• Title/Summary/Keyword: KHNP

Search Result 363, Processing Time 0.026 seconds

Study on Quantification Method Based on Monte Carlo Sampling for Multiunit Probabilistic Safety Assessment Models

  • Oh, Kyemin;Han, Sang Hoon;Park, Jin Hee;Lim, Ho-Gon;Yang, Joon Eon;Heo, Gyunyoung
    • Nuclear Engineering and Technology
    • /
    • v.49 no.4
    • /
    • pp.710-720
    • /
    • 2017
  • In Korea, many nuclear power plants operate at a single site based on geographical characteristics, but the population density near the sites is higher than that in other countries. Thus, multiunit accidents are a more important consideration than in other countries and should be addressed appropriately. Currently, there are many issues related to a multiunit probabilistic safety assessment (PSA). One of them is the quantification of a multiunit PSA model. A traditional PSA uses a Boolean manipulation of the fault tree in terms of the minimal cut set. However, such methods have some limitations when rare event approximations cannot be used effectively or a very small truncation limit should be applied to identify accident sequence combinations for a multiunit site. In particular, it is well known that seismic risk in terms of core damage frequency can be overestimated because there are many events that have a high failure probability. In this study, we propose a quantification method based on a Monte Carlo approach for a multiunit PSA model. This method can consider all possible accident sequence combinations in a multiunit site and calculate a more exact value for events that have a high failure probability. An example model for six identical units at a site was also developed and quantified to confirm the applicability of the proposed method.

Job Assignment basis on Assistant-staff for The Information security improvement of Public Institution (공공기관 정보보안수준 향상을 위한 분임담당자 중심 업무분장 개선에 관한 연구)

  • Kim, Sang-Kyoon;Kim, In-Seok
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.20 no.11
    • /
    • pp.2007-2013
    • /
    • 2016
  • It was found to have hacking attempts totaling 115,000 to target the public sector since 2011 to 2015. National Intelligence Service was conducting survey information security management states of a wide range of national-public institutions up to 800 including government agencies in the 2012, while instructing to complement shortcomings. However, there is still going to occur invasions, such as Korea Hydro & Nuclear Power hacking. Even though KHNP's security personnel was only 53 people, in the total 20,000 workforces, got the almost perfect score in the 2013 and 2014 related to information security personnel. Through them, we can confirm that between the organizational response to information security incidents and something theoretical is very far. In this paper, we suggest solutions not using the professional staff management but the non-professional staff management to upgrade the level of public agencies information security.

Excessive Leakage Measurement Using Pressure Decay Method in Containment Building Local Leakage Rate Test at Nuclear Power Plant (원전 격납건물 국부누설률시험에서의 압력감소법을 이용한 과다누설 측정 방법)

  • Lee, Won Kyu;Kim, Chang Soo;Kim, Wang Bae
    • Journal of the Korean Society for Nondestructive Testing
    • /
    • v.36 no.3
    • /
    • pp.231-235
    • /
    • 2016
  • There are two methods for conducting the containment local leakage rate test (LLRT) in nuclear power plants: the make-up flow rate method and the pressure decay method. The make-up flow rate method is applied first in most power plants. In this method, the leakage rate is measured by checking the flow rate of the make-up flow. However, when it is difficult to maintain the test pressure because of excessive leakage, the pressure decay method can be used as a complementary method, as the leakage rates at pressures lower than normal can be measured using this method. We studied the method of measuring over leakage using the pressure decay method for conducting the LLRT for the containment building at a nuclear power plant. We performed experiments under conditions similar to those during an LLRT conducted on-site. We measured the characteristics of the leakage rate under varies pressure decay conditions, and calculated the compensation ratio based on these data.

Study on the Network Design of Rainfall for Operation of KHNP Dam (한수원(주) 댐 운영을 위한 강우관측망 설계에 관한 연구)

  • Lee, Yeon-Kil;Jang, Bok-Jin;Jung, Sung-Won;Kim, Tae-Soon;Han, Ki-Hak
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2011.05a
    • /
    • pp.326-330
    • /
    • 2011
  • 댐의 최적운영을 위해서는 강우량, 유량, 토양수분량, 증발산량과 같은 수문자료는 필수적이다. 이중 강우량과 유량자료는 치수 중심의 댐 운영에 가장 중요하게 이용되며, 국가 수자원계획, 이수 및 환경 계획 등에도 다목적으로 활용된다. 강우량은 면적 강우량을 대표할 수 있는 위치에서 관측되어야 점 강우량을 면적 강우량으로 환산하는데서 발생되는 오차를 최소화할 수 있다. 이는 실제 발생되는 연속형 강우량과 강우관측소에서 관측되는 이산형 강우량의 차가 최소화될 때 가능한 일이다. 최근 강우 특성은 급 점진적으로 변화하고 있다. 과거에 비해 매우 시공간적으로 불규칙해졌으며, 특히 짧은 지속시간 동안 많은 양의 강우가 집중되고 있다. 이와 같은 강우 특성 변화는 강우관측망에 반드시 반영되어야 한다. 강우 특성을 반영하여 댐을 효율적으로 운영하기 위해서는 기존 관측망에 대한 재평가가 선행되어야 하며, 재평가된 결과를 토대로 관측망을 개선해야 한다. 이에 따라 본 연구에서는 최근 10개년(기상청)의 강우자료를 Kriging method로 공간 분포시켜 연속형 강우량과 강우관측소에서 관측되는 이산형 강우량의 차가 최소화될 수 있는 강우관측망을 구축하였다. 강우관측망을 구축한 결과, 최소 72개소의 강우관측소가 필요하였다. 기관별로는 한수원(주) 29개소(화천댐 유역, 신설 2개소 포함), 국토해양부 18개소, 한국수자원공사 4개소, 기상청(유인 및 무인) 21개소로 구축되었다. 본 연구에서 설계한 강우관측망은 대략 평균 $100km^2$의 밀도로 구축되었으며, 팔당댐 유역에서 가장 크게 개선되었다.

  • PDF

Decay Heat Evaluation of Spent Fuel Assemblies in SFP of Kori Unit-1

  • Kim, Kiyoung;Kim, Yongdeog;Chung, Sunghwan
    • Proceedings of the Korean Radioactive Waste Society Conference
    • /
    • 2018.11a
    • /
    • pp.104-104
    • /
    • 2018
  • Kori Unit 1 is the first permanent shutdown nuclear power plant in Korea and it is on June 18th, 2017. Spent fuel assemblies began to be discharged from the reactor core to the spent fuel pool(SFP) within one week after shutdown of Kori unit 1 and the campaign was completed on June 27th, 2017. The total number of spent nuclear fuel assemblies in SFP of Kori Unit-1 is 485 and their discharging date is different respectively. So, decay heat was evaluated considering the actual enrichment, operation history and cooling time of the spent fuel assemblies stored in SFP of the Kori Unit-1. The code used in the evaluation is the ORIGEN-based CAREPOOL system developed by KHNP. Decay heat calculation of PWR fuel is based on ANSI/ANS 5.1-2005, "Decay heat power in light water reactors" and ISO-10645, "Nuclear energy - Light water reactors - Calculation of the decay heat power in nuclear fuels. Also, we considered the contribution of fission products, actinide nuclides, neutron capture and radioactive material in decay heat calculation. CAREPOOL system calculates the individual and total decay heat of all of the spent fuel assemblies in SFP of Kori Unit-1. As a result, the total decay heat generated in SFP on June 28th, 2017 when the spent fuel assemblies were discharged from the reactor core, is estimated to be about 4,185.8 kw and to be about 609.5 kw on September 1st, 2018. It was also estimated that 119.6 kw is generated in 2050 when it is 32 years after the permanent shutdown. Figure 1 shows the trend of total decay heat in SFP of Kori Unit-1.

  • PDF

Thermal Image Processing and Synthesis Technique Using Faster-RCNN (Faster-RCNN을 이용한 열화상 이미지 처리 및 합성 기법)

  • Shin, Ki-Chul;Lee, Jun-Su;Kim, Ju-Sik;Kim, Ju-Hyung;Kwon, Jang-woo
    • Journal of Convergence for Information Technology
    • /
    • v.11 no.12
    • /
    • pp.30-38
    • /
    • 2021
  • In this paper, we propose a method for extracting thermal data from thermal image and improving detection of heating equipment using the data. The main goal is to read the data in bytes from the thermal image file to extract the thermal data and the real image, and to apply the composite image obtained by synthesizing the image and data to the deep learning model to improve the detection accuracy of the heating facility. Data of KHNP was used for evaluation data, and Faster-RCNN is used as a learning model to compare and evaluate deep learning detection performance according to each data group. The proposed method improved on average by 0.17 compared to the existing method in average precision evaluation.As a result, this study attempted to combine national data-based thermal image data and deep learning detection to improve effective data utilization.

A classification of electrical component failures and their human error types in South Korean NPPs during last 10 years

  • Cho, Won Chul;Ahn, Tae Ho
    • Nuclear Engineering and Technology
    • /
    • v.51 no.3
    • /
    • pp.709-718
    • /
    • 2019
  • The international nuclear industry has undergone a lot of changes since the Fukushima, Chernobyl and TMI nuclear power plant accidents. However, there are still large and small component deficiencies at nuclear power plants in the world. There are many causes of electrical equipment defects. There are also factors that cause component failures due to human errors. This paper analyzed the root causes of failure and types of human error in 300 cases of electrical component failures. We analyzed the operating experience of electrical components by methods of root causes in K-HPES (Korean-version of Human Performance Enhancement System) and by methods of human error types in HuRAM+ (Human error-Related event root cause Analysis Method Plus). As a result of analysis, the most electrical component failures appeared as circuit breakers and emergency generators. The major causes of failure showed deterioration and contact failure of electrical components by human error of operations management. The causes of direct failure were due to aged components. Types of human error affecting the causes of electrical equipment failure are as follows. The human error type group I showed that errors of commission (EOC) were 97%, the human error type group II showed that slip/lapse errors were 74%, and the human error type group III showed that latent errors were 95%. This paper is meaningful in that we have approached the causes of electrical equipment failures from a comprehensive human error perspective and found a countermeasure against the root cause. This study will help human performance enhancement in nuclear power plants. However, this paper has done a lot of research on improving human performance in the maintenance field rather than in the design and construction stages. In the future, continuous research on types of human error and prevention measures in the design and construction sector will be required.

Study on the Correlation Between the Upwelling Cold Waters and Cochlodinium polykrikoides Red Tide in the Southeast Sea of Korea (한국 남동해역의 냉수대 발생 변화와 Cochlodinium polykrikoides 적조와의 상관성 연구)

  • Kim, Bum-Kyu;Hwang, Do-Hyun;Bak, Su-Ho;Kim, Heung-Min;Unuzaya, Enkhjargal;Kim, Dae-Hyun;Yoon, Hong-Joo
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.14 no.3
    • /
    • pp.559-572
    • /
    • 2019
  • In the southeast sea of Korea, the cold water is concentrated in every summer, showing in abnormal oceanic conditions. Cold water occurred in the southeast sea is dominantly influenced by wind, which occurs when the south wind is continuously blowing for 3 to 7 days more. In this study, water temperature, wind speed and direction data of KMA, KHOA and KHNP, Chlorophyll-a of COMS/GOCI, GHRSST Level 4 SST of NASA, and red tide alert data of the National Institute of Fisheries Science were used to analyze the correlation between occurrence and change of the cold water and the red tide of Cochlodinium polykrikoides. The upwelling cold water mass showed a characteristic of moving northward along the current and occurrence a high concentration of chlorophyll along the water mass. Also, when the warm current were strong, the characteristic of red tide showed a northward moving.

Proposal for the list of potential radionuclides of interest during NPP site characterization or final status surveys

  • Seo, Hyung-Woo;Oh, Jae Yong;Shin, Weon Gyu
    • Nuclear Engineering and Technology
    • /
    • v.53 no.1
    • /
    • pp.234-243
    • /
    • 2021
  • In the research or project planning for the decommissioning of a nuclear power plant, one of several preparations will be the establishment of a list of potential radionuclides to be considered at the time of characterization or final status surveys. Reliable data for selection of potential radionuclides during the transition period to prepare for decommissioning will depend heavily on historical data at the site or, where possible, sampling analysis. However, during the transition period, direct sampling can be challenging, depending on the circumstances of the site or national regulation. A methodology of selecting potential radionuclides for nuclear facility sites which largely consists of three major processes: production of initial list of radionuclides, selection of the insignificant radionuclide that will be eliminated, and consideration of site characterization or sampling. For developing a preliminary list of potential radionuclides for Kori Unit 1 decommissioning, the list of initial radionuclides was made referring to the technical documents applied at decommissioned NPPs in the U.S and additional reference materials applied until the operation of NPPs in Korea. For the screening of insignificant radionuclides, we applied criterion of less than 0.1% of the amount of radioactivity inventory and confirmed the dose fraction using the RESRAD code. The final suit of radionuclides was established, which should be supplemented by reflecting site characterization and sampling process in the future. Thus, the methodology and results for the selection of potential radionuclides suggested in this paper can give an insight as a future reference to deriving DCGLs in relation to site remediation of decommissioning nuclear plants.

Development of Electronic Management System for improving the utilization of Engineering Model in Domestic Nuclear Power Plant (국내 원전 엔지니어링운영모델 활용성 향상을 위한 시스템 개발)

  • Lee, Sang-Dae;Kim, Jung-Wun;Kim, Mun-Soo
    • Journal of the Korean Society of Safety
    • /
    • v.36 no.5
    • /
    • pp.79-85
    • /
    • 2021
  • A standard engineering model that reflects the current organization system and engineering operation process of domestic nuclear power plants was developed based on the Standard Nuclear Performance Model developed by the American Nuclear Energy Association. The level 0 screen, which is the main screen of the engineering model computer system, consisted of an object tree structure, which provided information that is phased down from a higher structure level to a lower structure level (i.e., level 3). The level 1 screen provided information related to the sub-process of the engineering operation, whereas the Level 2 screen provided information related to each engineering operation activity. In addition, the Level 2 screen provided additional functions, such as linking electronic procedures/guidelines, providing electronic performance forms, and connecting legacy computer systems (such as total equipment reliability monitoring system, configuration management systems, technical information systems, risk monitoring systems, regulatory information, and electronic drawing system). This screen level increased the convenience of user's engineering tasks by implementing them. The computerization of an engineering model that connects the entire engineering tasks of an establishment enables the easy understanding of information related to the engineering process before and after the operation, and builds a foundation for the enhancement of the work efficiency and employee capacity. In addition, KHNP developed an online training module, which operates as an e-learning process, on the overview and utilization of a standard engineering model to expand the understanding of standard engineering models by plant employees and to secure competitiveness.