the average value of persons aged 20~60. From the aspect of kinesiology, the current step size can cause falls or slips during embarking and disembarking of passengers because body load is mostly focused on the heel and the current step is much more narrow than the standard size. Thus, we have performed an analytical study to check the safety of folding type staircases on the KTX after re-design.

Analysis of Trial Test for ATP On-board Equipment of Tilting Train (틸팅열차 ATP 차상장치의 시운전시험 분석)

  • Baek, Jong-Hyen
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.10
    • /
    • pp.3911-3916
    • /
    • 2010
  • In this paper we describe contents and results on running test for ATP on-board equipment, which has propelled as one of the research projects, so called, "Reliability assessment and operation technology development for Korean-type tilting trains" in order to ensure the safety and operation efficiency of tilting trains. We developed tilting trains for the speed-up of conventional lines and for the passenger service improvement where the KTX is not available. And we made progress the operation trial test in the 120,000 km distance with the use of ATS equipment, used in existing lines, for the purpose of the reliability assessment of the developed tilting trains. We decided to accelerate the speed for more than 200km/h with respect to the 6 existing lines including Jungang-line and Chungbuk-line where KTX has not operated. According to this decision, Train control system is to be changed from ATS to ATP. We should have installed an ATP on-board unit in tilting trains and verified the operational suitability, therefore we installed the same ATP on-board unit on tilting trains as that used in the ATP construction project on Gyeongbu-line and Honam-line, and verified that the function and performance of the installed ATP on-board unit conformed to the tilting trains operation.